Post Job Free

Resume

Sign in

Project Quality

Location:
South Kalimantan, Indonesia
Posted:
April 13, 2017

Contact this candidate

Resume:

Personal Data

Name: Husnan Toha Gender: Male

Passport No: U 708269 Religion: Moslem

Place and Date of Birth: Bangkalan, 28 9 1973 Nationality: Indonesia

Permanent Address Perum Legenda Malaka Block D3/10 Batam Center

Batam Island Kepulauan Riau

Indonesia 29461

Telephone: +62-812-***-**** (Mobile)

+62-778-***-*** (Home)

E-mail: aczsuw@r.postjobfree.com

Education and Qualifications

Sept 1992 March 1997

B.Sc. in Mechanical

GPA: 2.78/4.0

Adhi Tama Institute of Technology of Surabaya (ITATS)

Surabaya Indonesia

Formal Certification  Certified Restriction of Hazardous Substance (RoHS), Green Procurement & Internal Audit Certificate No : tqtm 08035cat.

 Certified Welding Inspector BNSP (Committee of Nasional certification Profession) Certificate No 0103724

 Certified Welding Inspector (Universal Institute for NDT and Welding Inspector) Certificate Number : AWS-WI-036B-08

 Certified Welding Inspector CSWIP3.1 - Certificate Number 55999

 Certified Radiographic interpreter ASNT-Level II-Certificate Number RI-1161

 Certified MT ASNT-LEVEL II Certificate Number MT 20140

 Certified PT ASNT-LEVEL II Certificate Number PT 30140

 Certified UT ASNT-LEVEL II Certificate Number UT 10127

 Certified BOSIET & TSbB Certificate Number 939257071101176777

Employment Record (Onshore & Offshore)

Summary

Feb 2015 to Mar 2017 Saipem Karimun Yard Indonesia

As welding Inspector for Structure, Piping (carbon and exotic material), pre-commissioning, Flange management, Mechanical completion.

Project

• FPU Jangkrik Complex Project at Balai Karimun Indonesia

Main Responsibilities:

Witnessed Welding Procedure Qualification Test and Welder Qualification Test.

Reading the applicable international codes, client specification, and various project procedures.

Inspection activities for structural and piping of carbon and exsotic material.

Material management: check material storage, color coding, monitoring site material handling, cutting, material marking system (item number, heat number, unique number) and verify mill certificates.

Welding consumable control: daily monitoring at site welding consumables storage, consumable issuance and return, drying and holding control,electrode color coding, etc.

Ensuring machines, equipmens, devices in valid calibration date.

Ensuring printed official document shall be under management issue controled.

Fit-up / pre-welding inspection: check material traceability, orientation, alignment, verify dimensional reports, cleanliness, bevel preparation and identification.

In-process welding inspection: check correct use of WPS, consumable, welder, valid calibration of welding machine, divices, preheat, interpass temp, shielding gas, welding monitoring and calculate actual heat input.

Visual welding inspection and arrange request for NDT.

Monitoring and witness NDT, PMI, hardness test, ferrite test, PWHT.

Conduct quality tool box talk for welders, fitters, foremen, supervisors.

Provided the inspection reports, Welding Summary, and pre-painting release notes.

Witness and inspection flange management performing.

Conduct Line check inspection prior pre-test.

Hydro testing inspection included review chart result.

Conducted flushing performed.

Re-instatement and closing punch list.

Jun 2013 to Nov 2014 Conoco Phillips

As welding Inspector for Pipeline, Structure, Piping, and Flange Management.

Project

South Belut Development Project at Natuna sea Indonesia.

Main Responsibilities:

 Witness and review WPS Inspection.

 Witness and review welder qualification.

 Witness and review ITP.

 Review material certificates and witness incoming material inspection.

 Review Flange management procedure and witness flange management on site.

 Review Leak test procedure and witness on site.

 Witness and conduct inspection for Fit-up, Visual, NDT, Flange Management, Piping Line check, Hydro-test, leak-test.

 Monitoring the welding parameter on each station shall be fallow the welding procedure specification that have been approved.

 Monitoring the electrode type, storage, condition, identification, handling, oven temp fallow the quality procedure.

