Career Profile:-
Fourteen years of work experience background in the Oil & Gas cross
country pipelines, Petrochemical-
Onshore terminal Piping /feed pipelines, City Gas distribution
pipeline industry with experience within
fabrication, construction, Installation, QA/QC, Integrity, Inspection
-Welding, NDT, Painting, Coating, Hydro
testing, pigging, Pre-commissioning, Billing and documentations.
Qualifications:-
Bachelors Degree in Mechanical Engineering.
Certifications:-
a) A.S.N.T NDT Level II Certifications in RT, UT, MPT and DPT
Testing
b) HSE-Incident Reporting & Investigations.
Core competencies and professional strengths include:
Pipeline/Piping Construction Welding/
Fabrication/Installa Painting/Coating
tion
Integrity Material QA-QC Project
Assessment Inspection /NDT/LRUT magt/tendering
Cathodic Hydro / Cathodic
protection Pneumatic Testing Pigging/Brownfiel protection
d rehab
Stakeholder Codes/Standards Documentation,
Procedure/ITP/Rep communication Billing
orts
Experience with Steel and HDPE pipelines construction, installation,
inspection/integrity and pre-commissioning.
Experienced with construction management, project tracking, and manpower
/resource management.
Experienced to manage Project stake holder and the community relation
during the project execution.
Much responsible for the environment, safety, quality and sound asset
construction.
Professional Experience:
1. Worley Parsons (Shell BGC)
Pipeline Engineer (Gas Pipelines & associated facilities
Rehabilitation-Sep 2013 to till)
Supported tender preparation, technical query resolution and involved
during tender evaluation.
Involved in pipelines NDT, integrity assessment, Construction and
Rehabilitations.
Pipelines schematic preparation and field engineering information gathering
for development.
Involved in site survey for piggability assessment, coating damage, insulation
checks, wall thickness check by NDT, C-SCAN, LRUT, spot UT.
Prepared Cathodic protection rehabilitation plan, supervised & coordinated
CP system up gradation, site installation & construction works.
Pipeline Inspections, site work monitoring and development of pipeline
inspection reports.
Field survey for pipelines Integrity check, GPS route survey to find old
pipelines and updating pipeline GIS maps.
Repaired existing pipelines to reinforce the wall thickness and to control the
corrosion leaks/damages.
Construction & installation of new pipelines over the corroded/ruptured
pipelines.
Conducted quarterly project Quality & HSE audits, and frequent site walks
for HSE &Quality.
Prepare and issue work orders, manage work orders within the budget.
Attend project weekly, monthly contractor, team weekly meeting and prepare
weekly reports.
Reviewed project procedures, method statements, monitored construction
progress, coordinated site interfacing works.
Prepared and reviewed PTW for works associated with live pipelines and
associated plant facilities.
Prepare weekly reports, review documents and coordinate site works.
2. ONGC Petro additions Ltd
Pipeline Supervisor (Petrochemical piping and 24/10cross country
pipelines-Mar 2010 to Aug 2013)
Reviewed/approved capable and technically qualified contractors for cross
country Pipelines works & for plant piping construction works.
Reviewed contractors pipeline project QA/QC plan, Construction
procedures, method statements & ITPs.
Execution and Inspection performed during pipelines material check,
stringing, Trenching, Mainline Fit up & welding, Field joint coating, PMI,
PWHT, NDT (RT, UT, MPT & DPT), Lowering, Padding, Crossings, Hydro
testing, Pigging, CP installation, Tie ins, Backfilling, Reinstallation, Marker
installation.
Monitored Pipeline /piping shop fabrication works and cross county pipeline
field welding/mainline Tie-in works.
Witnessed Electrode Qualification tests (EQT), Welding WPS, PQR and
conducted PQT for HBE, 3LPE and coal tar tape field joint coating material.
Conducted qualification test for cross country Pipeline coating applicators
and mainline welders.
Monitored and controlled contractors manpower, equipments and material
availability status.
Inspection performed for Piping internal cleaning, structural
alignment/torque, equipment grouting and fireproofing.
Reported and resolved contractors NCR, SOR and SER.
Involved in frequent HSE & Quality site walk and HSE & Quality
construction auditis.
Performed UG/AG Piping loop mechanical clearance, line history check and
NDT clearance.
Punch List prepared for UG/AG Piping, Structure steel and equipment
works.
Issued and maintained OQA (observation on quality aspects) status for
ethylene cracker plant.
Monitoring piping construction progress of Cracker, HDPE, Polypropylene
and Butane plants.
Attended site HSE tool box talk, quality &progress meeting and maintained
stakeholder interests.
Reviewed / Certified construction (RA Bill) invoices.
3) Germanischer Lloyds (Through Bonace Engineering pvt ltd)
Pipeline Welding Inspector (24&8 Cairn Energy Cross country Pipelines
project-Dec 2008 to Feb 2010)
Reviewed cross country pipelines work method statements, construction
procedures & ITPs.
Inspection performed for API /ASME Grade Pipes as per specification.
Inspection done for 24&8pipeline stringing, mainline welding joints and
Welding tie-ins.
Witnessed Pipeline coating PQT and conducted applicator qualification test.
Carried out pipelines Field joint coatings /Heat shrink sleeve & powercrete
Epoxy coating inspection for 8 & 24 (% Humidity, Surface roughness
Inspection, WFT, DFT, Holiday/Peel off test)respectively.
Carried out coating inspections /Field joint coating for 24HDPE sleeve
welding (PIH) and foam filling (PUF coating),air tightness /pin holes and
hammer test.
Witnessed and reviewed electrode qualification test (EQT), WPS, PQR,
WPQT and Destructive Testing.
