Resume

Sign in

Engineer Project

Location:
Hazm Al Markhiya, Qatar
Salary:
0
Posted:
September 23, 2019

Contact this candidate

Resume:

Nationality:

Palestine

Date of Birth

**-***-****, ****, *****

Languages:

Fully Bilingual:

Arabic and English

Career Profile:

I am presently a Site Architect having more than 28 years of Engineering experience in the Architectural Interior fit outs works and site supervision for Architectural finishing in a number of great projects such as Airports, Hospitals, Hotels, Housing Developments, Recreational clubs, Museum, Soft and Hard landscaping projects. I also have an extensive experience in project management in the construction of High rise office buildings, also designing works of private villas and residential buildings.

Academic Qualifications:

Architectural Engineering, State Technical Institute at Memphis (State Tech), MEMPHIS, TENNESSEE, USA, (1992).

Courses / Seminars / Trainings / Workshops / Professional Memberships

National Fire Protection Association (NFPA), USA. I had a training course in NFPA at Civil Defence Dept. Fire Protection Exhibition at Qatar Exhibition Centre, Doha, Qatar (2009).

Business training certificates; MBA courses in human resource Dept., purchasing of materials, material evaluation, preparing of visibility study for a project and sales and marketing course. All of my business courses were organized by Qatar Foundation (QF) special training staff and conducted at The Social Development Centre, Doha, Qatar (2010).

ICDL Computer Training Courses at Qatar Ahly Centre, Doha, Qatar (2008).

Summary Professional Experience:

1.Site Engineer (Arch.), ASTAD Project Management

Doha, Qatar

2.Sr. Architect & Project Coordinator, Dar Al-Handasah Consultants (Shair & Partners) Doha, Qatar

3.Interior Designer and Sales Engineer, Nabina Trading Est.

Doha, Qatar

4.Assistant Engineer, Condotte and Partners (Italy), Qatar Branch.

Doha, Qatar.

5.QC Linguist, Titin Corporation (USA), Qatar Branch

US Army Camp, Al-Saliyah Camp. Doha, Qatar.

Work History:

Oct. 2018 – To date

Sr. Construction Supervisor

Nov. 2013 – Oct. 2016

Site Engineer (Arch.)

ASTAD Consult, Doha, State of Qatar

Roles and responsibilities of the position includes following:

Qatar National Museum, as a member of ASTAD’s construction management team in NMoQ project, my duties are ranging from site supervision of Architectural/Civil, monitoring the contractors’ construction works and updating ASTAD management about the construction process in general.

ASTAD Project Management, Doha, State of Qatar

Roles and responsibilities of the position includes following:

Qatar Petroleum District Project, Client’s representative handling the duties of project management ranging from Client Brief to the final tendering process.

Coordination with Design Consultancy office, Contractors site supervision and collaboration with the Client to implement any issued site instruction.

Part of QP’s Construction management team in QPD Project, my duties are ranging from site supervision of architectural/Civil, monitoring the contractor construction works and updating QP management about the construction process in general.

Coordinate with the design consultancy office and the contractor all Arch./Civil design modifications and collaborate with the Client to implement all advised instructions.

Organize weekly progress meetings with the Contractors for the project progress and issue reports to the management.

Review of Architectural and Interior design drawings.

July 1996 – Oct 2013

Senior Architect & Project Coordinator

Dar Al-Handasah Consultants (Shair & Partners), Doha, State of Qatar

Roles and responsibilities of the position includes following:

Site supervision for Architectural works and Quality Controller for Construction works of Soft and hard landscaping.

Review of All Interior Design materials. Organize weekly progress meetings with the Client rep. and the Contractors.

Organize weekly progress meetings with the Client rep. and the Contractors.

Preparing Monthly Progress Reports for the on-going construction works to all 3 packages.

Review of Contractor claims and provide recommendation of payments.

Review / Approvals of all Architectural works; building materials and shop drawings submittals.

Issue site instructions; site memos and Consultant’s letters to the Contractors and the Client representatives.

Upgrading Architectural design drawings using Auto CAD computer program.

May 2012 up to Oct. 2013

Sr. Architect & Project Coordinator

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Client: Private Engineering Office (PEO)

The Project: Development of Barzan Camp, Wajbah, Package 1, Phase 2 and Package 1.

