Education:
Holy Angel University
Angeles City Philippines
Bachelor of Science in
RAUL C.YALUNG
Civil Engineering 1988
*** *******-******** **, *********, Cavite, Philippines
Training & Seminars: Contact No. 099*-***-**** or 099*-***-****
E-mail: aczv70@r.postjobfree.com
PERI Formwork Seminar
PERI LLC, Dubai, UAE
SUMMARY OF EXPERIENCE:
July 08, 2009
Senior Civil Engineer with experience in working for Consulting
Firms, Construction Companies and Real Estate Developers. Projects
Basic Welding Inspection
handled include; bored piling works, raft foundation, high rise
CEG, Doha, Qatar
buildings, post tensioned slabs, hollow core slabs, industrial buildings
June 15 to 16, 2007
and site development works. Well versed in engineering software
such as ETABS, SAP, SAFE, Autocadd 2D & 3D and MS Project.
Overall work experience is 27 years.
Autocadd
Magnacad, Manila,
Date of Birth: July 21, 1966
Phil.Dec. 8-21, 2005
KEY SKILLS:
Primavera P3
Cadvision, Manila, Phil.
Construction Supervision
Jan. 23- Feb. 27, 2005
Project Scheduling
Computer Aided Structural Structural Calculations
Analysis Cost Estimates
Cadvision, Manila, Phil. Property Management
June 20-July 25, 1998
Affiliations:
Road Construction
Philippine Institute of Civil Engineers
Management
CMDF, Manila, Phil. Saudi Council of Engineers
October 9-13, 1995
Project Planning, Language Skills:
Scheculing & Network
Analysis
English (Fluent in speaking and writing)
CMDF, Manila, Phil.
Arabic & Urdu (basic in speaking only)
August 1-3, 1995
Total Quality Managment
CMDF, Manila, Phil.
June 6-8, 1995
WORK EXPERIENCE Review structural shop drawings for correctness and
(from latest work backwards): conformance with detailing requirements of ACI 315 and ACI
318
1. Zuhair Fayez
Partnership Consultants Monitor and supervise daily site activities to ensure
P.O. Box 5445, Jeddah, compliance with contract documents and good engineering
Kingdom of Saudi Arabia practice.
Position: Civil Engineer
Review & approve structural design calculations submitted by
(August 29, 2010 to October 31,
contractor and sub-contractors.
2016)
Projects:
Duties & Responsibilities:
Medical Science College (SR 230 Million)
Three Story School Building on Bored Pile Foundation
Coordination of project
Jizan University Project, Jizan, Kingdom of Saudi Arabia.
drawings to smooth out or
rectify conflicts between
electrical, mechanical,
Business Administration College (SR 115 Million)
civil, plumbing and
Three Story School Building on Bored Pile Foundation
architectural disciplines.
Jizan University Project, Jizan, Kingdom of Saudi Arabia.
Liaising / coordinating
with mechanical engineer,
Students Dormitory (SR 200 Million)
electrical engineer and
Five Story School Building on Bored Pile Foundation
architect for the smooth
Jizan University Project, Jizan, Kingdom of Saudi Arabia.
implementation of the
project.
Supervise the work of
2. Terna S.A.
Surveyor and Civil
P.O. Box 24655, Sharjah, United Arab Emirates
Inspector and smooth out
Position: Site Engineer(October 21, 2008 to May 6, 2010)
any conflict with
Contractors.
Project:
Supervise / monitor
Al Rayyan Complex (USD 208 Million)
QA/QC procedures such as
Three towers (2 Basement +1 Ground Floor + 6 Level Parking +
Pile Load Test, Pile
34 Story)
Integrity Test,
Al Nahda Road, Sharjah, United Arab Emirates
Compressive Strength Test
and other test required by
Project Description:
specification.
The work covers 14,600 square meters of raft foundation works with
Review and comment on
a total concrete volume of 26,000 cubic meters. Self compacting
project documents
concrete is used in the superstructure and three types of shuttering is
submitted by contractor
used (table shutter for post tension slab, self climbing formwork for
such as method statement,
core walls, cup lock system for the beams of Hollow Core Slabs,
material submittal, daily
Steel forms for columns and conventional shutter for other works
report, design mix, and
such as retaining walls and shear walls and cast in situ slab.
company profile of
proposed subcontractors.