 Review RT film and witness Radiography testing on site.

 Check the equipment calibration validation.

 Witness and conduct inspection for re-facing of flange.

 Witness and review PWHT on site.

 Witness and review PMI on site for stainless steel material.

 Witness open and closed position performed of valves prior lay down, hydro test, and leak test.

 Witness welder qualification test (WQT) for welder repair.

 Unsure the material heat number, pipe number, and length are match with tally sheet record.

 Monitoring and ensure the anode is correct joint position as per engineering stated issue.

 Monitoring and ensure the dummy is correct joint position and Nos as per pipeline installation procedure.

 Witness the installation of the pig into starting head or lay down head.

 Witness the application of detector is correct starting joint application as per pipeline installation procedure.

 Check the equipment calibration validation.

 Monitoring the temporary installation and the de-installed of pulling head include NDT application.

 Witness and record indication included down time when a repair happen, also ensure the repair done as per WPS repair approved.

 Monitoring the bevel cleanliness, preheat, seam pipe arrangement and alignment check during fit up at station one.

 Review and approved the weld history sheet, fit-up and visual report, PWHT, PMI, and NDT (UT, RT,MT,PT) report, Re-facing flange management report, Hydro-test report, Leak-test report.

Mar 2013 to May 2013 KONGSBERG MARITIME ENGINEERING

As Welding Inspector for structure & Piping.

Project

E-House Lamson FPSO Project

Main Responsibilities:

 Monitor and review WPS Inspection.

 Review RT film.

 Review material certificates and incoming material inspection.

 Ensuring and monitoring for equipment s calibration, welder qualification, process and electrode used on site.

 Conduct and perform site project surveillance inspection, supervision to ensure that the fabrication of E-House was meet the classification standard and project specification.

 Carry out the close up survey and visual welding inspection on fabrication including fit up and erection joint to ensure the quality performing.

 Liaise with other party representatives (Subcontractor, client, and other third parties) for ensuring product conformity and stage release for each activity denoted within the Project Quality Plan/I.T.P.

 The MC (mechanical completion) involved for ensure all part have been proper installed as per drawing specification included documentation supporting provided.

 Monitoring the electrode type, storage, condition, identification, handling, oven temp fallow the quality procedure.

 Monitoring the welding parameter on each station shall be fallow the welding procedure specification that have been approved.

 Review the weld history sheet, fit-up and visual report, and NDT (UT, RT,MT,PT) report.

Sep 2012 to Feb 2013

International Supply, Asian Operations

GORGON LNG JETTY & MARINE STRUCTURES

SAIPEM LEIGHTON CONSORTIUM

As Material Coordinator

Feb 2012 Sep 2012

Saipem Karimun Yard Indonesia

As QC Welding Inspector for structure.

Project

Gorgon Deck and Structural Marine for Borrow Island Australia.

Saipem Tanjung Balai Karimun yard Indonesia

Main Responsibilities:

 Monitor WPS Inspection.

 witness WPQT and NDT activities

 Ensuring and monitoring for equipment s calibration, welder qualification and electrode used on site.

 Conduct and perform site project testing, surveillance inspection, supervision to ensure that the fabrication and installation of Pontoon Pile, Deck, Jacket ware meet the classification standard and project specification.

 Carry out the close up survey and visual welding inspection on fabrication including fit up and erection joint to ensure the quality of welding joint.

 Identify non conformity for rectification and assure final resolution.

 Initiate evaluation for non conforming items.

 Liaise with QC/NDT/Certification/Welding Engineering and Contractor to ensure that Quality problems are addressed and technically resolved.

 Appraise product quality in accordance with the Project Quality Plan, Inspection & Test Plan and determine conformity and non conformity. All inspection results need to be documented and if non conformity exists, documentation shall be raised to establish corrective action.

 Provide interpretation of applicable code specifications and requirements.

 Familiarization with code, standard and Client specification.

Aug 2008 Feb 2012

Mosvold Supply PLC - Cyprus

Steel Inspector

Project

4 x VS 491 Clean Design AHTS Vessel 28800 BHP - DP 2 for North Atlantic Sea Operation Batamec Batam Indonesia

Main Responsibilities:

 Direct, supervise and participate in Quality Control activities to determine product conformity to specification through independent inspection and tests in accordance with the Project Quality Plan.

