Post Job Free

Resume

Sign in

Engineer Project

Location:
Bhavnagar, GJ, India
Salary:
70000 per month
Posted:
March 20, 2017

Contact this candidate

Resume:

*.Proposed Position : Survey Engineer

*.Name of Personnel : Kalpesh Ravajibhai Patel

3.Date of Birth : 30th September 1983

4.Marital Status : Married

5.Nationality : Indian

6.Education Qualification : ITI Diploma in Surveying 2002 in,Gandhinagar, Gujarat

Computer Aided Civil & Surveyor

Membership of Professional Associations:

NILL

Training Undertaking:

MS-Office, Auto cad & Calquan

Special Achivment:

Operating knowledge of advance Electronic Survey Instruments Such as DGPS, GPS, All type Of Total Station, Theodolite, Auto Level, etc.

7.

Employment Record

FROM Sept. 2008 To Till date

Employer : Egis Bceom International S. A.

Position held : Sr. Surveyor

FROM July. 2006 To Aug. 2008

Employer : Ranjit-Tarmat(JV)

Position held : Sr. Surveyor

FROM Mar. 2005 To July. 2006

Employer : Universal Engineering & Consultancy Services (Jaipur)

Position held : Sr. Surveyor

FROM Nov. 2002 To Mar. 2005

Employer : Ranjit-Gaytri (JV)

Position held : Surveyor

Feb. 2012 to till date

Egis Bceom International S. A.

Survey Engineer

Six Laning of Existing Three Lanes For Bagodara-Wataman-Tarapur-Vasad Road, SH-8, on BOT (VGF) Basis, Project Length: 101.900 kms, 0+000 to 101+900.

Project Detail: Construction of Additional Three Lane for Bagodara-Wataman-Tarapur-Vasad Road to make it Six Lane Divided Carriageway Facility under Viability Gap Funding Scheme of Government of India on Build, Operate and Transfer (BOT) basis.

Duration : Feb. 2012 to till date

Client : Gujarat State Road Development

Concessionaire : GVK Bagodara Vasad Express Way Private Limited

Independent Engineer : Egis Bceom International S. A.

Location : Anand (gujarat, India)

Project Cost: INR 1109.883 Crore

As Survey Engineer, was responsible for checking of Alignment as per the Drawings, routine TBM checking, topographical survey for verifying ROW in the JMS sheet with GPS, checking and verification of various encumbrances and land issues, checking the levels for various layers (OGL, Embankment, Sub-grade, GSB, WMM, BM, DBM & BC), Median and Kerb alignment checking, Drain layout, Junction layout, Bus bay layout, Structure layout and alignment checking and Toll plaza layout checking.

Sept. 2009 to Feb 2012 date

Egis Bceom International S. A.

Survey Engineer

Four Laning of Ahmedabad-Viramgam-Maliya Road on BOT (VGF) Basis, Project Length: 183.565 kms, 11+500 to 195+065.

Project Detail: Construction of Additional Two Lane for Ahmedabad – Viramgam – Maliya Road to make it Four Lane Divided Carriageway Facility under Viability Gap Funding Scheme of Government of India on Build, Operate and Transfer (BOT) basis.

Duration : Sept. 2009 to Feb. 2012 date

Client : Gujarat State Road Development

Concessionaire : L&T Ahmedabad-Maliya-TollwayLimited.

Independent Engineer : Egis Bceom International S. A.

Location : Ahmedabad, India

Project Cost: INR 1015.36 Crore

As Survey Engineer, was responsible for checking of Alignment as per the Drawings, routine TBM checking, topographical survey for verifying ROW in the JMS sheet with GPS, checking and verification of various encumbrances and land issues, checking the levels for various layers (OGL, Embankment, Sub-grade, GSB, WMM, BM, DBM & BC), Median and Kerb alignment checking, Drain layout, Junction layout, Bus bay layout, Structure layout and alignment checking and Toll plaza layout checking.

Sept. 2008 to Sept. 2009

Egis Bceom International S. A.