Interpreted Radiography films and controlled repair percentage.
Witnessed manual UT (pipes lamination checking at bevel), DPT&MPT test
for surface inspection.
Witnessed pipelines lowering & holiday test, padding, trench profile check,
gap between pipeline and trench wall.
Involved & Witnessed during pipelines Hydro test, Cleaning, Gauging,
Pigging and dewatering works.
Monitored & Inspected pipelines various crossing installations (Railway,
Road, Canal crossing) works.
Carried out inspection for pipelines restoration activity, Marker installation
and CP installations.
Prepared and Rectified construction punch list for all pipelines activities.
Involved during site HSE & Quality audits.
Attended weekly/monthly quality and progress meetings and HSE safety tool
box talk.
Maintained record of daily progress and reported to site inchagre.
4). Reliance Engineering Associates Pvt Ltd
Pipeline QA/QC Engineer (48East West Gas Pipeline Project-Nov 29,
2007 to Nov 29, 2008)
Reviewed pipeline contractors Drawings, construction procedures and ITPs.
Monitored and inspected pipeline, piping & structural fabrication and
installation works.
Supervised teams of Fitters, Welding gangs and subcontractors on the
construction of cross country pipelines and compression station piping works.
Reviewed and witnessed WPS/PQR and conducted NDT & nondestructive
for welding test piece.
Inspected and prepared all incoming Material receiving report (MRR).
Conducted PQT for high build epoxy coating material.
Performed Welder Qualification (WQT) Tests for Pipeline, piping and
structural works.
Reviewed & interpreted Welding NDT-RT, UT, MPT and DPT.
Issued contractors noncompliance against quality i.e. NCR, FOR, SER when
necessary.
Performed daily inspections for pipelines /pipings welding, painting, field
joint coating (Fusion bonded epoxy for UG Piping and 3LP coating for cross
country pipelines), PWHT, PMI, Hardness testing.
Monitored compressor, gas turbine installation and structural erection and
inspection works.
Witnessed hydro/pneumatic testing, flushing, cardboard blasting and pigging
.
Reviewed & certified reports, documents and RA bills.
Conducted quarterly construction quality and HSE audits.
Monitored & maintained daily progress reports & reported to the Head QC.
Coordinated site QC and attended weekly/monthly quality meetings.
5). Ario Brothers, Boroda
Pipeline QA/QC Engineer (10/8City Gas Pipeline Project-Nov
2005 to Nov 28, 2007)
Prepared and reviewed pipelines construction and inspection procedures.
Prepared WPS as per applicable standards/codes and carried PQR test.
Conducted welders qualification test as per standard codes and procedures.
Witnessed Weld Destructive testing and physical/chemical test.
Inspected and report prepared for pipelines material, stringing, welding,
painting, field joint coating (Blasting, Surface roughness, temperature,
WFT/DFT, Peel test, holiday test-inspection).
Supervised, inspected and managed steel, HDPE /MDPE pipelines trenching,
joining and laying work.
Routine Inspection conducted before, during and after welding works as per
approved method statement.
Coordinated with third party inspector during site visits.
Coordinated and interpreted NDT activities such as UT, RT, PT, and MT &
Visual Inspection.
Hands on experience with necessary measuring and test equipment to
perform inspections.
Analyzed Inspection findings & generated inspection reports.
Prepared timely RA-Bill, daily progress Reports and documentations.
Prepared As-built drawings of pipelines network.
Conversant with national and international code, standard and specification
like ASME Sec II,V, IX, ANSI (B3I.8), ANSI (B31.4), ANSI (B31.3), API 1104,
API-5L, AWS D1.1, and ISO Documentation
Coordinated, attended weekly and monthly meetings and QA/QC feedback to
the management.
6). Jijo Fabricators and Erectors, Koperkhairane, Navimumbai
QC Engineer (Piping Spool Fabrication Industry-
Jan 2004 Nov 2005)
Controlled and monitored piping shop fabrication, quality and manpower
allocation.
Inspection conducted for all Incoming materials, pipe /structural steel fit up
works and prepared inspection reports.
Monitored and inspected before, during and after welding to produce sound
welds.
Tested all welders for performance test (WPQT) as per WPS/PQR.
UT and MPT examined for raw materials, butt weld bevels, various
structures & piping as per specification.
Coordinated with third party inspector during witness and visit at
fabrication shop.
Prepared inspection reports and necessary documentations.
7). Sujay Irrigation Pvt Ltd
Supervisor (PVC Pipes Mfg Industry-Nov
2002 to Dec 2003)
Planned and executed daily shop production.
Monitored and controlled Shop floor production activity.
Managed equipment, manpower and raw materials to produce required
output.
Dispatched products as per scheduled time.
Prepared and reviewed relevant documentation required to conduct
inspections.
Regularly conducted lab testing for PVC products: tension test, compression
test, bend test etc.
Prepared Daily progress reports and reported to head.
Personal Profile Passport details
Name : Dinesha M Passport Number : Z3229481
Poojary
Sex : Male Place of Issue : Bangalore
D.O.B. : 22/12/1979 Date of Issue : 06/05/2015
Marital Status : Married Date of Expiry : 05/05/2025
Nationality : Indian
Language Known : Hindi, English,
Kannada
Permanent address : Shri Shaila Nilaya, Manoor, Kotathatu post, Udupi
Tq, Udupi Dist., Karnataka, India.
Pin: 576221
Declaration:-
I hereby declare that the above-mentioned information is correct up to the best of
my knowledge and I take the responsibility for the correctness of the above
mentioned particulars.
Dinesha M Poojary