Twenty-four years of experience in piping design/field liaison Field engineer/field implementation/coordination,/Supervision /Oversight. planning, construction design/liaison representative.. Completed projects of new design composites, retro-fit design, field coordination, system validation, checking, fire protection, isometrics, system walk down, overhaul design, material take-off, component arrangements, pipe supports/spool sheets and piping specification development

Nuclear- Eighteen years experience in piping, civil/structural design modifications/ Planning,Field Engineer Decontamination and Decommission of units, radiological work in hot areas for Security projects, Supported craft in field installations/Resolved design issues as they occurred with field Implementations. Traceability of materials for all safety-related piping and components

Civil Eight years of Wastewater treatment plants. Design of Roadways, Ditches, Site plans, Buildings. Site grading, drain water systems Fences, bollards, hardenpost, planter’s passive-resistive barriers supports for piping and electrical conduits.

Electrical Ten years experience industrial/commercial field.implementated electrical work pages involving electrical duct banks, Responsible for conduit layout and routing design, sizing conduit, conduit matrix. Developed lighting and conduit layouts for commercial and private sector (nuclear). Generated detailed electrical equipment layouts Planned electrical packages.

SUMMARY Nuclear Asset Management Suite/Passport 5 yrs

AS IN PROJECT MANAGEMENT

PDS/Smartplant 5,000 hrs 3 yrs

AutoCAD 31,500 hours

Catia 5 1,500 hours

Microstation 32,500 hrs

Cadpipe 3,000 hours

Propipe 2,500 hours

WORK EXPERIENCE

Sept 2015 To Present

ENTERGY ANO Unit 1

FIELD ENGINEER

MECHANICA/ELECTRICAL PLANNER

Mechanical work planner for Unit 1/Unit2 Common Feedwater NFP-805 project

Develop detailed work plans for “NFP-805” modification packages

Develop and write detailed step by step work packages in “Asset Suites”

Provided construction solutions and work with superintendents to develop craft estimates

Initiate and procure materials to support construction activities

Provided technical engineering support to resolve installation issues to ensure timely completion of field activities

Provided oversight to ensure contractors were using current documents, procedures, drawings, and work instructions. And were complying with the site requirements provided in those documents including field installations.

Feb 2013 To July 2015

WATTS BAR UNIT 2 COMPLETIONS

MECHANICAL/ ELECTRICAL

FIELD ENGINEER

Conducted field walk downs for constructability review before inception

Lead engineering walk downs to validate implementation was carried out as dictated by the design packages.

Provided technical engineering support to resolve installation issues to ensure timely completion of field activities

Developed specifications for procurement of materials for new construction

Co-ordinate work activities with multiple construction and engineering work groups

Outage work as field engineer in containment, control rm spent fuel rm.

Provided oversight to ensure contractors were using current documents, procedures, drawings, and work instructions. And were complying with the site requirements provided in those documents including field installations.

Lead Pre-job briefs

Traceability of materials for all safety-related electrical / piping and components

Sept 2012 To Jan 2013

VC SUMMER NUCLER POWER PLANT

ELECTRICAL/ MECHANICAL/CIVIL

FIELD ENGINEER AP1000 UNITS

Conducted field walk downs for constructability review before inception

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Developed specifications for procurement of materials for new construction

Co-ordinate work activities with multiple construction and engineering work groups

Outage work as field engineer in containment, control rm spent fuel rm.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

Traceability of materials for all safety-related electrical / piping and components.

Supported craft with installation with duct banks, assembly of the modular units to be set in the turbine/aux buildings.

SEPT 2011 To SEPT 2012

FPL TURKEY POINT NUCLER POWER PLANT

ELECTRICAL/ MECHANICAL/CIVIL

FIELD ENGINEER

Conducted field walk downs for constructability review before inception

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Co-ordinate work activities with multiple construction and engineering work groups

Outage work as field engineer in containment, control rm spent fuel rm.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

Traceability of materials for all safety-related piping and components

Installation of duct banks supports for piping and electrical conduits. Excavations for culverts, ditches and roadways.

FEB 2011 to SEPT 2011

EXECLON ENERGY

ELECTRICAL/ MECHANICAL/CIVIL

FIELD ENGINEER

Conducted field walk downs for constructability review before inception

Initiated work instructions utilizing Passport / SharePoint

Security Upgrade Implementations

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Co-ordinate work activities with multiple construction and engineering work groups

Developed specifications for procurement of materials for new construction Installation of duct banks supports for piping and electrical conduits. Excavations for culverts, ditches and roadways.

Installation of new bldg’s

Procured materials and developed clearance orders

Traceability of materials for all safety-related piping and components.

