Stanley J. Wozniak
*** ***** **. ******, ** ***** 330-***-**** acy543@r.postjobfree.com
QUALIFICATIONS
Team player that works well with all levels of operations.
Excellent interpersonal skills with demonstrated ability to successfully motivate employees.
Implementing dozens of projects up to $1,200,000 that increased quality and eliminated scrap.
3 Years production management and purchasing.
5 Years staffing and supervision.
15 Years project management and customer liaison.
16 Years Lean Manufacturing, Kaizen, and Demand Flow Technology implementation.
8 Years plastic extrusion. Tubing and profile.
15 Years injection molding experience. 25 - 800 Ton. Thermoplastic, thermoset and insert.
12 Years assembly of products.
4 years of composite bonding.
6 years of Tier 1 automotive.
Laser etching and marking.
Process and routing documentation.
LuK USA, Wooster, OH 2012 - 2016
Manufacturing Engineer –
Specify and order tooling and equipment for Composite Bonding. Developed processes and methods that increased efficiency by 30%.
Tooling design changed that increased capability and reduced scrap by 20%.
Carlisle [Wellman Products], Medina, OH 2006 - 2012
Process Engineer – Friction brake and clutches
Acquired and implemented new operating system for CNC riveting machinery reducing labor costs by 40%.
Developed and implemented powder coat system for disc brake pads reducing scrap by 20%.
NEWELL RUBBERMAID-GRACO DIVISION, Macedonia, OH 2004 - 2006
Manufacturing Engineer
Developed qualification of tooling and structural analysis testing for product performance.
Increased efficiency of assembly operations in excess of 25%.
Developed and implemented procedures to improve product quality.
COSMO CORPORATION, Solon, OH 2001 - 2003
Manufacturing Engineer
Researched, analyzed, and developed components to eliminate tie-bar failures on forty injection molding machines, saving $105,000.
Increased uptime for thermoset injection molding by 300%.
Procured capital equipment for molding and secondary operations, resulting in producing higher quality products while reducing energy consumption of by 17%.
DRECO INC., North Ridgeville, OH 1999 –2000
Project Manager
Designed value-added product features that eliminated product failures and reduced assembly cost by $30,000 annually.
Developed methods, processes and tooling for continuous improvement, reducing labor costs by at least 20% on several projects.
COOPER-STANDARD, Cleveland, OH 1997 -1999
Process Engineer
Developed secondary extrusion process that reduced annual direct labor costs by $400,000.
MORSE CONTROLS, Hudson, OH 1993 –1997
Production Manager
Managed and developed a Lean Manufacturing department with a staff of 18 direct reports, while maintaining 100% on time delivery to customers.
Designed and implemented cellular and Kan-Ban systems to streamline production, reducing assembly costs by $60,000 annually.
EDUCATION
CASE WESTERN RESERVE UNIVERSITY, Cleveland, OH B.S. Mechanical Engineering