Minimum Qualification and Experience

Has a Bachelor of Science in Mechanical Engineering from University of Science and Technology, Algeria and 26 years of experience in Projects and plants Management (Construction of Commercial & Industrial Buildings, Roads,Bridges Ro Plant, water Effluent treatment plant,Incineration plant,Steel and Wooden Factories ) inside and outside the Kingdom of Saudi Arabia.

Discipline: English & french Writing and Speaking Capabilities: Education:

School Graduation Date Degrees/Certification

BS Mech'l Engineering

Computer Literate:

1 AutoCadd

2 Microsoft Excel

3 Microsoft Word

Experience:

1) Position: Project Manager Duration: March 2017 up to date ( On going ) Employer: Shade Corporation Ltd. (KSA)

Types of Project: Upgrading of the sewer system at Qurayah beach Owner : Saudi Aramco

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection and remedy 2) Position: Project Manager Duration: July 2017 to December 2017 Employer: Shade Corporation Ltd. (KSA)

Types of Project: Dana Bay water park enabling work Owner : Dana Bay Tourisme Company

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection and remedy 3) Position: Project Manager Duration: March 2016 up to date Employer: Shade Corporation Ltd. (KSA)

Types of Project: Improve water supply quality and distribution network in Dhahran Owner : SAUDI ARAMCO

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection and remedy Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of RESUME

Very Good

University of Science and

Nidal Bou Dargham Projects Director /Manager

1992

Mech'l/Elec'l/Civil

Technology

2 of 8

materials submittals, control costing. Monitoring and controling the Safety department. 4) Position: Project Manager Duration: March 2016 to July 2017 Employer: Shade Corporation Ltd. (KSA)

Types of Project: Electric Utilities Relocation MSSD in Dhahran Owner : SAUDI ARAMCO

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection and remedy Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 3 of 8

5) Position: Project Manager Duration: January 2014 up to date Employer: Shade Corporation Ltd. (KSA)

Types of Project: Renovation of the Administration Buildings ( 175&176) in Dhahran Owner : SAUDI ARAMCO

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection and remedy Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 6) Position: Project Manager Duration: March 2013 up to December2013 Employer: Shade Corporation Ltd. (KSA)

Types of Project: CONCRETE WORK and Asphalt Road for SADARA in Jubail Owner : SADARA

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection and remedy Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 7) Position: Project Manager Duration: Jan 2012 up to February 2013 Employer: Shade Corporation Ltd. (KSA)

Types of Project: CONCRETE WORK IN RAS AL KHAIR

MA'ADEN ALUMINUM FACTORY

Owner : MA'ADEN COMPANY

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection and remedy any effects of electro-mechanical works

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 4 of 8

8) Position: Project Manager Duration: Jan 2011 To December2011 Employer: Shade Corporation Ltd. (KSA)

Types of Project: Ship Mock up in Qatar

RAS LAFAN EMMERGENCY AND SAFETY COLLEGE(RLESC)

Owner : Qatar Petroleum

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection, testing and commissioning and remedy any effects of electro-

mechanical works.

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 9) Position: Project Manager Duration: Jan 2010 up To December 2011 Employer: Shade Corporation Ltd. (KSA)

Types of Project: Expansion of multi event center in jubail Owner : Royal Commission in jubail

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection, testing and commissioning and remedy any effects of civil & electro- mechanical works.

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 10) Position: Project Manager Duration: 2009 up To dec 2010 Employer: Shade Corporation Ltd. (KSA)

Types of Project: construction of nine floors commercial building ( Business Gate Tower) Owner : Mohd&Abdullah Al Subeaei co (Al Dammam Area) Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection, testing and commissioning and remedy any effects of civil & electro- mechanical works.

Specific Duties and Responsibilities/Scope of Work: 5 of 8

Represent the company in the project, responsibilities: control all activities under construction, Coordination with the consultant and the client. Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 11) Position: Project Manager Duration: 2009 up to 2010 Employer: Shade Corporation Ltd. (KSA)

Types of Project: construction of one bridge and one under pass with satorp on the Road 274 Jubail Area

Owner : Royal Commission for Jubail & Yanbu (RC)

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction ans inspection

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction Coordination with main contractor (satorp). Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 12) Position: Project Manager Duration: 2008 up to 2009 Employer: Shade Corporation Ltd. (KSA)

Types of Project: Improvement and Development of Security Building (616-C01) Owner : Royal Commission for Jubail & Yanbu (RC)

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection, testing and commissioning and remedy any effects of civil & electro- mechanical works.

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction Coordination with main contractor (RC.). Review and control planning and scheduling, control of materials quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department. 13) Position: Duration:

Employer: Shade Corporation Ltd. (KSA)

Types of Project: Head Quarters Office, Chiller Plant, Site Development and Coast Guard (Seven Facilities & Site Development).

Main Contractor : Saudi Oger Ltd.

Owner : Al-Khafji Joint Operation (KJO), Kuwait Gulf Oil Company

(KGOC), ARAMCO Gulf Operation).

Scope of Employer's Contract: The scope cover all necessary materials, manpower and Engineering for construction, inspection, testing and commissioning and remedy any effects of civil & electro- mechanical works.

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction. Coordination with (saudi oger) and the client (kjo). Review and control planning and scheduling, control of material quantities, qualities, & delivery, control of materials submittals, control costing. Monitoring and controling the Safety department.