Duties & Responsibilities: Supervise site works in accordance with project specification,
method statement, approved and valid construction drawings
and instruction given by the Construction Manager.
Review drawings for
Comply with safety requirements and processes.
correctness and clarity and
take necessary action to
ensure sufficient
information is available for
3. Consulting Engineering Group
construction.
P.O. Box 3793, Doha, Qatar
Request missing Position: Civil Engineer(June 14, 2007 to September 30, 2008)
information in advance to
allow program to proceed Project :
without delay.
School No. 2, 3, 4 & 5
Preparation of works Two Story School Buildings(QR 235 Million)
detailed program based on Ain Khalid, Doha, Qatar.
planning and ensure that
works are clearly set out
before work program is Project Description:
set.
Four identical two story school buildings with site development. The
Organize manpower with structures are reinforced concrete structures with space frame roof
foremen, including covering for the gymnasium and assembly areas. Site development
equipment and materials to works includes asphalting works, sports flooring, open air auditorium
achieve the required and pre-cast concrete perimeter fence.
progress and in compliance
with project quality
requirements in Duties & Responsibilities:
coordination with the
Construction Manager. Supervision, inspection and monitoring of civil and
architectural works to ensure compliance with approved
Prepare daily construction drawings, specifications and good engineering practice.
report showing quantities Filing of project documents as follows: shop drawings, test
executed and allocated reports, specifications, construction schedule, daily report,
labor force. RFIs, NCR and concrete casting log.
Liaising / coordinating with mechanical engineer, electrical
Maintain site diary engineer and architect for the smooth implementation of the
recording daily site project
activities and any
circumstances that have
adverse effect on the 4.MS Maxco International Corporation / International Design &
project. Engineering Center
Phillip Hollzman Building, Al Nusha Quarters, Riyadh, Saudi
Raise RFI to consultant
Arabia.
thru the QA/QC
Position: Civil Engineer (June 28, 2006 to April 25, 2007)
department.
Project :
Assist the QA/QC engineer
Movenpick Hotel - Riyadh
in solving technical
Maather Street coner King Fahd Road, Riyadh, Saudi Arabia.
issueswith consultant.
Description of Project: Secures property by enforcing precautionary policies and
procedures.
1 Basement + 7 Story reinforced Accomplishes financial objectives by collecting association
concrete structure on raft dues, water dues, and presenting the competitive features of
foundation. the property to walk in buyers.
Ensure that staff and security personnel are prepared for
emergency action procedures.
Duties & Responsibilities: Ensure that materials and equipment for emergency repairs
are available on storage.
Supervision, inspection Attending to the concerns of industrial locators.
and monitoring of civil / Assisting property owners with regards to construction cost
structural works to ensure and building permit procedures.
compliance with approved
Attending meetings with municipal mayor, baranggay
drawings, specifications
officials and police officers.
and good engineering
practice.
Filing of project Position: Project Engineer / Manager (November 01, 1996 to
documents as follows: May 31, 1999)
shop drawings, test reports,
specifications, construction Project Description : Dasmarias Technopark
schedule, daily report, 48 Hectares Industrial & Commercial Complex
RFIs, NCR and concrete
casting log.
Supervise site development works: earthworks, road
Structural calculations for concreting works, water supply lines, drainage lines, elevated
other projects of the water tanks, deep well drilling, retaining walls, street lighting,
company. pump rooms, perimeter fencing, guard house and
administration building.
5. FIMA REALTY
Structural calculation for retaining walls and administration
CORPORATION
building.
KM 17 Rincon Street, Malinta,
Valenzuela City, Philippines
Position: Site Manager (June
01, 1999 to June 25, 2006)
6. FIRST CAVITE INDUSTRIAL ESTATE
Property Administration Office
Duties & Responsibilities as Site
Langkaan I, Dasmarias, Cavite, Philippines
Manager for Dasmarias
Position: Site Engineer (May 1994 to October 1996)
Technopark:
Duties & Responsibilities:
Directing and planning
essential services such as
Supervision of repair and maintenance works for roads,
water supply, security,
pumping station, deep well houses, guard house, perimeter
repairs and maintenance
fence, greeneries and administration buildings.
works.
