Post Job Free

Resume

Sign in

Project Engineer

Location:
Masai, Johor, Malaysia
Posted:
December 04, 2016

Contact this candidate

Resume:

- Lead Planner / Lead Scheduler Email Address: acxq8u@r.postjobfree.com

- Project Controls Engineer acxq8u@r.postjobfree.com

-Quantity Surveyor

PERSONAL DATA

Nationality: Filipino Birthplace: Manila, Philippines

Civil Status: Married Address 1: Block 6, Lot 1

Pathmosville, Tagburos

Puerto Princesa City

Palawan, Philippines

Birth Date : Dec 31, 1958 Tel. No. : (+63) 917.5480.229

(+63) 921.7313.365

(+63) 919.9962.301

(+60) 10.4319.872

EDUCATION

BS Management & Industrial Engineering, 1983

Mapua Institute of Technology

Special Studies / Training / Seminars

Motion & Time Study, MIT

Methods and Time Measurement, MIT

Methods and Systems Procedure, MIT

Operations Research Seminar, MIT

COMPUTER LITERACY:

Software Application

Spreadsheets : Microsoft Excel 2007 / 2010

Graphics : Power Point

Word Processing : Microsoft Word 2007 / 2010

Scheduling : P3.1 / P5 / P6 v.8R1 and 15 / Microsoft Project

SUMMARY OF EXPERIENCE

Total experience of thirty three (33) years in the multi-disciplined Engineering, Construction, and Project Management on Oil and Gas, Petrochemical and Industrial Plants, New US Embassy and Mining Projects including 25 years of Project Controls (Saudi Arabia; Malaysia, Armenia, Kazakhstan, Sudan, Congo, Egypt, Malta, Mongolia, India, Kazakhstan and Malaysia).

Senior Project Controls Specialist (LG-21 Global Expat) – Petronas RAPID Project

Buildings and E&I Lead Planner

(01-Jun-2015 to Present)

Job Scope:

Report to and assist Field Planning Manager in various planning job.

Lead Planner for all Building and E&I Packages.

Build relationships and trust with client Project Planners and understand project schedule and practices.

Work closely with the Engineering / Procurement Planners based in Kuala Lumpur on any construction schedule impact that may arise after the Engineering / Procurement schedule update.

Work closely with Contracts and Engineering Department in the preparation of Exhibit C – Time Schedule.

Review material availability dates and their impacts to the construction schedule.

Interface with the engineering and procurement planners to get updates on Engineering / Procurement schedule updates.

Review Contractor’s Baseline /Re-baseline schedule and recommend corrective actions to have a realistic schedule during execution.

Updates Weekly and monthly dashboard.

Generate and maintain all Manpower Histogram / S-curve as required by the Field Planning Manager.

Close coordination with the Contractor’s Planner regarding construction sequences and critical activities.

Attend weekly construction and subcontractor’s meetings.

Participate in the Site Leadership Team meeting in the development of 90 day look-a-ahead schedule.

Develop simulation schedule for Buildings and E&I to ensure that consumer required dates are met.

Review Contractors Weekly Progress Report and schedule.

Close coordination with the Mile Marker Progress Coordinator regarding earned man-hours and quantities to match OUI-JV Master Schedule and Contractor Schedule.

Runs and analyzes critical path schedule on a bi-weekly and monthly basis.

Does odd jobs as directed by the Field Planning Manager.

Fluor Corporation / KPJV

FGP-1 Project

Early Works Infrastructure / Petrochemical Oil

Senior Project Controls Specialist (LG-21 Global Expat) – EW Infrastructure

Lead Planning Engineer

(16-Jan-2014 to 01-Apr-2015)

Job Scope:

Report to and assist Field Planning Manager in various planning job.

Lead Planner for Early works Infrastructure such as TCOV, 3GI, 3GP, Taxiway, IHR and IBMOA.

Build relationships and trust with client Project Planners and understand project schedule and practices.

Work closely with the Engineering / Procurement Planners based in Atyrau on any construction schedule impact that may arise after the Engineering / Procurement schedule update.

Review material availability dates and their impacts to the construction schedule.

Interface with the engineering and procurement planners to get updates on Engineering / Procurement schedule updates.

Review Contractor’s Baseline /Re-baseline schedule and recommend corrective actions to have a realistic schedule during execution.

Generate and maintain all Manpower Histogram / S-curve as required by the Field Planning Manager.

Close coordination with the Contractor’s Planner regarding construction sequences and critical activities.

Coordinate with the Client’s Planners of each areas.

Attend weekly construction and subcontractor’s meetings.

Participate in the Site Leadership Team meeting in the development of 90 day look-a-ahead schedule.

Develop internal detailed schedule for TCOV Data Center, Construction Compound Data Center, Water Treatment Facilities Installation and Construction Water Strategy including Firewater Frac Tank.

Review Contractors Weekly Progress Report and schedule.

Close coordination with the Mile Marker Progress Coordinator regarding earned man-hours and quantities as well to match KPJV Master Schedule.

Runs and analyzes critical path schedule on a monthly basis.

Does odd jobs as directed by the Field Planning Manager.

RESUME OF POSITION HELD

Fluor’s Project Inc. Mumbai, India

Reliance Jamnagar 3 Mega Project – USD 16B

Petrochemical / Refinery Project

Senior Project Controls Specialist (LG-21 Global Expat) – Procurement Planner

(09-Feb-2013 to 30-Sep-2013)

Job Scope:

Report to and assist Project Controls Director/Manager in the development of reports on Tagged, Bulk and semi-bulk materials procurement and Quantity Status Report.

Build relationships and trust with client Project Planners and understand project schedule and practices.

Work closely with the Materials Group in the CWP definitions and allocations for the 12 complexes.

Schedule & Plan / Monitor procurement and material delivery dates and their impacts to the construction schedule.

Interface with the engineering and procurement personnel to get updates on Technical Bid Evaluation and Frame agreement LOA dates.

Daily, weekly, monthly status reports to keep management and/or owner on procurement progress for Tagged, Bulk and Semi-bulk Materials.

Generate and maintain all reports such as J3 project material status report which reflects quantities, MTO and IFC release dates and procurement cycle statistic.

Close coordination with the Material Department to get updates on MRP, P.O. and received quantities.

Coordinate with the Project Planners of each complex to get update of MTO, IFC and RAS dates.

Attend weekly meetings to discuss CWP definition / allocation for each complex, delivery dates.

Participate in procurement weekly meetings to address any target dates issues raised.

Does odd jobs as directed by my immediate superior.

FPMM –LLC, Oyu Tolgoi Project Khambogd, Mongolia

Fluor’s Mining Project in Mongolia

Ivan Hoe Mines Mongolia Inc.

Gold and Copper Mining

Project Controls Specialist IV (LG-20) - Concentrator - Scheduler

(05-Nov-2010 to 21-Nov-2012)

Job Scope:

Prepares overall Project Cost and Schedule from Engineering, Procurement and Construction phase.

Process Plant Schedule including monitoring and updating.

Review subcontractors schedule and recommend schedule improvements.

Review and Publish Two Week Look Ahead Schedule submitted by subcontractors on a weekly basis.

Update and publish P6 Level 2 Concentrator Process Plant Schedule including critical path analysis every month.

Develop/maintains internal P6 Level 3 Schedule to support the P6 Level 2 Concentrator schedule.

Monitor and report on construction progress. Suggest means of delay recovery.

Liaise with Construction and Procurement group regarding construction activities and equipment status.

Prepare responses to any site correspondence concerning the construction time schedule.

Attend weekly project controls coordination and progress meeting.

Prepare subsystem schedule to support pre-ops and turnover activities.

Performs other project controls related activities. Involved in the development of P6 Level 2 Concentrator.

Performs odd jobs as directed by my immediate superior.

AICI -SP

New US Embassy Project – USD 83.5 Million Cairo, Egypt / Valetta, Malta

Project Scheduler

(07-Mar-2008 to 30-Sep-2010)

Job Scope:

Manages, controls and updates Project Execution Schedule (P3/P6) based on daily work progress

Prepares monthly cash flow projections for budget formulation and presentation

In close coordination with the engineers and superintendents for the actual status of each of the various activities that is ongoing and still in the startup stage

Submission of weekly and monthly reports to Overseas Building Operations (OBO) which includes critical path, design, procurement and construction works, as well as preparation of accompanying narrative report that comprises work progress, issues discussed during OBO weekly scheduling meetings, and planned works for the incoming months and recovery plans for delayed works

Formulates weekly and monthly reports to management such as work progress, recovery plan for delayed activities, design issues and materials procurement and deliveries

Prepares work schedule to substantiate request for project time extension

Monitors and controls Materials Tracking Schedule

Prepares tender schedule using Primavera Project Planner for New USA Embassy Compound.

B.L. Harbert International

New US Embassy Project – USD 99 Million Khartoum, Sudan

New US Embassy Project – USD 57 Million Brazzaville, Congo

Project Scheduler

(18-Jan-2007 to 07-Mar-2008)

Job Scope:

Manages, controls and updates Project Execution Schedule (P3/P6) based on daily work progress

Prepares monthly cash flow projections for budget formulation and presentation

In close coordination with the engineers and superintendents for the actual status of each of the various activities that is ongoing and still in the startup stage

Submission of weekly and monthly reports to Overseas Building Operations (OBO) which includes critical path, design, procurement and construction works, as well as preparation of accompanying narrative report that comprises work progress, issues discussed during OBO weekly scheduling meetings, and planned works for the incoming months and recovery plans for delayed works

Formulates weekly and monthly reports to management such as work progress, recovery plan for delayed activities, design issues and materials procurement and deliveries

Prepares work schedule to substantiate request for project time extension

Monitors and controls Materials Tracking Schedule

J. A. Jones International (a Fluor Company)

New US Embassy Project – USD 74 Million Port au Prince, Haiti

Project Controls Engineer II

(15-May-2006 to 09-Jan-2007)

Job Scope:

Manages, controls and updates Project Execution Schedule (P3/P6) based on daily work progress

Prepares monthly cash flow projections for budget formulation and presentation

In close coordination with the engineers and superintendents for the actual status of each of the various activities that is ongoing and still in the startup stage

Submission of weekly and monthly reports to Overseas Building Operations (OBO) which includes critical path, design, procurement and construction works, as well as preparation of accompanying narrative report that comprises work progress, issues discussed during OBO weekly scheduling meetings, and planned works for the incoming months and recovery plans for delayed works

Formulates weekly and monthly reports to management such as work progress, recovery plan for delayed activities, design issues and materials procurement and deliveries

Prepares work schedule to substantiate request for project time extension

Monitors and controls Materials Tracking Schedule

J. A. Jones International (a Fluor Company)

New US Embassy Project – USD 63 Million Astana, Kazakhstan

Sr. Office / Scheduling Engineer

(24-Jul-2005 to 14-May-2006)

Job Scope:

Prepares overall Project Cost and Schedule from Engineering, Procurement and Construction phase.

Prepares monthly, weekly and daily reports (Narrative, Graphics, curve & Histogram).

Evaluates and negotiates Project Change Orders with Subcontractors.

Attends regular coordination meeting with Subcontractor.

Interface works with other departments (i.e. Construction, Contract, Accounting, etc).

Formulates weekly and monthly reports to the management such as work progress, recovery plan for delayed activities, design issues and materials procurement and deliveries

Prepares work schedule to substantiate request for project time extension

Monitors and controls Materials Tracking Schedule

J. A. Jones International (a Fluor Company) North Carolina, USA

New US Embassy Project – USD 63 Million Charlotte

Sr. Office / Scheduling Engineer

(08-June-2005 to 24-Jul-2005)

Job Scope:

Prepares overall Project Cost and Schedule from Engineering, Procurement and Construction phase.

Prepares monthly, weekly and daily reports (Narrative, Graphics, curve & Histogram).

Evaluates and negotiates Project Change Orders with Subcontractors.

Attends regular coordination meeting with Subcontractor.

Interface works with other departments (i.e. Construction, Contract, Accounting, etc).

Prepares work schedule to substantiate request for project time extension

Performs other project controls related activities.

J. A. Jones International (a Fluor Company)

New US Embassy Project – USD 60 Million Yerevan, Armenia

Sr. Office / Scheduling Engineer

(04-Mar-2003 to 08-Jun-2005)

Job Scope:

Prepares overall Project Cost and Schedule from Engineering, Procurement and Construction phase.

Prepares monthly, weekly and daily reports (Narrative, graphics, curves & histograms).

Evaluates and negotiates Project Change Orders with Subcontractors.

Attends regular coordination meeting with Subcontractor.

Interface works with other departments (i.e. Construction, Contract, Accounting, etc).

