Post Job Free

Resume

Sign in

Manager Engineer

Location:
Schertz, TX, 78154
Posted:
December 12, 2016

Contact this candidate

Resume:

Curriculum Vitae of

ALAPAG, DIVINO BRIONES

*** **** **** ****,

SELMA CITY, TEXAS, 78154, USA

Mobile #: 210-***-****

Email: acxu76@r.postjobfree.com

POSITION: Chief Engineer

ELIGIBITY: F11- Authorized to work U.S.A. (Permanent resident holder)

Company : ACCU AIRE - Mechanical, LLC

Position : Project Manager – Mechanical Services

Duration : November 9, 2016 to December 12, 2016

Location : P.O. Box 200266, # 1441 S WW White Rd., San Antonio, Texas, 78220

Contact Person : Darren Harris / General Manager / Tel: 210-***-****

Duties & Responsibilities:

Prepared the submittal report materials, schedule equipment’s, for project site;

Monitor all manpower schedule works weekly ahead and monthly and check daily work progress before and after with their materials request;

Check and supervise the Quality work of repairs service and installation of HVAC and plumbing in site from time to time and sure all construction plans implemented, attend construction meeting with architectural, electrical, plumbing and civil;

Review the inspection prepared, construction before final approval of works and projects inspected upon work completion, make sure all items / works inspected are operationally base on their respective function;

Monitor and Coordination for quality control, site engineer, general contractor, superintended;

Company: AL ARRAB CONTRACTING COMPANY (A.C.C.)

Position: Lead Mechanical QA QC Engineer (MEP IT works)

Project: TAV Construction & ACC Construction Madinah International Airport Joint

Venture Project (MAJV), EPC Project

SITE: Terminal, Prince Mohammad Bin Abdulaziz International Airport Project at Al-

Munawarah, Madinah, Kingdom of Saudi Arabia (KSA)

Duration: January 14, 2013 to November 6, 2016

Site Project (Madinah Airport)

Prince Mohammed International Airport (PMIA), Amount: $ 894,982,946.00 Saudi Airlines Catering Building (SACB), Amount: $ 25,663,997.00

Madinah Airport Hotel Project (MAHP), Amount: $ 30,557,333.00

JOIN VENTURE with TAV COMPANY (Turkey)

Head Office address: P.O. # 91313, Riyadh - 11633, K.S.A.

Tel. +966-****-**** / Fax: 009**-****-****, acxu76@r.postjobfree.com

Contact: Mr. Haci Ibrahim Unsal – QA QC Manager / Tel # 66395715 – Bahrain

Duties & Responsibilities:

Responsible for all sub-contractor inspections / reviews, inspection of approval deliveries materials in-site and approval mechanical installation works (HVAC, Elevator, piping line, Escalators, Walkelator, Solar system, Generators, Plumbing, Sewage plant, Cooling Tower, Airport runway facilities both mechanical & electrical work, Cabling works, Power Station,) of all buildings (Madinah Hotel Building Project; Saudi Airline Catering Building; Passenger Terminal Building, Substation building, Water treatment plant, Cooling Tower plant, Power Plant Building, Hajj Building, Masjid Building, Bachelor House, Cantonment, Building, Ministry of Hajj Building, Power Sub-station, etc.) and external mechanical works in whole Madinah International Airport site work project;

Mechanical works monitor and inspection which includes, Drainage system works, plumbing works, HVAC system, escalator, baggage handling conveyor system, elevator, Firefighting system works, fuel line, pipe line, cooling plant station, and sewage treatment plant.

Monitor all sub-constructor / construction in implementation of approved drawing and method of statement in every specific work and material use;

Check the Quality Control of the project in relation to the inspection of mechanical work in all building as per approved materials & shop;

Review the inspection prepare by Sub-contractor, QC construction before final approval of works and projects inspected upon work completion, make sure all items / works inspected are operationally base on their respective function;

Monitor and Coordination for quality control, site engineer foreman, sub-contractor and execution of the project work;

Mechanical works monitor and inspection which includes, Drainage system works, plumbing works, HVAC system, conveyor, escalator, baggage handling conveyor system, elevator, Firefighting system works, fuel line, pipe line, cooling plant station, and sewage treatment plant.

Company: CONTINENTAL COOLING CO. (W.L.L.)

