Power Plant Mechanical Engineer

Location:
Phoenix, AZ, 85032
Salary:
55000 $
Posted:
February 04, 2017

Contact this candidate

Resume:

Reza Asadipour

***** *. ******** ****** **** Cell phone: 480-***-****

Phoenix, AZ 85032 E-mail: acynxx@r.postjobfree.com

Career Summary:

Seasoned professional seeking a career position in one of the following areas: Engineering, Project Management, Construction Management, Supervisor, Educator, and Tutor. I am open to other possibilities as well. Mechanical Engineer expertise with 16+ years of experience including leadership positions and project management. Expertise includes a background of construction in industrial projects, including oil and gas production units, hydroelectric power plants, and mineral industries (i.e., steel and cement factories).

Skilled with managing multi-disciplinary teams to include civil, mechanical, electrical engineering and commissioning. Regularly meet deadlines and deliver desired results within established time frames. Projects vary in sizes up to and including the construction of multi-billion dollar industrial project. Work is accomplished in accordance with accepted standards. Routinely meet or exceeds all deadlines and project expectations.

Management positions included responsibility for all technical issues. This includes allocating all human and financial resources to different executive teams including procurement, mechanical, civil, electric and control disciplines to work together to fulfill the requirements. Responsible to accomplish the project on time, in accordance with all guidelines while reducing the execution expenses where possible.

OTHER TRAINING AND SKILLS:

Familiar with technical specifications/codes, and standards such as ASME, ANSI, API, ASTM, NACE Skillful in reading mechanical, electrical, civil, piping, HVAC, P&ID drawings Full knowledge of computer operating systems and Office ( Windows, office Familiar with engineering software such as AutoCAD, Catia, Solid Works, PDMS Familiar with HVAC calculations including heating loads, cooling loads (sensible and latent), air duct sizing, system and equipment selection

I am a new-comer to the USA and have been legally residing in Phoenix, AZ since June, 2015. I have a permanent residence card and do not require sponsorship. I am currently working as a tutor for physics, math and calculus at the Phoenix Community College and also privately. Career Experience:

Phoenix Community College, AZ, USA Jan 2016 to the present Tutor- specializing in physics, math, and calculus

Tutoring students in physics: including mechanics, thermodynamics, electricity and magnetism, and optics from high school level to university level.

Math tutoring for all levels of Algebra I to Calculus I, II and III. Kish Petroleum Engineering Services Co. Mehran, Iran Jan 2012 - Jun 2012 Site Manager for main contractor

Project Objective: Development of the Azar oil field

$5.1 billion project and the final purpose was to drill 19 oil wells, extract oil API32 from the wells and transfer to a 71500 bpd central processing unit (CPF) for degassing, dewatering and desalting the oil.

Project productions were 80,000,000 qfd of gas to the NGL 3100 in Cheshmeh Khosh, Iran, through a 16"/155km gas export pipe line and the produced oil was exported to Dehloran oil facilities through a 16", 220 km oil export line.

Project Deliverables included construction of Central Processing Unit (CPF), flow lines to CPF, oil and gas export pipelines, and 132/33/11 KV substations and related power lines. Namvaran Consulting Engineers (NCE), Iran Apr 2011-Oct 2011 Construction Manager

Project Objective: Development of the Yadavaran oil field. A $4 billion and 43-month project with final purpose- to drill oil wells and successfully transfer oil to the central processing unit(CPU) .

Project Deliverables include: Drilling of 260 oil wells, and construction of the following: Central Processing Unit (CPF) with a nominal capacity of 300,000 bpd, flow lines to CPF 160 km, oil and gas export pipelines 270 km, and 132/33/11 KV substations and related power lines. International Petro Asemari Company (IPAC), Iran Sep 2008 - Mar 2011 Site Manager/Consultant

Project Description: Oil field extension valued at $260 million and 36 months in duration.

Project Objective: Drill 15 oil wells, transfer the extracted oil to a 25000 bpd production unit and desalting plant (PU & DP). The crude oil was exported to Naftsefid production unit through a 6" and 35 km export pipe line and the gathered gas was exported to Mahshar petrochemical plant.

Project Deliverables included construction of the following: A Production Unit and Desalting Plant

(PU & DP) and relevant accessories, an oil export pipeline ( length of 35 km), A sweet gas pipeline

(length of 12 km), A 132/33 KV substation and related dual circuit power line (length of 5 km). Moshanir Consultant Engineers, Iran Feb 2008 - Sep 2008 Project Manager/Engineer

Project description: Construction of the Msajed-Soleyman hydro-electric power plant Project valued at $1 billion.

