Post Job Free

Resume

Sign in

Engineer Maintenance

Location:
New York, NY
Salary:
35.00 Hr.
Posted:
March 27, 2017

Contact this candidate

Resume:

Professional Summary

Skills

Interests

Work History

ANTHONY BODDEN

***** ******* ****. #***, ******* Oaks, CA 91401 (H) (213) 219- 2061 aczh7e@r.postjobfree.com To utilize my experience, skills and knowledge to secure a position as a Stationary Engineer Skilled and organized Stationary Engineer with more than 8 years in building maintenance. Possesses in-depth knowledge of maintenance, troubleshooting and repair procedures in all areas of facility and mechanical systems for both commercial and residential buildings. Successful at blueprint reading for hydraulic and pneumatic systems. Tackles systems issues efficiently by applying a diverse knowledge base of industrial systems. Knowledgeable and motivate Stationary Engineer who excels in building and facility maintenance in a manufacturing environment. Areas of expertise include HVAC, energy management systems, refrigeration, plumbing, welding and hazardous waste management.

Member of International Operating Engineers Union Local 501

General building maintenance

Welding

Blueprint interpretation

Competent with power tools

CPR certified

Steam Boiler Exp.

Commercial and residential maintenance

Certified Air Conditioning Technician

Fire pump systems

Welding

General building maintenance

Plumber Exp.

EPA Certified Universal License

HVAC computer controls knowledge

Strong mechanical and electrical skills

Chilled water systems knowledge

Knowledge of condensation pumps

Document retrieval systems

Knowledgeable and motivated Stationary Engieer who excels in building and facility maintenance in a manufacturing environment. Areas of expertise include HVAC, energy management systems, refrigeration, plumbing, welding and hazardous waste management.

Building Engineer 12/2015 to 03/2016

JOHNSON & JOHNSON CORPORATION – LOS ANGELES, CA

Facility Group Lead: Jeff Teixeira 310-***-**** Maintain equipment and perform PM's on the two 150 psi, natural gas Cleaver Brooks Boilers and deaerator, I run and managed the industrial waste water system, balanced PH And turbidity and maintain the Carrier chiller, cooling towers, AHU's, Turbo-air Compressors and Atlas Copco air dryers, sump pumps, purified water systems and tanks.

I Monitor temperature and humidity in the warehouses and change out the Evoqua DI Water bead's when depleted and preformed loop sanitization to system.

I dealt with Outside contractors and completed monthly safety training courses for example LOTO And fire safety. I receive work orders, emails and ordered parts through the J&J online. Referenced blueprints, repair manuals and parts catalogs for complex repairs. Conducted preventive and corrective maintenance on bearings, pumps, shafts and fans. Followed routine and preventative maintenance checklists. Safely operated standard and aerial lift vehicles. Monitored Building Management Systems (BMS).

Inspected drives, motors and belts.

Operated tools, including hoists, saws and drills. Monitored water treatment systems and conducted plant boiler water testing. Documented all maintenance and repairs.

Stationary Engineer 09/2014 to 10/2015

Whitney Museum of American Art – New York, NY

Referenced blueprints, repair manuals and parts catalogs for complex repairs. Conducted preventive and corrective maintenance on bearings, pumps, shafts and fans. Diagnosed mechanical problems and determined the best ways to correct them. Installed pipe systems and plumbing.

Followed routine and preventative maintenance checklists. Repaired defective equipment parts.

Safely operated standard and aerial lift vehicles. Regularly monitored facilities for toxic gases.

Monitored Building Management Systems (BMS).

Repaired and calibrated equipment using precision measuring instruments. Inspected drives, motors and belts.

Operated tools, including hoists, saws and drills. Monitored water treatment systems and conducted plant boiler water testing. Documented all maintenance and repairs.

Directed operation and maintenance of building mechanical and utility systems. Scheduled contractors for projects and distributed work orders. Chief Engineer 09/2014 to 10/2015

Jeff Robinson 917-***-**** Adjusted Honeywell thermostats if needed, checked ductwork, Troubleshoot problems with Belimo valves and actuators, traced lines, and handled plumbing Issues or other needs. I inspected the cooling towers and made sure they had the proper water in basins. Green building; Maintained equipment such as the chillers, pumps, air compressors, Boilers, generators, speed drives and air handling units (AHU) on the 9 floors of the Museum monitors operation and adjustments if needed to the temp/humidity, Controlled dampers, operated valves and monitored condenser and chilled water flow on Hot or cold and adjusted Honeywell thermostats if needed, checked ductwork, Troubleshoot problems with Belimo valves and actuators, traced lines, and handled plumbing Issues or other needs.

I inspected the cooling towers and made sure they had the proper water in basins. Green building; Maintained equipment such as the chillers, pumps, air compressors, Boilers, generators, speed drives and air handling units (AHU) on the 9 floors of the Museum monitors operation and made adjustments if needed to the temp/humidity, Controlled dampers, operated valves and monitored condenser and chilled water flow on The Schneider BMS system.

We did weekly/monthly PM's like changing filters, greasing Pumps and motors, punching tubes on the chillers, changing belts and cleaning or Replacing spray nozzles on the MeeFogs. I made hourly rounds of the building, logged Pressures/temp on necessary equipment. I took tenant calls for employees that were too Amount of water in the basin, unclogged drains, sweated new piping and painted chiller Rooms and chill/cond water lines.

