CURRICULUM VITAE
Madan K. Bhelsaikar
RESIDENTIAL ADDRESS
Mahalaxmi Plaza, Flat No 404,
Near Digha Bus Stop,
DIGHA
Thane Belapur Road
Navi Mumbai (Maharastra)
CONTACT DETAILS
Mobile no. : 084********/ 094********
E-mail Address: aczjl4@r.postjobfree.com
DATE OF BIRTH
01st June1959
PROFESSIONAL QUALIFICATION
Passed Diploma in chemical in plant operation
Passed First Year B Sc Mumbai
Passed H S C-Pune Board
ADDITIONAL PROFESSIONAL CERTIFICATES FROM DOW.E.NOCIL
Fire and safety training certificate conducted by NOCIL and Mumbai fire brigade.
Environmental care award certificate from DOW Chemicals Ltd.
WORK EXPERIENCE
27 years (Chemical, Petrochemical,Refinery, Oil and Ggs)
KEY SKILLS
Handle the major chemical projects of continuous and batch process control and operate Distributed control system (DCS).
Having excellent communication and writing skills.
Able to handle venders and Contractors with safe working procedure.
Coordinate with commissioning Engineers and Managers.
Excellent practical knowledge of Chemical processes and documentation.
Excellent management skills which help while dealing with subcontractors Good communication skills that prove useful while handling daily correspondence.
High level proficiency in operating Microsoft Word, Excel.
Profound ability of establishing and maintaining client relationships.
Working with DCS System Tata Honey well TDC 3000 and YOKOGAWA Syst
HPCL (Hindustan Petroleum Corporation Ltd) Visakhaptnam Refinery, Andhra Pradesh.
Working with TECHNIP KT INDIA limited
Duration : 29 june 2014 to till date
Designation : DCS Operator (Yokagawa DCS system)
Commissioning Engineer
Diesel Hydrotreater Plant /Hydrogen Genaration Unit
Following activities done
Unit check out –Vessels, piping, heat Exchangers, pumps
Air fin condensers/Make gas Compressor
Recycle Gas Compressor
Hydrostatic pressure, shop tasted
Preparing the pre-commissioning and commissioning. Heater dry out Reactor dry out
Catalyst Loading as per PMC consultant
Chemical cleaning, Air blowers, ID FAN,FD FAN start up
Oil mist system system, DCS ACTIVITY
Shut down of Reactor section, Make gas compressor start up Recyclle Gas Compressor start up
Feed start up Coalescer line up Hot and cold sr diesel from
Battery limit, Operating stripper, product fractionator kerosene stripper, product fractionator Reboiler, from dcs
Recycle gas System, Operate wash water system for quenching the Air Fin Condenser.
Process in air fin condencers procedures/method
statements for DCS and other Units.
control/instrument systems with theDiesel Hydrotreater Plant
(DHTU) unit
Implementation of the pre-commissioning and commissioning
Procedures/method statement for DCS and along with vendor
supervisor
operation shift in control room for control board operation.
Experience in Catalyst loading fixed bed reactors.
Heater Dry Out. experience in operating DCS system YOKGAWA System
Monitoring, Measurement and Control of process parameters,
Trouble shooting and rectification.
Stoke checking of control Valves
Safety Valves Checking and regular checkup of plant conditions
Responsible for smooth operation of the plant from DCS.. unit
Control loop logic checking
Preparing rotating equipment for start-up, final check out of
HPCL (Hindustan Petroleum Corporation Ltd) Mahul
Mumbai Refinery
Duration : 19th Feb 2013 to June 2014
Designation : DCS field specialist (Honeywell system) Commissioning Engineer
Implementationof the pre-commissioning and commissioning procedures/method statement for DCS and along with vendor supervisor
Experience in Catalyst loading of tubular and fixed bed reactors.
Experience in operating DCS system Honeywell experion.
O N G C (OIL AND NATURAL GAS Commission Mumbai,Maharastra
: 19th Feb 2012 to 2013
Designation: DCS field specialist (Honeywell system) Commissioning Engineer
Implementation of the pre-commissioning and commissioning procedures/method statement for DCS and along with vendor supervisor
Submit the reports to client for approval
Coordinate the field operators
Experience in Catalyst loading of tubular and fixed bed reactors.
Start-up, Shutdown and trouble shooting of the continuous process plant of having capacity 325T/day.
e in operating DCS system Honeywell experion.
Safety and regular checkup of plant conditions
Follow up of normal start up and shut down procedures.
Co-ordinate with all maintenance departments like Mechanical, Electrical and Instrumentation for maintenance job to be carried out...
ONGC (Oil and Natural Gas Corporation) Hazira, Surat
Gujarat (L&T Project).
Duration : 10th July 2011 to Nov 2012
Designation: DCS Operator/Commissioning Supervisor
JOB PROFILE
Working in GSU (Gas sweetening unit)
GDU gas dehydration unit
All flushing drying and box up activity of the systems.