Position: PROJECT ( HVAC ) MANAGER

Duration: June 13, 2010 to August 18, 2012

1.New Project site: Oil and Gas, Halul Island, Qatar

New Project site: Al Shouik Mosque, HVAC (MEP) Project

MEP Project: Present Position: Mechanical Engineer/PROJECT (HVAC) MANAGER

2.Past: Project: New Doha International Airport, Doha, Qatar

HVAC, CP-19 Project June 28, 2011 to 4 April, 2012

3.Past Project Site ( Hospital): Hamad Medical Center, Doha, Qatar

HVAC Project December 30, 2011 to June 27, 2011

4.Past Project: New Doha International Airport,

HVAC Project June 13, 2010 to December 29, 2011

Contact: Mr. VJ Kumar / Director

Duties & Responsibilities:

Electro-Mechanical Contractor for HVAC System.

Doha, Qatar

Head Office address: C.R. 30826, P.O. Box 8371, Doha,Qatar

Tel.: +974-********/312, Fax: +974-********, acxu76@r.postjobfree.com / / acxu76@r.postjobfree.com

Responsible for directing operation of site work project.

Assist the consultant in implementation of approved drawing:

Check the Quality Control of the project in relation to the approved materials & shop.

Prepare inspection request to quality control and projects inspected upon work completion, make sure all items / works inspected are operationally base on their respective function.

Coordination for quality control, site engineer foreman and execution of the project work.

Prepare as built drawing base on the final inspection, testing and commissioning and O &M preparation.

Responsible of implementing the works as described in the tender documents and making list for materials jobs and equipments.

Check the work of all his staff that they provided the necessary work accomplishment needed.

Monitor and checked the performance works on site and verifying the conformity with the standards.

Mechanical works which includes HVAC system, chilled - water Package units exhaust and centralized air-conditioning system.

Prepare submittal materials for approval, method of statement and prepare drawing design.

Skills/Qualifications: Developing Budgets, Supervision, Staffing, Project management, management Proficiency, Process Improvement, Tracking Budget Expenses, Self-Development, Planning

Company: AL LATIFIA CONTRACTING AND TRADING

Position: HVAC Engineer

Electro-Mechanical Contractor for HVAC System.

Dharan, Damman, and Riyadh, Saudi Arabia

Head office address:

P.O. Box 57588 Riyadh 11584

Tel. 4532444 – Fax 4557417

Contact: Mr. Mohammad – Construction Site Mechanical Engineer

Duration: Sept. 8, 2009 to March 5, 2010

Duties & Responsibilities:

Capacity handle 750 ton up to 4500 ton centrifugal chilled water

Quality Control of the project in relation to the approved materials & shop.

Prepare inspection request to quality control and projects inspected upon work completion, make sure all items / works inspected are operationally base on their respective function.

Coordination for quality control, site engineer foreman and execution of the project work.

Prepare as built drawing base on the final inspection, testing and commissioning and O &M preparation.

Responsible of implementing the works as described in the tender documents and making list for materials jobs and equipments.

Supervising the works of the sub contractors and verifying the conformity with the standards.

Mechanical works which includes HVAC system, Package units exhaust and centralized air-conditioning system.

Completed plumbing system and fire fighting system.

Devises sampling procedures and designs and develops forms and instructions for recording, evaluating, and reporting quality and reliability data.

Establishes program to evaluate precision and accuracy of production equipment and testing, measurement, and analytical equipment and facilities.

Compiles and writes training material and conducts training sessions on quality control activities.

Develops and implements methods and procedures for disposition of discrepant material and devises methods to assess cost and responsibility.

Directs workers engaged in measuring and testing product and tabulating data concerning materials, product, or process quality and reliability.

Plans and directs activities concerned with development, application, and maintenance of quality standards for industrial processes, materials, and products: Develops and initiates standards and methods for inspection, testing, and evaluation, utilizing knowledge in engineering fields such as mechanical.

Company: SKU Air - conditioning and Industrial Service, Inc.