Prepares work schedule to substantiate request for project time extension

Performs other project controls related activities.

Asea Brown and Boveri

Transmission and Substations Project KL, Malaysia

(MYR) Multi Million Substation Projects

Sr. Scheduling Engineer

(23-Aug-2000 to 26-Feb-2003)

Job Scope:

Prepares overall Project Cost and Schedule from Engineering, Procurement and Construction phase.

Prepares monthly, weekly and daily reports (Narrative, Graphics, and Curves & Histograms).

Manages Subcontract cost and schedules from Engineering, Procurement and Construction phase.

Performs project forecasting and monitors project commitments and expenditures.

Attends the regular Subcontract coordination meeting.

Prepares cash flow analysis.

Process Subcontractor’s invoices and ensure it goes in the right code of accounts.

Initiates request for the increase of Budget, when needed.

Performs other project controls related activities.

Fluor Daniel Arabia Ltd. Yanpet Expansion Project

Yanbu Petrochemical Plant Yanbu, K. S. A.

Utilities & Off-sites / Polymers

USD 2.2 Billion Project

Cost / Scheduling Engineer

(21-Nov-1997 to 16-May-2000)

Job Scope:

Prepares overall Project Cost and Schedule from Engineering, Procurement and Construction phase.

Prepares monthly, weekly and daily reports (Narrative, Graphics, and Curves & Histograms).

Prepares Project capital cost and Tender Check Estimates.

Evaluates and negotiates Project Change Orders with Subcontractors.

Attends regular coordination meeting with Subcontractor.

Prepares cash flow analysis and cost forecast.

Interface works with other departments (i.e. Construction, Contract, Accounting, etc).

Performs other project controls related activities.

Brown & Root Saudi Limited

MTBE, CA EDC/UOC Facilities Sadaf Expansion Project

USD2.6 Billion Project Jubail, K. S. A.

Project Controls Engineer

(02-Feb-1995 to 31-Mar-1997)

Job Scope:

Prepares monthly, weekly and daily reports (Narrative, Graphics, and Curves & Histograms).

Manages Subcontract cost and schedules from Engineering, Procurement and Construction phase.

Performs project forecasting and monitors project commitments and expenditures.

Estimates, evaluates and negotiates Project Deviation Notices (PDN’s) with Subcontractors.

Attends the regular Subcontract coordination meeting.

Prepares cash flow analysis.

Process Subcontractor’s invoices and ensure it is in the right code of accounts.

Interface works with ACLS, Construction and other departments in the preparation of the monthly report using BRSL Cost System (BRICS – Brown & Root Integrated Control System).

Initiates request for the increase of Budget, when needed.

Performs other project controls related activities.

Fluor Daniel Arabia Ltd.

Zuluf AM Capacity Increase Project Dhahran, K.S.A

(Onshore and Offshore)

Scheduling Engineer

(06-Jul-1991 to 31-Oct-1994)

Job Scope:

Prepares overall Project Cost and Schedule from Engineering, Procurement and Construction phase.

Prepares monthly, weekly and daily reports (Narrative, Graphics, and Curves & Histograms).

Attends regular coordination meeting with Subcontractor.

Prepares cash flow analysis and cost forecast.

Interface works with other departments (i.e. Construction, Contract, Accounting, etc).

Performs other project controls related activities.

Independent Consultancy Services Las Piñas, Metro Manila

Sr. Industrial Engineer Manila, Philippines

(Nov. 1989 to Jul. 1991)

Job Scope:

Performs Feasibility Studies in a Manufacturing firm

Set-up labor standard of all product type by conducting time and motion study, methods and system analysis

Set-up material standard of all type through monitoring and experimentation.

American Microsystems Inc. (Phils.) Parañaque, Metro Manila

Sr. Industrial Engineer Manila, Philippines

(July. 1983 to Nov. 1989)

Job Scope:

Determine standard usage per 1,000 units of all overhead accounts such as operating gases, power, chemicals, operating supplies, maintenance costs, freight weight and wedges

Prepare cost analysis from small fixture to capital equipment determining the advantages and disadvantages in terms of cost and function

Conduct time studies to determine units per hour and capacity per station

Do design of jigs and fixtures for methods improvement

Formulates standard operating procedures through motion study.

Professional Reference

Available upon request



Contact this candidate