Survey Engineer

Punjab State Road Sector Project Consultancy Services for Quality Assurance and Technical Support for Package II (Phase I) Part B, Project Length: 361.70 kms, 9+000 to 46+970,0+00 to 33+600, 1+000 to 29+550 Lane, Funded by: World bank Condition of Contract:

Project Detail: (i) PSRSP/WB/RH/2/NCB KM-9+000 TO 46+970 Project Cost 44 Crore’s

(ii) PSRSP/WB/RH/3/NCB KM-0+000 TO 33+600 Project Cost 47 Crore’s

(iii) PSRSP/WB/RH/6/NCB KM-1+000 TO 29+550 Project Cost 25 Crore’s

Duration : Sept. 2008 to Sep. 2009 date

Client : PWD B&R, Punjab, Governor of Punjab

Location : Punjab, India

As Survey Engineer, was responsible for PWD

July. 2006 to Aug. 2008

Ranjit-Tarmat(JV)

Sr. Surveyor

National Highway Project (RJ-III, E.W.Corridor- II) NH-76. Gogunda to Udaipur (KM 32), Chainage (73.000-104.724), Project Length: 32 kms, 73+000 to 104+724 Lane, Funded by: NHAI Condition of Contract:

Project Detail: NHAI Rj-3 km-73+000 TO 104+724

Duration : Nov. 2005 to Aug. 2008

Client : National Highway Authority of India.

Location : Rajasthan, India

Project Cost: INR 208 Crore

As Survey Engineer, was responsible for fixing bridge alignment approaches, pier and abutments, leveling work, detailed survey work by using Total Station, Traversing, Fixing of Alignment, Taking levels for fixing T.B.M. Longitudinal section and Cross sections, Earthwork Calculation. Fixing the R.O.W. for roads, traffic survey. Also responsible for setting out curves & layout of structures, management of field staff, responsible for execution of the various survey activities regarding Earthwork, Subgrade, GSB, WMM, DBM, BC work and preparation of tolerance sheets.

March. 2005 to July. 2006

Universal Engineering & Consultancy Services (Jaipur)

Sr. Surveyor

Fourlaning of Pune-Ahmednagar Road, Section Shirur-Ahmednagar (SH-60 from Km.64+000 to Km.120+400) in the state of Maharastra, Contact Package No. BOT-01, Project Length: 56.400 kms, 4 Lane, Funded by: BOT Condition of Contract:

Duration : Mar. 2005 to Nov. 2005

Client : Chetak Enterprises / Govt. of Maharastra PWD

Location : Maharastra, India

Estimated Escalated Project Cost: Rs. 126Crores

As Head Surveyor, was responsible for Looking after the Survey work with “Advance Total Station” Topography Survey, Plot Demarcation, Survey involved in inventory for topographical Survey and Demarcation, fixing of proposed CL on ground, Making of Longitudinal section and Cross sections, Bench Mark fixing and data collection of site, Establishing RLs.

Nov. 2002 to Mar. 2005

Ranjit-Gaytri (JV)

Surveyor

Construction of four laning Udaipur-Gandhinagar road project of Golden Quadrilateral on NH-8, Contact Package UG-II (Km.340+000 to Km.396+00) in the state of Rajasthan, Project Length: 56 kms, 4 Lane, Funded by: NHAI, Condition of Contract:

Duration : Nov. 2002 to Mar. 2005

Client : National Highway Authority of India

Location : Rajasthan, India

Estimated Escalated Project Cost: Rs. 120Crores

As Survey Engineer, was responsible for fixing bridge alignment approaches, pier and abutments, leveling work. involved in inventory for roads and CD work, Alignment traverse, fixing of proposed CL on ground, Making of Longitudinal section and Cross sections, Calculation, Bench Mark fixing and data collection of site, Establishing RLs.

8.

Details of the current assignment and the time duration for which services are required for the current assignment.

Mr. Kalpesh Ravajibhai Patel (Mobile No. 099********,, 098********) is currently working on Bagodara-Wataman-Tarapur-Vasad Road Project He will be available from Feb, 2012.

CERTIFICATION:

1.I am willing to work on the Project and I will be available for entire duration of the Project assignment as required.

2.I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications and my experience.

Date:

(Signature of Staff member or authorized representative of the staff) Day/Month/Year

Full name of authorized representative:



Contact this candidate