& Totaline Air- conditioning parts Supply

(Accredited Installer for Carrier, Koppel, Hitachi, Kolin, Mit-Air, Samsung, LG Electronics, National Panasonic, Sanyo, York, American Home, Markes)

Mechanical Contractor for HVAC System. ( Design, Supply, Installation, and other Mech,l Services for Commercial & Industrial establishment)

Head Office address

3/F Savers Mall Bldg., Mc.Arthur Hi-way., Balibago, Angeles City, Pampanga,

Philippines, 2009; Tel 045-***-**** loc. 156 / Telefax no. 045-***-****

Contact: Mr. Jojie Espiritu – Installation and Sales

Duration: April 08, 2006 to April 30, 2009

Position: Service ( HVAC) Manager and Totaline Head

Duties & Responsibilities:

SKU Air - conditioning and Industrial Service, Inc

& Totaline Air- conditioning parts Supply

Installation Section:

Responsible for plan activities and prepares the schedule for bill of materials as well as work schedule for labor cost budget, and set up the target completion date of each project.

Monitor the materials budget and labor cost budget are duly monitored avoid excess purchases of materials and the work schedule is always followed.

Coordinate with the leadman / foreman in seeing to it that the all duties and responsibilities of workers (Aircon Installer/Technician, Duct man, helpers, etc) at site and support people are properly carried out.

Ensure that all relevant project documents and information especially scope of works and supply and excluded items are available to him.

Ensure that all imported equipment is ordered to effect delivery without delay.

Ensure that all compliance with the design will be achieved with minimal revisions. Should call the attention of all concerned and be able to propose and implement the best possible solution to the problems at hand.

Ensure that all materials used at the site are those that will meet the specification relative to the project requirements and are available as they need it.

Ensure that attends regular jobsite coordination meeting to be update with the plans.

Regularly review the progress of work taking cognizance of project accomplishments and to coordinate necessary action to correct any slippage and / or delays noted.

Should not perform the installation and implementation of change orders without sufficient acknowledgement of the owner or the representative, and appropriate contracts for change orders are signed prior to change in works.

Submits periodic report to the people concerned to include:

a) Contracts for all change of orders that would be needed by the accounting department.

b) Minutes of the regular job site meeting.

Conduct periodic site meeting with the workers to develop teamwork and identifying areas for improvement and acting on problems presented. Ensure that the workers understand their specific duties and responsibilities at site.

To report to the president office, all matters affecting installation and project implementation such as irregularities and malpractices and the action taken.

Ensure that design engineering conducts an accurate survey on the projects site to avoid frequent problem of having t o revise the design due to unnoticed heat load, or beams that blocking the pipelines, etc.

Coordinates with the Account Receivable staff regarding problems relayed by the customers and have such problems duly acted in the shortest possible time so that collection would not be delayed.

Coordinate timely the purchase of the materials, and/or local equipment needed in the project and sees to it that these are duly delivered at site based on the pre-determined schedule.

Engineering Section:

Designed HVAC systems for office buildings, Preventive maintenance works building facilities, spa, hotels, restaurants, hospitals, schools, condominium and stores. Created detailed drawings and related documents for bids, coordinating with project engineers and architects. Presented alternative designs to engineering staff and clients.

Calculated building HVAC requirements to ensure adequate capacity of system.

Attended vendor presentations to learn about developments in HVAC technology.

Company: DIVINO SUB - COOLING Air CONDITIONING

(Installer of brand name Carrier, Koppel, Hitachi, Kolin, Mit-Air, Samsung, LG Electronics, National Panasonic, Sanyo, York, American Home, Markes, Chilled –water system, repair services refrigeration and air-conditioning unit)

Shop Address :

314 Tarlac St., Mt. View Subd., Balibago, Angeles City, Philippines, 2009

Contact: Mr. Divino Alapag – self owner company

Duration: December, 2008 to September 3, 2009

Position: Mechanical (HVAC) Engineer

Duties & Responsibilities:

1) Research, design, evaluate and develop machines and tools.

2) Installations and preventives maintenance work machines applying engineering principles.

3) Power using machines include: preventive maintenance refrigeration and air conditioning machines, material handling systems are some of the other power using machine that they have to work on.

4) Work on water system, heater, gas, and steam operated machines and engines.

5) Study and analyze blue prints, technical drawings drawn with hand as well as computers and schematics.

6) Examine reasons of machine failure and locate exact problem. Suggest remedial measures and give repair instructions,

7) May have to oversee production function and ensure that production is taking place.

8) Help in hiring technicians and training them.

9) Directly communication business establishment owner, owner building, contractor and corporation. Responsible for an effective and efficient execution of HVAC mechanical work installation on project site, repair services electrical or mechanical, and shall also be in-charge of inventory management.

