Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Salem, Tamil Nadu, India
Salary:
5 lakh
Posted:
December 07, 2019

Contact this candidate

Resume:

RESUME

Door No.***,

Karakuppam (Vill),

Emakalnatham Po,

Bargur(Tk)

Krishnagiri (Dt),

Mobile: +919*********

M.GANESAN

PERSONAL PROFILE

Date of Birth : 10th June 1985

Nationality : Indian

Marital Status : Married

E-mail ID : ada0p1@r.postjobfree.com

‘C’ License No. : C-38885

Pass port No : L2887402

Qualification : BE (PT) in Electrical & Electronics Engineering (2015)

Qualification : Diploma in Electrical & Electronics Engineering (2007)

Computer Exposure : AUTOCAD (Foundation)

Experience : 13 Years

Notice period : 30 days

PROFESSIONAL EXPERIENCE

1.Working Senior Engineer – Electrical (Project Proposal) in Chemin C&I Pvt Ltd Pondicherry from April 2019 to till date.

Preparing Quotation for E& I tenders, Attending commercial, Technical discussions and converting it into orders

Making planning, Co-ordination for sites, finalizing sub-contractors, sub vendors & Order execution.

JOBS INVOLVED

Major Projects Handlednt.

1.Stranich 851 - Test Bed Control System.

2.Hamon SEAL AIR HEATER BANK for ELECTROSTATIC PRECEIPITATOR FOR RECOVERY BOILER 500 TDS/DAY

3.Flowserve Seal Gas Booster Compressor Automation

2.Worked as Senior Engineer – Electrical & Instrumentation in Fives Cail KCP Ltd Chennai from Sep 2010 to April 2019.

JOBS INVOLVED

Complete Engineering design of Electrical Distribution system for a 12000 TCD sugar manufacturing plant and 3500 TCD sugar manufacturing plant.

Complete Engineering design of Electrical Distribution system for a 2 x 110 TPH steam generating plant.

Daily monitoring of plant operations, quality and MIS of 1 x 20.5 MW and 1 x 28 MW co-Generation power plant and 2 x 3000 TCD sugar plant.

Providing techno commercial feasibility for projects related to running factory and new projects.

Supporting the purchase team for centralized purchase of equipments.

Complete Detailed Engineering of Electrical distribution system for new sugar and power plant.

Conducting inspection of electrical equipments including HT and LT motors, HT Breaker panel, Transformers, Bus ducts, PCC, VFD panels and MCC’s.

Engineering design of PCC, MCC and preparing Cable schedule and Cable tray calculation.

Preparing Cable Schedule, Cable tray routing and earthing layouts.

Worked in 28 MW Co-Generation power plants CVPL make 110 T, 110 ATA pressure capacity.

Electrical

Reviewing of all Documents and SLD Drawings from Consultant & Vendors for the Final approval.

Selection of Electrical Equipment’s, cable Size selection & scheduling, cable length estimation as per the Standards.

Follow-up with vendor and consultant through mails and phone calls for proper flow of document submission and drawings approval.

Coordinate with vendor and our procurement team to arranging the material availability for electrical packages at right time and ensuring the no delay in project activities.

Resources planning & allocation for the site work.

Erection, Testing & Commissioning of VFD, HTPCC, LTPCC, MCC, soft starter & Control Panels

Erection, Testing & Commissioning of all Equipment’s LV & HV Motors

Erection, Testing & Commissioning of Power & Convertor transformers

Erection, Testing & Commissioning of Bus Ducts

Erection, Testing & Commissioning of 3.3kv & 11KV Siemens Switchgears.

Inspection carried for LV & HV Panels Siemens, ABB, Arriva, Innovative &form plastic.

Inspection carried for LV & HV Motors BHEL, Siemens, ABB & Bharat Bejili.

Commissioning of Siemens VFD Drives Micro master 420.430 and 440, Sinamics-G120 12-pulse & 6-pulse drives.