The box up activity with safety and standard procedure.
Execute the plant commissioning as per P&ID.
Supervise all pre-commissioning, commissioning and start-up activities of equipment.
Assist Operational Group with commissioning activities, example, preparing systems for flushing, testing, blowing, and reinstatement of systems.
Preparing rotating equipment for start-up, final check out of systems and
troubleshooting equipment problems.
Supervising a group of mechanical technicians (pipe fitters, mechanical fitters and labours) for commissioning activities requiring removal & reinstalling of components, cleaning of systems, temporary piping and hoses, etc.
Attending commissioning progress meetings when required by PPS Commissioning Manager.
Vinati Organics Co Ltd,Mumbai,Maharastra.
Duration : Working since Jan 2008 – Feb 2011
Designation: Senior Field Officer/Commissioning supervisor.
JOB PROFILE
Responsible for performing chemical operation duties in an H2So4 plant with high productivity.
Responsible for make sure about the good and highest quality of product.
Responsible for testing samples of products.
Responsible for producing merge of different percentages of sodium salt of ATBS in safe and exact manner.
Responsible for supervising contractors and maintenance personnel in flammable and highly corrosive H2SO4 and Caustic area.
Drying of cryogenic lines using dry air or nitrogen.
Co-ordination with Safety Engineers.
Running-in of Compressors
Loading unloading of ISO butylenes containers on loading station.
Reliance Petroleum Ltd (Jamnagar Gujarat)
Duration : Jan’2001 – Dec2002
Designation : Tank farm Commission Supervisor.
Bechtel France Design.
JOB PROFILE
Working with LPG / Propylene Storage tanks commissioning erection of the spherical tanks.
Commissioning of fire and safety, deluge system.
Floating roof tanks of naphtha Chemical.
Working with RRTF,/RTF Reliance tank farm.
Side execution of commissioning heavy pipeline with reliance tank farms.
Work permit procedure Co-ordinate to design of Bechtel France.
Worked as a lead operator in commissioning & start up group
Of tank farm and import/export product pipeline
2-D E NOCIL CO. LTD, Lote Plant, Maharastra.
(DOW CHEMICALS INDIA LIMITED)
Duration : July’1982 – Dec’2000
Designation : Senior Plant Operator
DCS Operator (Tata-Honey well Control Room).
Charge Hand
JOB PROFILE
Utility Operations like Air compressor, chilling plat units and steam generation Plant.
Continuous and batch process plant.
Azeotropic Distillation,Exothermic Reaction.
Chlorination, Filtration & slurry formation plant.
Phase separation of two separate Aqueous and Organic layers.
Esterification, Hydrolisation reaction. Distillation of toluene & O-Xylene
Condenser, Heat Exchanger.
Conducted periodic tests to ensure safety and functionality of all machines in the plant.
Trained new recruits and existing personnel as and when required.
Scheduled maintenance activities and resolved minor glitches affecting the functioning of the machines.
Prepared reports and presented to the plant manager.
Test the sample sand confirm consistency with the quality standards in respect of viscosity, acidity, texture, dryness, properties, chemical composition etc.
Responsible for make sure about the good and highest quality of product.
Responsible for producing merge of different percentages of hydrogen peroxide in safe and exact manner.
.
Worked on fire brigade for about 10 years.
Achieved a certificate in fire fighting at Bombay fire brigade.
Make sure about safe working conditions.
Working to a manufacturing schedule notifying the manufacturing team leader of any issues that may affect the on-time completion of the process.
Contributing to the continuous improvement of processes, procedures and quality across the site.
Adjust controls to regulate variables as per instructions. Performs set up procedures to prepare systems for operation.
Monitor and troubleshoot the process to maintain required operating conditions.
-Standard Alkali Co Ltd.Ghansoli, Navi Mumbai.
Maharastra
Duration : Aug 1978 – July 1981
Designation: Trainee Plant Operator
JOB PROFILE
Utility Operations like Air compressor, chilling plant units and steam generation.
Continues and batch process plant.
Exothermic Reaction.
Sodium Hydroxide fusion (concentration) plant.
Potassium carbonates powder and flex plant.
Supervising all the departments of the Petrochemical plant.
Performing periodic checks in various departments, for ensuring all the boilers and other equipment are working at their optimum level.
Provide training for new operators recruited.
Taking unit samples as instructed and sending them to the quality department for quality analysis.
Assisting the Plant Operator with daily tasks and reporting duties.
Provide assistance in the recruitment process.
Providing monthly feedback on the performance of the operators.
Coordinating with operators hired on a freelance basis, making sure the assigned work has been done properly.
Marital Status : Married
Nationality : Indian
Language : Marathi / Hindi / English
Passport No : K 4561485 issued at Mumbai
Expiry Date : 12/07/2022
I declare that the above information given is true and correct as per best of my knowledge.