Knowledge and Skills:

1) Must be abreast with latest trends in mechanical engineering.

2) Good knowledge of machines and tools and will to deal on a daily basis and familiar with tools

3) Sound in all aspects of mathematics and aware of design tools and techniques.

Company: ADVILL GENERAL SERVICES CORPORATION

Contracting company of mechanical work. civil, and electrical work. Such manufacturing, industrial, rehabilitation work of industrial plant

Address : 62 Genine St., Porac, Pampanga, Philippines, 2008

Tel # (045-***-****, 323-6051; 092*-***-****; (045-***-****

Contact: Eng’r. Catalino Adizas – Proprietor / CEO

Duration: September 10, 2002 to January 15, 2005

Position: Operation Manager

Duties & Responsibilities:

Manage the operation / preventive works of maintenance shutdown machine, facilities equipment and increase the effectiveness and efficiency of Support Services (Finance), through improvements to each function as well as coordination and communication between support and business functions.

Play a significant role in long-term planning, including an initiative geared toward operational excellence.

Improve the operational systems, processes and policies in support of organizations mission -- specifically, support better management reporting, information flow and management, business process and organizational planning.

Oversee overall financial management, planning, systems and controls.

Management of agency budget in coordination.

Development of individual program budgets

Invoicing to funding sources, including calculation of completed units of service.

Payroll management, including tabulation of accrued employee benefits.

Disbursement of checks for agency expenses.

Organization of fiscal documents.

Regular meetings CEO around fiscal planning.

Supervise and coach office manager on a weekly basis.

Prepare material needs in site area, and in-charge of inventory management.

Responsible for contract bidding, estimate cost, schedule of work, purchase material approval and collection of cash.

Company: ALAPAG & COMPANY

(Document Service Gov’t. and private)

Office Address:

Marlim Mansion Building, Room 10-103, 2nd Floor, Arayat Avenue, Diamond Subd, Balibago, Angeles City, Philippines, 2009.

Tel #: (045-***-****; (045-***-****; (045-***-****

Contact: Miss. Jane Francis C. Pradilla – Office Supervising

Duration: May, 2002 to December 2004

Position: Consultant

Duties & Responsibilities:

Directly communicate business establishment, or contractor shall be responsible for an effective and efficient execution of licenses, permit building, taxes, and auditing report document management.

Company: E.L. DAVID CONSTRUCTION

Civil, Mechanical and Electrical work construction of private and government project

Office Address: # 4384 Mc. Arthur Hiway, Sta., Maria Village, Balibago, Angeles City, Philippines, 2009; Tel; 045-***-**** / 045-***-****

Contact: Eng’r. Raymundo I. David – Project Manager

Duration: December, 1998 to 1999

Position: Technical job staff

Duties & Responsibilities:

Estimation of material, implementation of design construction in site area, make schedule of delivery material in project site, inspect site work operation and report to operation manager.

Company: MECHAPHIL FOOD PROCESSING

(Processing of seafood product for export with maintaining below negative 36 C temperature system)

Head Office: Greenfields Development Bldg.,# 710 Shaw Blvd., Mandaluyong, Metro Manila, Philippines, 3119; Tel # 02-706898 / 02-707294 / 7900-47

Contact: Mr. Ludivico C. Lazarte – President / Manager

Duration: February 2, 1992 to May 15, 1992

Position: Supervisor

Duties & Responsibilities:

Supervise the operator / preventive maintenance of industrial equipment such as heater, cooling tower, pump motors, ice manufacturing plant construction, compact disk freezer, ammonia ice freeze, and hydraulic refrigeration ice freezer, storage freezer for export seafood product and shall be responsible for an effective and efficient execution of mechanical work installation on ice plant project site and shall also be in-charge of inventory management.

Company: YAKULT PHILIPPINES, INC.

(Manufacturer and Distributor of Yakult Product)

Address : Ermita, Manila, Philippines

Head Office: Heritage Condominium, Dr. A Vasquez Street, Malate, Manila, Philippines; Tel # 57-36-06, 59-63-89

Contact: Mr. Edilberto A. Fernandez – Assistant HR

Duration: March 13, 1989 to January 31, 1992

Position: Head Technician

Duties & Responsibilities:

Responsible for preventive maintenance room air-conditioning unit, split type AC up to 20 hp., water heater, Duct works, Plumbing system, electrical system works, refrigeration chiller, equipment facilities, room storage in every area center, trouble shooting electrical and repair services, mechanical motor and electrical remedies.