I would operate a genie boom or lift to reach high Places and change lights. I have experience on DDC automated buildings and on Pneumatic equipment.

.

Raytheon, Stationary Engineer 10/2011 to 07/2013

Los Angeles, CA

Chief Engineer

Maintained equipment such as the chillers, pumps, air compressors, boilers, generators, Speed drives and air handling units

(AHU) on Raytheon's North and South campus Buildings. Monitor operation and made adjustments if needed to the temp/humidity, Controlled dampers, operated valves and monitored condenser and chilled water flow on The Johnson Controls BMS. We did weekly/monthly PM's like changing filters, greasing Pumps and motors, punching tubes on the chillers, changing belts and cleaning or replacing spray nozzles on the MeeFogs. I made hourly rounds of the building and Data Centers, logged pressures/temp on necessary equipment. Education

I took tenant calls for employees That were too hot or cold and adjusted Johnson Control thermostats, worked on Liebert Units in the data centers, retrofitted pneumatic lines and actuators to DDC controls, Checked ductwork troubleshoot problems with Belimo valves and actuators, traced lines, Handled plumbing issues or other needs. I inspected the cooling towers and made sure They had the proper amount of water in the basin, unclogged drains, sweated new piping And painted chiller rooms and chill/cond water lines. I would receive and execute work orders for preventative and corrective maintenance on Equipment through email and Raytheon's Prism online system.

Consult with supervisor to Order necessary materials to complete maintenance to perform necessary work. I would Finalize work orders by completing necessary documentation in the computerized Maintenance management system. Our job was to respond immediately to emergency Situations (fire, equipment failure, etc.) and customer concerns. Comply with departmental policy for the safe storage, usage, and disposal of hazardous Materials. Maintain a clean and safe workplace.

Able to read blueprints and schematics.

Stationary Engineer 10/2008 to 12/2010

Harvard Inc – New York, NY

Chief Engineer

Maintained equipment such as the chillers, pumps, air compressors, boilers, generators, And air handling units(AHU) on the 15 floors of the Harvard building.

Monitor operation And made adjustments if needed to the temp/humidity by controlled dampers and New York City Steam, operated valves and monitored condenser and chilled water flow on the Carrier BMS system. I would start up pumps, chiller and cooling tower every morning And adjust temp and dampers depending on the day and outside conditions.

We did Weekly/monthly PM's like changing filters, greasing pumps and motors, punching tubes On the chillers, changing belts.

I made hourly rounds of the building, logged pressures/ Temp on necessary equipment. I took tenant calls for employees that were too hot or cold And adjusted thermostats, checked ductwork troubleshoot problems with valves and Actuators, traced lines, handled plumbing issues or other needs. I inspected the cooling towers and made sure they had the proper amount of water in the basin, unclogged drains, Sweated new piping and painted chiller rooms and chill/cond water lines the building Was dated and had all Pneumatic actuators and equipment.

I would receive and execute work orders for preventative and corrective maintenance on equipment through my Chief and log everything down in a log book.

Respond immediately to emergency situations (fire, equipment failure, etc.) and customer Concerns. Comply with departmental policy for the safe storage, usage, and disposal of hazardous Materials. Maintain a clean and safe workplace.

Able to read blueprints and schematics.

Maintenance Mechanic 01/2006 to 06/2008

Invision Inc – New York, NY

I did maintenance and repair on light electrical and light plumbing. I worked the data Center on Liebert units and cut the raised floor tiles when needed. I would answer tenant Calls like hanging pictures or putting together a bookcase. I worked at Invision Inc.

while Going to school for my Engineering License.

7 World Trade Center Silverstein Properties, Mechanic, New York, NY. Chief Engineer 01/1999 to 09/2001

Maintained equipment such as the chillers, pumps, air compressors, boilers, generators, And air handling units (AHU) on the 47 floors of the 7 World Trade Center building.

I would work hand and hand with a Licensed Engineer. We did weekly/monthly PM's like Changing filters, greasing pumps and motors, punching tubes on the chillers, changing. EPA 608 Universal Cert.: HVAC 3/1/2007

Additional Information

Certifications

Branford Hall Career Institute - Bohemia, NY

License in HVAC and Refrigeration

Coursework in Programmable Logic Controller

Coursework in Boilers & Steam

License: Commercial Refrigeration 08/2008

Turner School NY - New York

Local 501 Apprenticeships and Training Program, Los Angeles, CA - EPA 608 Universal Cert. #P1894B3A8D731E270 Turner School, New York, NY - Commercial Refrigeration,: Local 94 Apprenticeships and Training Program, New York, NY - Operating: Stationary Engineer Apprnticeship LOCAL 94 International Operating Engineers - NY

Engineer License #83835546 - 8/2008 Southern California Gas Company, Downey, CA - Steam Operator Training 3 Day Seminar, 11/5-7-2013aximo system.

EPA 608 Universal Cert.#P18943B3A8D731E270, Stationary Engineer License # 83835546 LA County Fire Safety Cert. CPR

Cert.#OXNVUR



Contact this candidate