Commissioning of ABB VFD Drives ACS 550,560, ACS800,ACS 850 & DCS800.

Commissioning of Motorized operated valve RotarK actuators & Auma actuators.

Plant Air conditioning system.(HVAC,Split AC,Centralized AC Units)

Fire monitoring System and& firefighting equipment’s.

Instrumentation

Reviewing P&IDs and preparing Instruments list, (User definable), Selection of Instruments, cable scheduling, cable length estimation, JB grouping &wiring diagrams.

Preparing Hook-up Drawings with bill of materials.

Preparing control loop diagrams, logical descriptions and safety interlocks.

Installation, Programming and commissioning of Allen Bradley PLC & SCADA system for Power sectors and Process Industries.

PLC :RS LOGIX 5000 with Control logix, Compact logix.(Controllers: 1769-L63, 1769-L35E)

Calibrations of instruments, loop checking, preparing I/O list, Ferrules list &Tag list for DCS/PLC.

Calibration and servicing of all types Gauges, Switches, Control Valves, Solenoid Valves and On-Off Valves.

Calibration, Servicing and maintenance of all types of Transmitter Pressure, Flow, Level, Temperature, Thermocouples, RTD.

I/C Engineering support from successful commissioning to integration of new assets into the base plant.

Plant Maintenance

Initiated organized and planned tasks. Effectively executed periodic (corrective and preventive) maintenance of the plant Elect/instrument.

Preparing Spares list for all Electrical & Instruments equipment’s

Preparing & Executing Preventive Maintenance schedule for all equipment’s

Preparing Schedule & Doing Routine maintenance for ACB, VCB, Drives Protection relays & Switchgear.

Train the subordinates about Electrical VFD Drives, soft starter, DOL,SDS & Instrumentation control system Testing & Calibration.

ERECTION & COMMISSIONING

Worked in 20.5 MW Bagasse based CO- Generation & 3500 TCD New green field sugar plant Erection and Commissioning - Villupuram Tamil Nadu India

Worked in 5500 TCD Expansion sugar plant Erection and commissioning work – Mandya Karnataka.

Worked in 500 TPD Refinery sugar plant Erection and commissioning work - Davangere Karnataka.

Worked in 24 & 35 TPH Spent Wash Power plant Erection and commissioning work – VV Sugars Ltd-TN and Jamkhandi Sugars-Karnataka,India.

Worked in 15 MW Bagasse based CO- Generation plant & 6000 TCD New green field sugar plant Erection, commissioning and Maintenance work - West Kenya Sugar LTD - Kenya.(2017-2019)

3.Worked as Jr Engineer – Electrical in GSR Sugars Ltd., UNIT – II, Magi, Telugana– From (Dec. 2009 to Sep. 2010)

JOBS INVOLVED

Shift in Charge Electrical Operation and Maintenance for 16.5 MW Co-Generation Power Plants and 3500 TCD Sugar Plant.

4.Worked as Diploma Trainee Electrical in Rajshree Sugars & Chemicals LTD,Gingee, Villupuram District, From Feb. 2008 to Dec. 2009

JOBS INVOLVED

Electrical Operation and Maintenance for 20.5 MW Co-Generation Power plants and 3500 TCD Sugar Plant.

5.Worked as Diploma Trainee Electrical in Rajshree Sugars & Chemicals LTD, Villupuram District, From April 2007 to Jan. 2008

JOBS INVOLVED

Electrical Operation and Maintenance for 22 MW Co-Generation Power plant.

6.Worked as Ramraj (facilities) in ABC Fruits LTD. Krishnagiri from July 2003 to July 2005.

JOBS INVOLVED

Operation and Maintenance of Electrical equipments

750Kva, 22kv /433 volt Distribution Transformers.

750 Kva, 380 kva,415Volt Diesel Generator.

L & T make PCC & MCC panel.

2 x 250 kva UPS and Batterys.

DECLARATION

I here by confirm that all the information given above is true to the best of my knowledge

Place:

Date: (Ganesan.M)



Contact this candidate