Obtained site permits and co-coordinated acceptance with work groups

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

OCTOBER 2010 to Feb 2011

MONTICELLO XCEL ENERGY

ELECTRICAL, MECHANICAL, CIVIL PLANNER

FIELD ENGINEER

Conducted field walk downs for constructability review before inception

Initiated work instructions utilizing Passport / SharePoint

Security Upgrade Implementations

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Co-ordinate work activities with multiple construction and engineering work groups

Developed specifications for procurement of materials for new construction

Procured materials and developed clearance orders

Communicated with outside vendors

Obtained site permits and co-coordinated acceptance with work groups

Supported craft in field installations/Resolved design issues as they occurred with field

Implementations.

Traceability of materials for all safety-related piping and components

Installation of duct banks supports for piping and electrical conduits. Excavations for culverts, ditches and roadways.

Installation of new bldg’s

AUGUST 2010 to SEPTEMBER 2010

TURKEY POINT NUCLER POWER PLANT

DESIGNER III/ FIELD ENGINEER

Performed field walk-downs to determine the need and depth of work to be implemented

Prepared work orders utilizing Nuclear Asset Management Suite

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations. Traceability of materials for all safety-related piping and components.

JULY 2010 TO AUGUST 2010

FIELD ENGINEER

JA FITZPATRICK- NRC DBT SECURITY PROJECT

ELECTRICAL /CIVIL PLANNER

Co-ordinate project with Operations and Engineering Departments

Performed field walk-downs to determine the need and depth of work to be implemented

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Prepared work orders utilizing Nuclear Asset Management Suite

Supported craft in field installations/Resolved design issues as they occurred with field Implementations. Traceability of materials for all safety-related piping and components..

Installation of duct banks supports for piping and electrical conduits. Excavations for culverts, ditches and roadways.

Installation of new bldg’s

SEPT 2009 to FEB 2010

FIELD ENGINEER

JA FITZPATRICK- NRC DBT SECURITY PROJECT

TECH SPEC/CIVIL/STRUCTURAL DESIGNER

ELECTRICAL DESIGNER/PLANNER

CIVIL/STRUCTURAL DESIGNER

Conducted field walk-down/design layout and detailing of fencing, hardenpost, bollards detailed

rebar,design/detailed Foundations,design/detailed Armory plans, and configuration of buildings.

HVAC systems layout and design of duct work, and equipment for modifications .

ELECTRICAL DESIGNER/ELECTRICAL PLANNER

Field walk-down for electrical project for new Security bldg modifications

Verified and updated conduit cable runs, trays, one –line diagrams,mcc security alarm for fencing. control panel fabrication.

Traceability of materials for all safety-related piping and components.

Co-ordinate project with Operations and Engineering Departments

Performed field walk-downs to determine the need and depth of work to be implemented

Prepared work orders utilizing Nuclear Asset Management Suite

OCT 2008 to JAN 2009

PIPING DESIGNER/FIELD ENGINEER

Huntsman Chemical

Conducted field walk downs and verified all existing piping instrumentation and equipment layouts. Designed new piping layouts for new piping and equipment arrangements; surveyed existing columns and buildings for Elevation information.

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations. Traceability of materials for all safety-related piping and components.

MAY 2008 to OCT 2008

Leave of Absence

MARCH 2008 to May 2008

PIPING DESIGNER/Mech Planner

DOW CORNING

Performed field walk downs verifying equipment, piping, instruments and piping supports. Field coordination, produced complex three dimensional drawings.

Utilized Plant 4-D to route piping and placement of new equipment. Develop flow diagrams and P&IDs; work from concepts, ideas, or rough sketches from field walk downs. Co-ordinate project with Operations and Engineering Departments

Traceability of materials for all safety-related piping and components.

Prepared work orders utilizing Nuclear Asset Management Suite

JANUARY 2008 to March 2008

PDS PIPING DESIGNER

SUNCOR ENERGY

Designed and routed pipe utilizing Smart Plant 3D

Located piping supports and equipment utilizing Smart Plant 3D

Revamped unit per customer specifications, produced complex three dimensional drawings

Back checked drawings per flow diagrams and P&ID’s, specifications

Traceability of materials for all safety-related piping and components.

AUG 2007 to NOV 2007

BETCHEL SRS PLANT

SENIOR PIPING DESIGNER

PDS DESIGNER/CHECKER

Designed general facility piping and instrumentation drawings,

Redlined flow diagram /P&ID’S & Models after cross checking them against each other

Traceability of materials for all safety-related piping and components.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

Decontamination and Decommission of units.