Project Manager 2006 up to 2009

6 of 8

14) Position: Duration:

Employer: Shade Corporation Ltd. (KSA)

Types of Project: Facility Improvement @ Khafji Service Center (SCECO - IIP-158) Scope of Employer's Contract: Procurement, Construction, Civil & Electro-Mechanical works.

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction Coordination with Client and Consultant, review and control, planning and scheduling, control of materials quantities, quality and deliveries, control submittals & costing. Monitoring and controling the Safety Department.

15) Position: Duration:

Employer: Akaria Contracting Company (Lebanon)

Types of Project: Construction of the Ministry of Eduction and Higher Education. Project Area 4,000 square meter.

Scope of Employer's Contract: Procurement, Civil & Electro-Mechanical works including HVAC System

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction Coordination with Client and Consultant, review and control, planning and scheduling control of materials quantities, quality and deliveries. Monitoring and controling the Safety Department. 16) Position: Duration:

Employer: Akaria Contracting Company (Lebanon)

Types of Project: Renovation of the Republican Guard Headquarters in Baabda Project area 25,000 square meters

Scope of Employer's Contract: Procurement Civil & Electro-Mechanical works including HVAC System.

Specific Duties and Responsibilities/Scope of Work: Represent the company in the project, responsibilities: control all activities under construction Coordination with Client and Consultant, review and control, planning and scheduling, control of materials quantities, quality and deliveries, control materials submittals. Monitoring and controling the Safety Department.

17) Position: Duration:

Employer: Al-Salem Light Industries (KSA)

Types of Project: SABIN (Food Procesing & Hospital Equipment) and Various Projects Scope of Employer's Contract: Manufacturing, Engineering, Production, Maintenance, Delivery and Stock Department.

Specific Duties and Responsibilities/Scope of Work: Managing and directing all departments and activities, represent the company in the projects. responsibilties: In-charge of all activities, coordinate with the Client for the schedule, control of materials quantities, qualities, and deliveries, safely and timely completion. 2003 up to 2004

Plant Manager 2001 up to 2003

Project Manager 2004 up to 2005

Project Manager

Project Manager

2005 up to 2006

7 of 8

18) Position: Duration:

Employer: Adada and Kabbani (KSA)

Types of Project: Various projects

Scope of Employer's Contract: Production, Maintenance, Technical and Delivery Depts. Specific Duties and Responsibilities/Scope of Work: Managing and directing all departments and activities, represent the company in the projects. responsibilties: In-charge of all activities, coordinate with the Client and the consultant for the schedule, control of materials quantities, qualities, and deliveries, safely and timely completion. Responsible for a crew of 150 personnel.

19) Position: Duration:

Employer: Consolidated Contractors Company (CCC) (Yanbu - KSA) Types of Project: Incinerator Package and Effluent Treatment Plant Scope of Employer's Contract: Installation, Testing & Commissioning Specific Duties and Responsibilities/Scope of Work: Responsibilities: In full charge of incinerator package, and effluent treatment plant. (Installation, Testing and Commissioning).

20) Position: Duration:

Employer: Private Business (Lebanon)

Types of Project: Design of Heat Exchangers and HVAC Sytem Scope of Employer's Contract: Commercial & Residential Buildings Specific Duties and Responsibilities/Scope of Work: Responsibilities: Design of Heat Exchangers, HVAC System and boilers for major local factories and residential buildings.

21) Position: Duration:

Employer: Sukkar Engineering Group (Sukom Company) - Lebanon Types of Project: Operation & Maintenance of Amrousieh Incineration Plant Specific Duties and Responsibilities/Scope of Work: Responsibilities: Full operation and maintenance of the Incineration plant and in-charge of an operational crew of 45 personnel, including 8 engineers. 22) Position: Duration:

Employer: Raymond Najjar & Partners (Lebanon)

Specific Duties and Responsibilities/Scope of Work: In-charge of factory's production and maintenance division. 23) Position: Duration:

Employer: Private Business (Lebanon)

Specific Duties and Responsibilities/Scope of Work: Desing of heat exchangers, central heating and air conditioning systems (HVAC) for local factories and residential buildings.

Site Mechanical Engr.

Factory Manager 1998 up to 2001

Mechanical Engineer 1993 up to 1994

1997 up to 1998

Design Engineer 1992 up to 1993

1994 up to 1996

Design Engineer 1996 up to 1997

Plant Manager

8 of 8

PROFESSIONAL PROJECTS:

Graduation project titled "Thermic Consception of Industrial Furnace". Projects under the following titles: "Steam Turbine", "Gas Turbine", "Boiler", "Injection Pump",

* "Multisage Compressor", and "Internal Combustion Engine", "Tanks", and (HVAC for Residential and Commercial Buildings)

*

Three months training in the Algerian society for tranformation of long products (recycling of metal wastes and transformation into steel rebar).

* Five months training in the Algerian society for metallic construction and heat exchangers (fabrication of high pressure tanks and heat exchangers).

* One month training in Jersey and London (incineration, power, plants, and waste-to-energy plants). Site visit to all waste-to-energy plants in the United Kingdom (Edmonton Power Station, Selchp

"S/East London combined Heat and Power Ltd." Drax power station, Belozanne Incineration and

* Power Plant, Thomson Engineers and Contractors Ltd. London Waste Ltd.). DATE: SIGNATURE: