Post Job Free

Resume

Sign in

Project Engineer

Location:
Al Khobar, Eastern Province, Saudi Arabia
Posted:
December 07, 2016

Contact this candidate

Resume:

SAP PM / WCM Consultant

Thirumal Reddy Akula

Email: acxswu@r.postjobfree.com

Mobile: +91-900*******

Summary

Highly energetic, self-motivated, zealous and goal-oriented professional with proven success for over 9+ years, 6+ in IT industry and 3+ years as a Maintenance Engineer.

Have involved in 4 End to End implementation, 6 Rollouts and 9 Support Projects in SAP PM /WCM

Have in-depth knowledge in Breakdown Maintenance, Preventive Maintenance, Predictive Maintenance and general maintenance processes.

Have experience in implementation of SAP Screens Personas.

Have good knowledge in SAP CS, MM, PP, QM.

Have depth knowledge in integration with other modules of SAP i.e FI, CO, MM, QM, PP, CS, PS.

Have experience in preparing the FS for developing ABAP reports.

Quick in learning and working with new technologies to fulfill project needs.

Effective team working skills. Able to work both as an individual and as a team member within multi-disciplinary team.

Zeal to learn new things, good communication skills, very quick in adapting new technologies

Work Experience

Working as SAP Lead Consultant for Wipro Ltd.

(From 1st Nov 2014 to till date)

Worked as SAP Consultant for Zylog Systems Ltd.

(From 10th Jan 2014 to 31st Oct 2014)

Worked as SAP Associate Consultant for Lanco Group of Companies.

(From 22nd Oct 2011 to 31st Dec 2013)

Worked as a Senior Engineer for Lanco Infratech Ltd

(From Aug 04, 2007 to Oct 18th 2011)

Support Projects Details

Project 1

Client: Cairn India limited

Project: SAP Shared Support

Position: SAP Senior Functional Consultant

Industry: Oil & Gas Industry

Location: Gurgaon

Duration: Dec-2014 to Sep-2015

Project 2

Client: Dalmia Cements (Bharath) limited

Project: SAP Shared Support

Position: SAP Senior Functional Consultant

Industry: Cement Industry

Location: Hyderabad.

Duration: Nov-2014 to Sep-2015

Project 3

Client: Petro Net Limited

Project: SAP Shared Support

Position: SAP Senior Functional Consultant

Industry: Oil & Gas Industry

Location: Hyderabad.

Duration: Nov-2014 to Sep-2015

Project 4

Client: Binani Cements limited

Project: SAP Shared Support

Position: SAP Senior Functional Consultant

Industry: Cement Industry

Location: Hyderabad.

Duration: Nov-2014 to Sep-2015

Project 5

Client: Orient Cements

Project: SAP Shared Support.

Position: SAP Senior Functional Consultant

Industry: Cement Industry

Location: Hyderabad.

Duration: July-2015 to Sep-2015

Project 6

Client: Galaxy Surfactants

Project: SAP Shared Support

Position: SAP Senior Functional Consultant

Industry: Chemical Industry

Location: Hyderabad.

Duration: Nov-2014 to Sep-2015

Project 7

Client: Ruchi Soya

Project: SAP Shared Support

Position: SAP Senior Functional Consultant

Industry: Edible oil

Location: Hyderabad.

Duration: Nov-2014 to Sep-2015

Project 8

Client: Lanco group Of Companies

Project: SAP In-house Support

Position: SAP Associate Consultant

Industry: EPC

Location: Hyderabad.

Duration: July-2012 to Dec-2013

Roles & Responsibilities in Support Projects:-

Logging the tickets received by the users

Solving the tickets based on their priority

Conducting the Key & End User training periodically.

Doing R&D to make the system more user friendly

Preparing the Functional specifications as per the client requirement

Working with the technical team to develop smart forms, enhancements and Developments.

Quarterly visit to the client location and conducting the Audits as per the SLA.

Implementation Projects Details

Project 1

Client: Delmon Group of Companies

Project: SAP Implementation

Position: Lead Consultant.

Industry: Manufacturing

Location: Al Khobar, Saudi.

Duration: April-2016 to Till Date.

Project 1

Client: OUSHADHI, (Govt of Kerala Undertaking)

Project: SAP Implementation

Position: Sr. Consultant.

Industry: Pharmaceutical Industry

Location: Thrissur, Kerala.

Duration: Oct-2015 to Till Date.

Project 2

Client: BHPV (Bharath Heavy Plates & Vessels) a subsidiary of BHEL

Project: SAP Implementation

Position: SAP PM Consultant & Project Lead.

Industry: Engineering Industry

Location: Visakhapatnam.

Duration: Jan-2014 to Oct-2014

Project 3

Client: Lanco Infratech Ltd

Project: SAP Implementation

Position: Associate Consultant

Industry: EPC Industry

Location: Hyderabad.

Duration: Oct-2010 to Aug-2011

Roles & Responsibilities in Implementation Projects:-

Project Preparation Phase – During this phase, following components are discussed and documented:

Initial Project Planning ( Time frame, deliverables, etc)

Project Team Members

Project Kickoff

Technical Requirements

Business Blueprint Phase - In this phase, a detailed study of business processes and business requirements are undertaken. This is the phase we interact with respective Core Team Members or Process Owners. The entire requirements gathered during this phase are documented as Business Blueprint. During this phase, following components are discussed and documented:

AS-IS business Process Understanding.

To-Be business Process.

Organizational Structure Definition

Business Process Master List (BPML)

Business Process Definition

Formal Sign off on AS-IS and To-BE business process

Realization Phase - In this phase, all the business and process requirements are implemented as documented in Business Blueprint. SAP ECC system is configured step by step in two work packages, Baseline (Major Scope) and Final configuration (Remaining scope).

Baseline Configuration on Development server

System Management

Business Scenarios & Process Documentation

Transportation of Transportation request from Development server to Quality server.

Final Configuration on Quality server.

Unit Testing & Documentation

Final Integration Test & Documentation.

Regression Test & Documentation.

Master data collection in specified Templates and uploading.

Manual configuration (Number Ranges, Factory Calendar etc)

End User Training & Documentation

Formal Sign off.

Final Preparation Phase - During this phase, following activities are discussed, completed and documented, successful completion of these activities leads to transition of all configurations settings to live R/3 System

Cutover Strategies & Plans

Transportation of request from Development server to Production server.

Manual configuration (Number Ranges, Factory Calendar etc)

Cut over data collection in specified Templates and uploading.

End User Training

System Readiness Check

Formal approval for the Go Live.

Go Live and Support Phase – This is phase where all configurations/customizations are transported to live production operation and business starts all its activities in the SAP.

During this phase, all the problems/issues related to hardware, network, operating system, database, training, and application system are addressed by the project team members and they help the end users in achieving their day to day task/assignments. This phase is further divided as:

Formal sign off after smooth Go-live.

Monitoring the Process, Reports etc.

Issue log Maintenance and closure.

Discussion on change Management Request.

Rollout Projects Details

Project 1

Client: Thai Chemicals (Aditya Birla Group)

Project: Rollout Project

Position: SAP Senior Functional Consultant

Industry: Chemical Industry

Location: Hyderabad.

Durations: Nov-2014 to Dec-2014

Project 2

Client: Orient Cements

Project: Rollout Project

Position: SAP Senior Functional Consultant

Industry: Cement Industry

Location: Devapur,Telangana.

Duration: July-2015 to Aug-2015

Project 3

Client: Petronet LNG Ltd

Project: Rollout Project

Position: SAP Senior Functional Consultant

Industry: Oil & Gas Industry

Location: Kochi, India.

Duration : May-2015 to June-2015

Project 4

Client: Lanco Anpara Power Ltd

Project: Rollout Project

Position: Associate Consultant

Industry: Power Production Industry

Location: Anpara, Uttar Pradesh.

Duration: Sep-2011 to Nov-2011

Project 5

Client: Udupi Power Corporation Ltd

Project: Rollout Project

Position: Associate Consultant

Industry: Power Production Industry

Location: Udupi, Karnataka.

Duration: Dec-2011 to Feb-2012

Project 6

Client: Lanco Amarkantak Power Ltd

Project: Rollout Project

Position: Associate Consultant

Industry: Power Production Industry

Location: Pathadi, Chhattisgarh.

Mar-2012 to June-2012

Roles & Responsibilities in Rollout Projects:-

Studying the existing business process

Mapping the business scenario in SAP.

Performing User acceptance and System acceptance test.

Giving the End-User Training

Preparing the End User Documents.

Make sure that the rollout is done as per the Company requirements.

Roles & Responsibilities as Maintenance Engineer from Aug-2007 to Oct-2010

As a Maintenance Engineer taking care of operation & maintenance (preventive, defective & reliability) of HVAC equipment’s in the plant such as chillers, air handling unit, package unit, split unit, fan coil unit, heater, exhaust fans, building automation systems and building management system.

Completed mandatory training/testing in petrochemicals safety requirements such as Basic safety, Electric level 2, EPPS (Electronic Permits)

Worked for operational and emergency maintenance of the Thermal Power stations and supporting auxiliaries, working in 12 hours shifts. Working responsibility included O & M, startup commissioning & annual shutdown of 4 TCR’s(thermal Control Rooms) with 8 units-Boilers(MHI-1150TPH) & Steam Turbines (MHI-3000RPM) and Generators (TOSHIBA-300 MW) each

Qualification

B.E in Mechanical Engineering in 2007 with 72 %

Declaration

I hereby declare that the above information is true to the best of my knowledge.

Place: Hyderabad. (Thirumal Reddy Akula)



Contact this candidate