In this project, I was head of the mechanical department of consultants for the construction, erection, and commissioning of the hydro-electric power plant equipment.

Project Objective: Construction and commissioning of four turbine units and generators (each unit 250MW, total 1000MW) at Masjed-Soleyman hydro-electric power plant (Phase II).

Project Deliverables included construction of the following four turbine units and generators, the erection of power intake valves (radial gates), turbine's in-take valves (butterfly valves), power outlet valves (flap gates), spillway gates (radial gates - and in fact the world's largest ones in height), bottom outlet valves, waterways (manifolds, spiral case, draft tubes), Francis turbines, generators, and all accessories including bearing lubricant oil, cooling water and service airs piping systems, HVAC of power plant and so on.

Zavir Consulting Engineers, Ahvaz, Iran Aug 2005 - Feb 2008 Project Manger/Engineer

Included supervisory management for the mechanical department of consultants. Responsible for activities related to construction, design modifications and commissioning of the Handling Material Extension Project.

Project description: Handling Material Extension at Khouzestan Steel Company (KSC) valued at

$200 million, 2 years in duration.

Project Objective: Increase the capacity of steel making production of the factory to 1,200,000,000 tons from 900,000 tons.

Project Deliverables included construction of the following: A new material handling system, including tanks, chutes, conveyors of different types, weigh feeders, classifiers and modification of existing system in very many points

Steam Engineering Company, Iran Jun 2004 - Jun 2005 Construction Manager

Project Description: Extension project of the Masjed-Soleyman hydro-electric power plant (phase II) valued at $1.2 million and 2 years in duration.

Project Deliverables included the construction of the following: Construction and commissioning for four Francis turbines (each unit 250 MW, total 1000MW), and related inlet valves (butterfly valves of diameter of 6m), outlet vales (flap gates), waterway system (spiral cases and draft tubes and accessory systems (cooling water, lubricant oil, service air piping systems) and governing system and handing it over to client (Farab).

Farab Engineering Company, Masjed-Soleyman, Iran Feb 2004 - Jun 2004 Senior Staff Mechanical Engineer

Project Description: Construction of hydro-electric dam and power plant (phase I), valued at $1 billion, 4 years in duration.

Project Objective: Punch removal of powerhouse equipment, during guarantee period, at the Masjed-Soleyman hydro-electric power plant (Phase I). Lead the team responsible for the removal of the all punches recorded during construction and commissions of the powerhouse equipment, including turbine's intake valves (butterfly valves), power outlet valves (flap gates), waterways equipments

(manifolds, spiral case, draft tubes), Francis turbines, generators, and all accessories including bearing lubricant oil, cooling water and service airs piping systems, and HVAC of the power plant. Jahan Pars Construction & Engineering Company, Iran Oct 2002 - Feb 2004 Mechanical Construction Manager

Project Description: Amak project - construct seven gas reinforcement stations and a gas treatment plant (GTP) in different oil fields and locations all around the city of Ahvaz in Iran.

Project Deliverables included the building and commissions of rotary and fixed equipments including 88 gas compressors from 4000 up to 20000 rpm (made by Termodyne France), pumps, tanks, vessels, heat exchangers, towers, drums, flares, gas coolers, in seven different gas compression stations, and a project of a Gas Treatment Plant (G.T.P.).

Moshanir Engineering Consultants Company, Iran Apr 1998 - Sep 2002 Chief Mechanical Engineer

Project Description: Construction of Masjed-Soleyman hydro-electric dam and power plant (phase I) valued at $1 billion.

Nasb-Niro Engineering Company, Iran Oct 1996 - Apr 1998 Construction Manager

Project Description: Construction of four units of Francis turbines and accessorie. It was valued at $1 million, and 2 years in duration.

Technikan Engineering Company, Iran 1995 – 1996

Construction Manager/Engineer

Project Description: Construction of the Karoon cement factory valued at a $50 million. Abyek Cement Factory, Abyek, Ghazvin, Iran 1994-1995 Mechanical Engineer

Provided expert planning for maintenance of preheaters, rotary kilns, and satellite coolers in accordance with maintenance master plan.

EDUCATION

B.S. in Mechanical Engineering, (graduated in 1991) Tehran Polytechnic University, Tehran, Iran



Contact this candidate