Bowen Chen
** ******** **., ******, ** *****
857-***-**** ****.*****@*****.***.*** mailto:linkedin.com/in/bowen-chen
EDUCATION
Northeastern University Boston, Massachusetts
Master of Science in Construction Management GPA:3.81 May. 2017
Chongqing University Chongqing, China
Bachelor of Engineering in Civil Engineering Outstanding Graduate Jul. 2014
PROFESSIONAL SKILLS
Construction scheduling and control in Primavera P6, MSP, Synchro, WBS, Navisworks
Designing and modeling in AutoCAD, Revit, MicroStation, Sketch-Up, Tekla, SAP, ANSYS
Construction management in Budgeting & Cost Controls; Bidding/Estimating/Proposals;
Subcontractor / Crew Supervision; QA/QC/Field Engineering;
MS Office; Esri ArcGIS Suit/Civil 3D; Python/Matlab/SQL/XLMiner/HTML/C;
PROFESSIONAL EXPERIENCES
Keolis Commuter Service, MBTA Boston, Massachusetts
Civil Engineering Co-op Jan. 2016 – Aug. 2016
Designed and developed commuter rail signal delay database of greater Boston area which dramatically enhanced database productivity and searching accuracy using MS Access, Excel, SQL, VBA
Analyzed, debugged and built monthly 17 lines of commuter rail delay reports and graphics with multi-reasons, potential problems, and feasibility solutions using MS Access, SQL, XLMiner, Excel, Visio, MS Word
Revised commuter rail line plans, track charts and facility layouts for the Bridge & Building department, as well as built 3D Models for MBTA facility buildings using AutoCAD, MicroStation, Revit, Bluebeam
Accomplished 23 rail station parking demand surveys independently and 8 bridge maintenance reports with minimal oversight, which greatly improved MBTA infrastructure renovation solutions.
isBIM Co., Ltd. / Top 1 BIM Consulting company in China Beijing, China
BIM Engineer May. 2015 – Sep. 2015
The Disneyland Shanghai Project (4.6 billion dollars): Collaborated with Disney Imagineering Team to successfully complete the secondary steel design, built 340,000 sf architectural and structural LOD-400 model for the “Battles for the Sunken Treasure” theme park under AIA Code standard using Revit, Tekla, AutoCAD
The China Zun Project (5.5 billion dollars, 1732 ft): Built 180,000 sf steel structural model, completed the HVAC system design for 51 – 66 floors and ran clash detection for MEP System using Revit, Navisworks, AutoCAD
Tai’an Apartment Project (400 million): Built and updated the whole construction simulating process with existing models and schedules using Synchro, Navisworks, P6, 3D Max, Navigator
Vanke Group / World’s largest residential real estate developer Shenzhen, China
Assistant Project Manager / Place of Baisha Project Jun. 2014 – Sep. 2014
Managed, built, and maintained project baseline schedule with Primavera P6 for the 600,000 sf resort
Reviewed and managed entire project documentation, which includes RFI’s and submittals for compliance, change orders, subcontractor billings, etc., which significantly reduced redundant costs and procedures
Organized and processed meetings with subcontractors and vendors on change orders, insurance, agreements
China State Construction International Group Kunming, China
Project Engineer / The Phoenix Hotel Project Jun. 2013 – May. 2014
Reviewed and analyzed architectural plans for proposed projects, performed plan take-offs and create budget, conceptual, and final estimates for the 200 million dollars, 250,000 sf hotel project
Developed and updated “as built” drawings and documents as scheduled, analyzed earned-value management and wrote weekly construction process report using Primavera P6, AutoCAD, Excel, PowerPoint
Supervised a five-member field team in reviewing deliverables to ensure quality is consistent with requirements
DingJue Institute of Architectural Design Co., Ltd Wenshan, China
Structural Designer Jun. 2012 – Sep. 2012
Accomplished 70,000 sf of structure design for a primary school and 18,000 sf of architecture design for a theatre project independently using SAP, Ansys, AutoCAD, Revit, PKPM
Academic Research & Papers Chongqing, China
Project leader / the 6th National College Students Innovation Experiment Program May. 2012 – Sep. 2013
Published paper “Behavior of Axially Loaded RC Columns with Buckling Restrained Longitudinal Rebars” in China Civil Engineering Journal, earned national patent
Led the experiment research and won the first prize out of 8000 projects, 1st time of Chongqing University history