Company: SELF EMPLOYED / Owner Shop

(Repair services of refrigeration and air conditioning system, cleaning service for aircon split and window type, painting refrigerator

Address : 317 San Pablo St., Mt. View Subd., Balibago, Angeles City, Philippines, 2009

Duration: June 15, 1986 to 2003

Position: RAC Technician / Manager / Maintenance Engineer

Duties & Responsibilities:

Responsible for air-conditioning unit, refrigeration chiller, storage in every area center, trouble shooting electrical and repair services, mechanical and electrical remedies. Responsible for cater maintenance services on call- service to Hospital building, Restaurant, and Hotel as follows:

(Inclusive Date)

A). BONANZA HOTEL & MOTEL, INC. September 1988 to July 1989

B). DR. ARMANDO L. GRACIA’S MATERNITY &

GENERAL HOSPITAL February 1988 to October 1988

C). WGK MANAGEMENT INCORPORATED June, 1987 to April, 1988

Company: ALAPAG COMPOUND

Apartment Building Services

Address : Mt. View subd., Balibago, Angeles City, Philippines, 2009

Contact: Mr. Marcelino T. Alapag – Proprietor

Duration: June 15, 1986 to March 31, 1989

Position: Manager

Duties & Responsibilities:

Responsible for air-conditioning unit, electrical, painting, carpentry works and repair services, mechanical and electrical wirings.

Company: PHILIPPINE AIRLINES (PAL)

Maintenance Department for airlines turbines engines

Address : Gate 3, Nichols, Paranaque, Manila, Philippines

Contact: Mr. Carlos V. Mendiola - Supervisor

Duration: April, 1986 to May, 1986

Position: Trainee

Duties & Responsibilities:

Responsible for collection of aircraft jet turbine engine parts, monitor the incoming and out going part for spey part and dart part engine of airlines engines,

Company: VICTOR'S ELECTRICAL SHOP

Contracting electrical work, generator set, maintenance services, repair industrial motor

Address : Sampaguita St, Nepo Subd., Angeles City, Philippines, 2009; Tel #: (045)-5104

Contact: Mr. Edwin Villarosa - Supervisor

Duration: May 1, 1984 to December 31, 1985

Position: Technician

Duties & Responsibilities:

Responsible for rewinding motor (1/4 horsepower to 20 hp), trouble shooting electrical and repair services appliances such fans, washing machines, motor pumps, replacement of mechanical parts and electrical remedies.

Company: ALAPAG & COMPANY

Accounting, keeping of company, consulting firm for taxes related

Address : Arayat Avenue, Diamond Subd, Balibago, Angeles City, Philippines, 2009

Contact: Miss Annette Catacutan – Office Supervising

Duration: August 31, 1983 to July 1, 1984

Position: Messenger

Duties & Responsibilities:

Responsible delivering document of client, billing statement, permits, taxes document, mayor permit, collection of payment.

PERSONAL INFORMAION

HIGHEST EDUCATION ATTAINED

Bachelor of Science in Mechanical Engineering (B.S.M.E.)

ELIGIBITY * Registered Mechanical Engineer (RME)

Philippine Regulation Commission (PRC), Manila

Broad Rating: 79.4 %, License Number: 0036191

Date taken examination: October 27, 28, 29, 1987

Date issue license: April 27, 1988

* Legible to work U.S.A. (Green Card holder)

* Civil Service eligible as Elected Public official

Year: July 1, 1997 to August 15, 2002

ORGANIZATION MEMBER Philippine Society of Mechanical Engineers, P.S.M.E.

Makati ( Host ) Chapter / Pampanga Chapter

Email Address acxu76@r.postjobfree.com

Current address Madina International Airport, Madinah, KSA

SKILL Computer Literate

SPOKEN/DIALECT SPOKEN English and Filipino

YEARS OF EXRERIENCE - 21 years in technical & engineering work

-8 years in office work,

-31 years total experience

EDUCATION BACKGROUND

SCHOOL EDUCATION ATTAINMENT / DEGREE YEAR ATTENDED

Holy Angel University Refrigeration and Air-conditioning Course (RAC) 1988

Holy Angel University Bachelor of Science in 1983-87

Mechanical Engineering (B.S.M.E.)

