Post Job Free
Sign in

Project Manager Power Plant

Location:
Berkley, MA, 02779
Posted:
January 24, 2017

Contact this candidate

Resume:

John Melvin

SUMMARY Extensive hands on experience in the commercial HVAC, piping

and industrial power industry. My knowledge base consists

of all piping materials, schedules, techniques, hot taps

and live taps, tying new piping into existing operational

pipelines, joint filler requirements as well as vessel wall

build up to certain tolerances, burner and associated

replacements, complete package boiler re-tube, HRSG tube

sheet replacements, turbine piping and repairs, working and

coordinating with subcontractor's, heavy rigging, steel

construction, stand by repair ability for clients such as

tube leaks, joint failures.

EXPERIENCE Sagamore Plumbing and Heating, Hingham Ma

2/2013 - 8/2014

Project Manager

Fraser Engineering

11/2012 - 1/2013

Project Manager/Estimator

Atlantic Mechanical Contractors 7/2012

- 11/2012

Executive Project Manager

Arden Engineering Constructors

2/2012 - 6/2012

Project Manager/Estimator

JBM Construction

2010 - 2012

Owner

Construction Product & Services

2008 - 2010

Project Manager/Site Supervisor/Estimator

Overall project management from estimating and bid,

contract negotiation, project supervision, quality

assurance/control, safety and other related activities.

Projects include chemical system pumping, tubing, splash

control, installation of new chemical panel in control

room, chemical boiler piping primarily at Com Electric's

Canal Station, Sandwich, MA and Kendall Station, Cambridge,

MA, as well as repairing reboiled ash lines, silo valve

replacements, reboiler bundle pull and replacement and all

associated piping at the Brayton Point Station, Somerset,

MA.

Keystone Construction & Maintenance Services

2007 - 2008

Project Manager/Site Supervisor/Estimator

Responsibilities included overseeing all boilermaker and

pipefitter work at Brayton Point Station in Somerset, MA.

Beacon Piping Company

1998 - 2007

Project Manager/Site Supervisor/Estimator

Responsible for project specific oversight, including working closely

with the planning engineer, estimators and designated

client representatives during preconstruction. Further

responsibilities include the management and coordination of

various project activities and components, including

contract administration, cost control, scheduling, material

control and procurement as well as staffing. Total

responsibility for the activities of estimating, design,

sales, troubleshooting, service and installation of HVAC

systems/components and in the drafting and design of

sophisticated high temperature piping systems, hanger

design and application, planning, scheduling and the

purchase and expediting of materials. Was project manager

for many projects at Gillette Power house including

installation of reverse osmosis piping system, complete

winbox, instrumentation and breeching expansion joint

replacements purchase and replace four 16" chrome content

high pressure down comer valves and overseeing all aspects

of installation of boiler #3 at the powerhouse. This

involved new intake structure at seawater level and running

fiberglass wrap jointed piping below parking lot for

cooling purposes.

Selected by company owner to manage Beacon Piping's largest

project to date, Distrigas' (HPEP) High Pressure Expansion

Project which converts liquid to gas and employed over one

hundred pipefitters from across the country for a period of

roughly two years.

Modern Continental

1997 - 1998

Field Engineer/Supervisor

Responsibilities included estimating, design, service and

installation of highway drainage piping and water balancing

system for float out and setting of highway modules at the

"casting basin" portion of the Central Artery project. This

required purchasing of all temporary and permanent sump

pumps to allow float out and setting of concrete highway

modules running and set underwater at Fort Point Channel

tying in cut and cover highway running below channel

surface, boring under artificially frozen ground at MBTA

tracks and tying into cut and cover sections converting

tunnel to above ground status. Responsibilities also

included piping and control of buoyancy tanks and pumping

as well as claims and changes to the original contract

scope of work.

O'Connor Constructors, Inc.

1990 - 1997

Project Manager/Estimator

Responsibilities included estimating, design, and

management of various Low Nox conversion projects for

Boston Edison, Boston, MA and Orange & Rockland Utilities,

NY. Assisted with Edison tall stack installation and

boiler skin steel purchase, interpretation, and

installation. Managed piping coordination of systems in

racks at the Milford Cogen Power Plant and installation of

gas turbines at MWRA, Deer Island facility.

PROJECTS: The following is a representative list of client/locations

included in my experience:

. Massachusetts Institute of Technology, Cambridge, MA

. Distrigas of Massachusetts, Everett, MA (HPEP)

. Boston Medical Center, Boston, MA

. Proctor & Gamble, Gillette Facility, South Boston, MA

. Fluor Daniel Corporation, Bellingham, MA

. Northeast Utilities, Public Service of NH, Various NH

locations

. Ocean State Power Corporation, RI

. Bechtel Corporations/Semass Facility, Rochester, MA

. J.A. Jones, Milford Cogen Facility, Milford, MA

. Mass Water Resources, Deer Island Facility, Boston, MA

EDUCATION: Eastern Nazarene College, Bachelor of Science, Business

Administration 1995

Blue Hill Technical Institute, AD Mechanical Design and

Applied Theories 1985



Contact this candidate