The Project Value: QR 620 Million.

Approximate Gross Built Up Area: 111,621.20 m2 divided between 3 projects:

The Project: Group Command Buildings.

The Project Value: QR 95,542,413.40 Million.

Approximate Gross Built Up Area: 15,756.29 m2.

The Project: Supreme Command Building

The Project Value: QR 153 Million

Approximate Gross Built Up Area: 28,092.99 m2.

The Project: Barrack Buildings

The Project Value: QR 370 Million.

Approximate Gross Built Up Area: 67,772 m2.

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Client: New Doha Port Project Steering Committee (NDPPSC) AECOM (PMC), COWI (EC), CHINA HARBOUR, (CHEC), MEDCO (Middle East Dredging Company)

The Project: New Doha Port Project (NDPP), Environmental Compliance Monitoring.

The Project Value: QR $7 Billion.

August, 2008 – May, 2012:

Senior Architect & Project Coordinator

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

Project: ST. Regis Hotel and Residential Towers Project.

The Project Value: QR 1.5 Billion.

Approximate Gross Built up Area: 246,000 m2.

May, 2008 – August, 2008:

Resident Engineer

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: Qatar Foundation - New Facilities for Northwestern University at Qatar (NUQ).

The Project Value: QR 28 Million.

Approximate Gross Built up Area: 1600 m2.

May, 2008 – Dec, 2008:

Senior Architect

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: Qatar Foundation - Qatar Academy II at Al-Khor City.

The Project Value: QR 63 Million.

Approximate Gross Built up Area: 23,500 m2.

May, 2007 – April, 2008:

Assistant to Project Manager

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: The Doha High Rise Office Building.

The Project Value: $ 114,260 million.

Approximate Gross Built up Area: 50,174 m3.

Dec, 2006 – April, 2007:

Senior Architect.

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: The Pearl Qatar Island Project.

The Project Value: $ 195 million.

Approximate Gross Built Up Area: 230,000m2.

Oct, 2004 – Nov, 2006:

Senior Architect.

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: Qatar Airways - New Facilities for Doha International Airport (DIA) Project.

The Project Value: $ 56.55 million.

Approximate Gross Built Up Area: 23,874 m2.

Jan, 2000 – Sep, 2004:

Site Architect.

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: AL-Ahli Hospital Project.

The Project Value: $ 55 million.

Approximate Gross Built Up Area: 47,000 m2.

Aug, 1998 – Dec, 1999:

Senior Architect.

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: QGPC, Dukhan Housing Project (Phase 2).

The Project Value: $ 12 Million.

Approximate Gross Built-Up Area: 17,000 m2.

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: QGPC, Dukhan Housing Project (Phase 1)

The Project Value: $ 16.5 Million

Approximate Gross Built-Up Area: 37,500m2

July, 1996 – July, 1998:

Site Architect.

Dar Al-Handasah Consultants (Shair & Partners), Doha, Qatar

The Project: QGPC, Ras Laffan Housing Project (Ras Gas).

The Project Value: $ 60 Million.

Approximate Gross Unit Built-Up Area: 160,000 m2.

May 1995 – June 1996:

Interior Design and Sales Engineer

Nabina Trading Establishment, Doha-Qatar

The Project: Interior Designing works for a number of private Villas, Commercial and Residential Buildings at various locations in the State of Qatar.

Total Projects Value: $ 2 Million.

Roles and responsibilities of the position includes following:

Executing the duties of site supervision, Nabil has done the works for a number of ID material installation projects (i.e. private villas, commercial buildings and restaurants).

Handling the works of Interior Design for many private investors and Commercial complex projects.

Marketing and Sales of various types of building materials merchandise.

July, 1992 – April, 1995, Assistant Engineer

Condotte and Partners (Italy), Doha, Qatar

The Project: Ras Laffan Port Project.

The Project Value: $ 800 Million.

Approximate Gross Unit Built-Up Area: 300 Million m2 i.e. Dredging value of 20 Million m3 and 170,000 m3 area of rock works.

Roles and responsibilities of the position includes following:

Assistant to the Head of the Engineering Department.

Organizing and checking of construction drawings and tender documents.

Coordinating technical matters with the Consultants and Client’s rep.

Auto Cad Operator.



Contact this candidate