Far Eastern University (F.E.U.) First Year Engineering 1982-83

Holy Angel University High School 1978-1982

Gueco Elementary School Grade I to Grade VI 1971 -1978

Lip lin School Kinder Garden 1977-78

PERSONAL DATA

Civil Status Single

Names of Children Divine Mary Maglane age: 20 years old

Paul Davene age: 18 years old

Citizenship Filipino

Name of Father Marcelino T. Alapag Certified Public Accountant

Name of Mother Natividad B. Alapag Decease

Date of Birth December 21, 1963

Age 52 years old

Place of birth Angeles city, Philippines

PHYSICAL DESCRIPTIONS

Height 5’ 2” inches

Weight 182.6 lbs.

Color of Hair Black

Color of Eyes Black

Build Medium

Complexion Brown

ADDITTIONAL PERSONAL INFORMATION

Social Security # ***-**-****

Texas ID # 41454450

Alien ID # 065-247-156

Card ID # IOE0195869875

PASSPORT NUMBER ` EC0192766

DATE TRAININGS AND SEMINARS

March to May, 1987 * Special Summer Training in refrigeration and air-conditionining

* Mechanical Failure and Analysis (Sponsored by Caltex Philippines)

February 25, 1989 * Failure and Damage Analysis

May 17, 1989 * Orientation and Seminar on Government Regulatory and Licensing

procedures on:

A. Electrical Construction and installation

B. Mechanical Construction and installation

C.Radio telecommunication system Application and Licensing Sponsored by: Association of Government Mechanical, Electrical and Electronics Engineers of the Philippines.

September 27, 1986 * BIO - GAS Technology, Sponsored by Philippine Engineers review Center, (PERC)

February 7 1987 * Nuclear Power Engineering, Sponsored by Philippine Engineers review Center, (PERC)

June 24, 1989 * Manufacturing and Process Management- Sponsored by: Westinghouse, Inc.

October 27, 1989 * Workshop seminar on computer- aided, heating, ventilation, and air- conditioning system design (HVAC).

July 22 1989 * Compress Air Technology-Sponsored By: Ingersol Rand Philippines, Inc.

July 29, 1989 * Forging Application thru Proper Use of Compressed Air Technology- Sponsored by: Atlas Copco Philippines

July 2 – August 6, 1989 * Computer – Aided Heating, Ventilating and Ai – conditioning system design Sponsored by General Engineering and Computer Training Center

August 13, 1988 * Product Seminar Orientation of Tecumseh Products Co. USA – Sponsored by : Imperial Appliances & Equipment

October 27,1989 * Technical Seminar on Package Type Air conditioner Application and Technology Engineers, Contractors, and Technicians – Sponsored by: Philippine Society of Ventilation, Air-conditioning and Refrigerating Engineers (PSVARE).

February 20, 1990 * Trade and Evaluation Test as Refrigeration Mechanic, Sponsored by Executive Technical Consultants

July 7, 14, 21, & 28, 1990 * Seminar on Refrigeration and air-conditioning system-Sponsored by: Philippine Society of Mechanical Engineers (Manila Host Chapter).

June 20, 2006 * Technical Seminar on Mitsubishi Heavy Industries New Inverter Multi system KX4 Sponsored by Mit – Air Inc.

November 18, 2006 * Service Maintenance

November 18, 2006 * New Generation Screw Compressor for R-134A

March 23, 2007 * ISTIV Orientation Course Sponsored by: Regional Tripartite Wages & Productivity board No. 3

February 28, 2008 * L. G. Air – conditioning Technical Service Seminar

* Panasonic Design and Service Technical Seminar

August 16, 2008 * Hitachi Service Center Technical Training

November 8, 2008 * Hitachi Multi – split DC Inverter Type Air conditioner - Introduction to Hitachi Set - Free

October 15 – 16, 2008 * Energy Efficiency and Audit Seminar Workshop, held at Maja Rica Hotel, Barangay Ligtasan, Tarlac City

February 28, 2009 * Hitachi Multi – Split DC Inverter Type (Technical Seminar).

July 25, 2009 * Chilled - water system and HVAC application / system, sponsored by

P.S.M.E. (Makati Chapter), held at Architectural Center, Makati City



Contact this candidate