 Review ITP (inspection test plan),NDT plan and WPS ( welding procedure specification).

 witness WPQT (welding procedure qualification test), Mechanical test, and NDT activities

 Ensuring and monitoring for equipment s calibration, welder qualification and electrode used on site.

 Conduct and perform site project testing, surveillance inspection, supervision to ensure that the fabrication and installation of vessel (hull, tank and piping) are meet the classification standard and project specification.

 Carry out the close up survey and visual welding inspection on fabrication including fit up and erection joint to ensure the quality of welding joint.

 Identify non conformity for rectification and assure final resolution.

 Initiate Quality Planning for the project to assure compliance first time through proactive and preventive measures and consult with the Project Quality Manager concerning prevention and appraisal resources and the effectiveness of project Quality Plan/Procedures necessary to achieve the product quality.

 Initiate evaluation for non conforming items.

 Develop Project Quality Plans, Inspection and test Plans in consultation with Project Quality Manager.

 Liaise with QC/NDT/Certification/Welding Engineering and Contractor to ensure that Quality problems are addressed and technically resolved.

 Appraise product quality in accordance with the Project Quality Plan, Inspection & Test Plan and determine conformity and non conformity. All inspection results need to be documented and if non conformity exists, documentation shall be raised to establish corrective action.

 Assess the manpower requirements during the project execution as per the schedule and the progress.

 Provide interpretation of applicable code specifications and requirements. Any deviation, clarification and waivers are to be documented through the Site Query System.

 Co-ordinate interface with Operations, Certifying Authority, Contractor, and subcontractor assuring conformity to project specifications.

 Verify QC welding Inspectors effectiveness.

 Exercise proactive approach in prevention of a problem by interface with production, engineers and management personnel.

 Liaise with other party representatives (Contractor, Subcontractor, and other third parties) for ensuring product conformity and stage release for each activity denoted within the Project Quality Plan/I.T.P.

Sep 1998 Jul 2008

Japan Servo Batam

As QA/QC Supervisor

Project:

Stepping Motor.

AC Servo Motor.

Armature.

Main Responsibilities:

 Responsible for inspection and testing and overall product quality.

 Develop, implement and monitoring quality performance indicator.

 Maintain and improve the quality management system.

 Supervise & train QA Technicians, Inspectors.

 Coordinate and drive customer complain resolution, provide complain communication to customer.

 Provide regular quality report to customer.

 Provide support on customer on side visit and audit.

 Monitoring supplier performance with participate supplier review.

 Interaction with supplier to understand our quality requirement.

 Responsible for supplier audit and corrective action has provided.

Sept 1995 Aug 1998

CV. Agung

As Field Operational

Main Responsibilities:

 Responsible for Production process and safety.

 Review all drawing and specifications for supporting the Building activity (Specification, Paint Matrix, Paint Material availability, Task Risk Assessment, Man-hours, etc.) and relay the information to Production and ensuring that have been implemented as per project requirements.

 Prepare and review schedule, field instruction and execution plan.

 Review and report the progress, man-hours and productivity.

 Revised The Field Construction Budget System weekly.

 Prepare Material Take Off and purchase list for material relate with project requirement.

 Work with contractor personnel, Customer, Engineering, etc. to resolve any construction problems.

 Ensure the supplier is supplied with the correct materials and drawing to meet the schedule requirements.

 Conducting construction failure/root cause analysis and recommended corrective or preventive action.

 Ensure the supplier is supplied with the correct materials and drawing to meet the schedule requirements.

 Conducting construction failure/root cause analysis and recommended corrective or preventive action

 Prepare work pack and shop floor for construction activity.

 Progress Monitoring and Reporting, Logging and Documentation.

 Monitor quality for any construction result w/ QC and conduct inspection with QC and Client representative.

 Prepare and clear outstanding work and punch list.

 Assist in performance of any testing as required with QC personnel and client.

 Ensure materials are delivered to the proper location and timely manner.

 Sourcing and approving vendor documents, 3rd parties, invoice, material requisitions, suppliers and expenditure.



Contact this candidate