Resume

Sign in

Power Plant Operator

Location:
Iraq
Posted:
January 14, 2017

Contact this candidate

Muhammad Ali

Pakistan cell: ****-300*******

Iraq cell: 00964-782*******

Email : acx9yc@r.postjobfree.com

Skype : muhammadali7007

PROFILE

To accept the challenging career in the power plant operation and maintenance electrical field that will effectively and efficiently utilize my knowledge and Skills to be a part of an organization that provides excellent opportunities for learning and scope for development, where I can make a significant contribution while developing my skills.

AREAS OF EXPERTISE

I am currently working and have working experience of 09 years as Control Room operator at Combined Cycle Power Plant & open cycle Alshuaiba power plant Basra, Iraq 150 MW with 2 ABB 13D3 Gas Turbine Generator set 92 MW base load of each machine with duel fuel HFO and HSD. (Hilla Power Plant 250MW) Hilla, Iraq having GE Frame MS9001EA Gas turbine (14 combustors, axial flow rotary 17 stages compressor) with Mark6 control system. I have served at Orient Power Plant, Balloki, Lahore, Pakistan & Sapphire Power Plant, Muridke, Pakistan during the erection and commissioning stage from Consultant side as a Control Room Operator. This composition of Muridke 225MW Power Plant (CCPP) consist of 2 x Gas turbine GE 6FA 85 MW and 1 unit of Steam turbine 72 MW Skoda make Steam Turbine, for the generated power dispersal there was a 132kV AIS Substation. Whereas the composition of the Balloki 234MW Combine Cycle Power Plant (CCPP) was of 2 Units of 2 x Gas turbine GE 6FA 85 MW and 1 unit of Steam turbine 77 MW Skoda make Steam Turbine, for the dispersal of generated power and feeding it to National Grid Distribution System; there was a 132kV AIS Substation. Preparation of Work plant shutdown (CI) plant shutdown (MI) electrical troubleshooting.

PRO DIESEL 150 MW POWER PLANT ALSHOIBA (BASRA IRAQ)

FROM-SEPTEMBER 20-2014 UP TO DATE

Pro Diesel (PVT) Ltd

CONTROL ROOM OPERATOR

Major Responsibilities

Shift takes over and reviews the log book to determine the condition/status of each unit load and review the activities of previous shift such as tripping, shut downs and start up etc.

To review the sequence of event/alarm summary and parameters of plant and if any process value deviation or alarm found, clear this alarm/deviation by taking appropriate steps as per standard operating procedure.

Monitoring of running plant and trouble shooting in transient condition as per standard operating procedure.

Perform Startup and shut down of the plant in safe and efficient manners according to standard operating procedure.

Actively involved in GT wet cleaning and compressor off line washing.

Perform load dispatches and control load variations to achieve target load set point within the given time as per customer demand successfully.

2 x 125 MW GAS TURBINE GE FRAME 9E HILLA POWER PLANT, AEPL Oasis

FROM-JULY-2013 TO JULY 2014

CONTROL ROOM OPERATOR

Major Responsibilities

Shift takes over and reviews the log book to determine the condition/status of each unit load and review the activities of previous shift such as tripping, shut downs and start up etc.

To review the sequence of event/alarm summary and parameters of plant and if any process value deviation or alarm found, clear this alarm/deviation by taking appropriate steps as per standard operating procedure.

Perform Startup and shut down of the plant in safe and efficient manners according to standard operating procedure.

Act as first response to emergency situation, take appropriate steps to stabilize the problem as much as possible, while simultaneously informing the shift in charge and other parties as included in the procedures to safe guard the personnel and unit.

Participate in Preparation of isolation certificates, WASAF, PTW, LWA & Confined space entry permit and other safety documents as per requirement of shift in charge as per standard procedure.

OMS PVT (Ltd) FROM-SEPTEMBER 2007 to JULY 2013.

234MW (CCPP) MURIDKE: SEPTEMBER 2007 To DEC 2009

225MW (CCPP) BALLOKI: JAN 2010 TO JAN 2011

41MW BSPM KASUR COGENERATION POWER PLANT: FEB 2011 TO JULY 2013

CONTROL ROOM OPERATOR & PLANT OPERATOR

Major Responsibilities

I was actively involved in all PPA 8.3 test (NTDC tests) and the Reliability Run Test which when ended marked the COD of Balloki power plant.

Commissioning of 225 MW CCPP Balloki Power Plant. I worked with Skoda power TA's in the commissioning of Skoda Power Steam Turbine.

I have also worked on Siemens PCS 7 and ensured the safe, efficient and smooth operation of plant according to OEM recommendations while taking care of load demand of NPCC and RCC.

Shift takes over and reviews the log book to determine the condition/status of each unit load and review the activities of previous shift such as tripping, shut downs and start up etc.

To review the sequence of event/alarm summary and parameters of plant and if any process value deviation or alarm found, clear this alarm/deviation by taking appropriate steps as per standard operating procedure.

Monitoring of running plant and trouble shooting in transient condition as per standard operating procedure.

Perform Startup and shut down of the plant in safe and efficient manners according to standard operating procedure.

Act as first response to emergency situation, take appropriate steps to stabilize the problem as much as possible, while simultaneously informing the shift in charge and other parties as included in the procedures to safe guard the personnel and unit.

Fill up Record sheets of Generator set hourly meter readings. Performs mechanical and electrical equipment isolation.

PLANT OPERATOR

Major Responsibilities

Ensure smooth operation, safe start up / shut down of Power Plant during the shift.

Identify Abnormalities in routine operation of the plant equipment and informing to CRO.

Perform monitoring and adjustments of Generator set parameters for the satisfactory Operation of the units.

Perform the job assigned in a timely and accurate manner; develop the initiative to learn and perform the Electrical and Mechanical skills independently and with confidence. Monitor and adjust vital Generator set parameters (i.e. kW, Amp, kVAR, p.f. etc.) for the satisfactory operation of the units.

Fill up Record sheets of Generator set hourly meter readings. Performs mechanical and electrical equipment isolation.

QUALIFICATION

2010 B-Tech (Hons) Electrical Technology

PIMSAT Lahore

2008 B-Tech (Pass) Electrical Technology

PIMSAT Lahore

2006 Diploma of Associate Engineering in Electrical Technology

Punjab Board of Technical Education Lahore

2003 Secondary School Certificate

Federal Board of Intermediate & Secondary Education Lahore

PERSONAL INFORAMTION

Father's Name Ghulam Hussain

Date of Birth 03 August 1987

Nationality Pakistani

Religion Islam

Marital Status Single

Passport No. FM1793093

Visa status Iraq Multiple Visa

Visa date of issue 26-07-2016

Visa date expire 25-07-2017

LANGUAGES

English (good)

Arabic (intermediate)

Hindi, Urdu, Punjabi (fluent)

Reference

Will be furnished on demand.



Contact this candidate