Preparation of annual budget for repairs and maintenance
Checking that agreed
works.
works by staff or
Supervised the topographic survey, geotechnical survey and
contractors has been
water resistivity survey of First Batangas Industrial Park.
completed satisfactorily
Prepared preliminary site development plan and budgetary
and following up of any
cost estimates for the First Batangas Industrial Park.
deficiencies.
Bataan Export Zone, Marivelez, Bataan, Philippines (Sept.
7. TRASS CONSTRUCTION 90 to August 91)
CO., INC. (Category AA
General Contractor) PLDT X5C Installation of underground telephone conduits
Heart of the City & manholes along the busy and congested city roads.
Condominium, Scout Esguerra, Balara, Quezon City, Philippines (August 91 to May 92)
Quezon City, Philippines
Position: Project Engineer Sun Ace Manufacturing Plant -
(September 1990 to March 1994) TwoStoryIndustrialBuilding (5000 sq.m.)
with CanteenBuilding, Employees Locker, GensetBuilding
Duties &Responsibilities: and Site Devt. Works
First Cavite Industrial Estate, Dasmarias, Cavite (May 92 to
Prepare and follow up February 93)
requisition for materials,
equipment and manpower Cambridge Electronics Plant
to ensure timely arrival on -TwoStoryIndustrialBuilding and One Story Warehouse
site. including Waste Water Treatment Plant
Prepare bar cutting list / First Cavite Industrial Estate, Dasmarias, Cavite (April 93
bar bending schedules and to February 94)
other material schedules
for use of foremen.
Supervise work thru the
general foreman and 8. P.R. DE DIOS CONSTRUCTION (Category B. General
charge-hands. Contractor)
2/F Franda Shopping Mall, San Fernando, Pampanga, Philippines
Supervise and coordinate
Position: Field Engineer / Supervisor (October 1989 to August
the works of
1990)
subcontractors for
architectural finishes,
Project:
electrical, mechanical and
landscaping.
Manila Waterworks Rehabilitation Project (Ermita Paco
Updating of bar chart,
District)
weather chart, logbook and
Replacement of old Cast Iron pipes with PVC pipes and construction
progress report.
of Valve Boxes.
Attend site coordination
meeting with project
Duties & Responsibilities:
manager, consultants and
subcontractors.
Supervision of works as per plans, specifications and safety
requirements. Coordination
Projects undertaken at TRASS
with local officials and police officers for the implementation
CONSTRUCTION COMPANY:
of traffic re-routing schemes.
Rehabilitation of Hilltop
Hotel Replacement of
Electro-Mechanical
9. PROVINCIAL ENGINEERS OFFICE OF PAMPANGA,
Systems
PHILS.
and All Exterior &
Sindalan, San Fernando, Pampanga, Philippines (December 1988
Interior Architectural
to October 1989)
Finishes.
Position: CE Aide (Project Employee)
Project:
Steve CounsellEstate Manager of First Cavite Industrial
Construction of RCDG Bridge Estate
including Pile Driving Works e-mail: aczv70@r.postjobfree.com
and Slope Protection Structures
and Approaches. Engineer Wael Khaled Mona Project Manager at Zuhair
Sta. Monica, San Luis, Pampanga, Fayez Partnership
Philippines Contact Number: +966******** email:
aczv70@r.postjobfree.com
Duties & Responsibilities:
Inspection of steel
reinforcement and
formworks for pre-cast
piles and cast in place
bridge deck and girders.
Monitoring of pile driving
works.
Inspection of ancillary
works such as slope
protection and approaches.
Preparation of reports such
as pile driving report,
concrete casting logs and
updating of construction
log book
Monitoring of concrete
mixing at the on-site
batching plant.
Rererences:
Engineer Ashraf
Mahmood Project
Manager of Consulting
Engineering Group
Contact Number :
+974********* Qatar
Mr. Michael Say
President and CEO of MS
Maxco International
Corporation
Contact Number :
Philippines.