Extracted ISO’S from Model. produced complex three dimensional drawings

Checked equipment layout using equipment modeling for equipment items

PDS/Smartplant software. Systems included HVAC duct work, floor and sanitary drains, breathing air, fire protection and potable water.

JULY 2006 to MAY 2007

SHAW / AREVA MOX PROJECT SRS

SENIOR PIPING DESIGNER

PDS DESIGNER

FIELD ENGINEER

Redlined flow diagrams/P&ID’S & Models after cross checking them against each other

Generated and routed new utility piping in Model and on P&ID’s

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations. Traceability of materials for all safety-related piping and components

Decontamination and Decommission of units.

Checked piping area drawings, included civil, structural and instrumentation elements

Extracted ISO’S from Model. produced complex three dimensional drawings

Checked equipment layout using equipment modeling for equipment items

Designed and checked all building service piping in the BAP/BSR Buildings utilizing PDS/Smartplant software. Systems included HVAC piping, floor and sanitary drains, breathing air, fire protection and potable water

.

FEB 2006 – JUNE 2006

SENIOR PIPING DESIGNER

FIELD ENGINEER

DUKE ENERGY MOX FUEL PROJECT-DOE

Field walk-down/design layout of new flow/p&id system per client spec’s

Developed material review/specification for total system check

Implemented complete design/checking for all building service piping (retro-fit) using micro station V-8.Systems included HVAC piping, floor and sanitary drains, Breathing AIR, fire protection, and potable water, Field coordination.

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages., scheduling work modification projects

Decontamination and Decommission of units.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

JAN 2006-FEB 2006

SENIOR FIELD PIPING DESIGNER/CHECKER

DC COOK POWER PLANT (AEP)-DOE

FIELD ENGINEER

Field walk-down/ design layout of new flow/p&id system per client spec’s

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages., scheduling work modification projects

Field coordination

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

Traceability of materials for all safety-related piping and components.

OCTOBER 2005 –JANUARY 2006

SENIOR PIPING DESIGNER /MECH PLANNER

MWH AMERICAS INC

Designed and checked all building service piping high purity piping and site plans for waste water treatment plants in Iraq. field walk-down/ design layout of new flow/p&id system per client spec’s, detailed specifications.

Traceability of materials for all safety-related piping and components

Utilized PDS/Smartplant to produce complex three dimensional drawings

Co-ordinate project with Operations and Engineering Departments

Field walk-downs to determine the need and depth of work to be implemented

Prepared work orders utilizing Nuclear Asset Management Suite.

Installation of duct banks supports for piping and electrical conduits. Excavations for culverts, ditches and roadways.

Installation of new bldg’s

SEPT 2005-OCT 2005

SENIOR PIPING DESIGNER/MECH PLANNER

DAY & ZIMMERMAN

Design of new piping & steel arrangements, updated existing piping and instrumentation information on existing PID’s, PFD’s.

Traceability of materials for all safety-related piping and components.

Field routed new pipes from tank farm to equipment in new/existing buildings.

Co-ordinate project with Operations and Engineering Departments

Performed field walk-downs to determine the need and depth of work to be implemented

Prepared work orders utilizing Nuclear Asset Management Suite

JULY 05-SEPT 2005

SENIOR FIELD PIPING DESIGNER CYTEC

Field Engineer

Conducted field walk down to verify all existing piping, instrumentation, and equipment. Designed piping layouts for new piping and equipment arrangements, surveyed existing columns and buildings for elevation information.

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages., scheduling work modification projects

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

MAY 2005-JULY 2005

SENIOR PIPING DESIGNER MIDREX

Designof new and existing P&ID’s, PFD’s and Equipment arrangements. Using Pegs system-intelligent drawings. Re-routed piping due to interferences in the field.

JAN 2005-MAY 2005

PIPING DESIGNER/ELEC DESIGNER/ELEC PLANNER CH2MHILL CIVIL PLANNER/FIELD ENGINEER

Design of P&ID’s equipment locations, piping turnout’s, Rerouted existing piping

for new design. Re-routed conduit layout to support power to new piping and turnouts. Placement of fences and design of new access road around the lake. For the Owns Lake Dust Mitigation Project. Revised grading plans. Using PDS.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

Co-ordinate project with Operations and Engineering Departments

Performed field walk-downs to determine the need and depth of work to be implemented

Prepared work orders utilizing Nuclear Asset Management Suite.

Installation of duct banks supports for piping and electrical conduits. Excavations for culverts, ditches and roadways.

Installation of new bldg’s

AUG 2003-JAN 2005

DBT SECURITY PROJECT SOUTHERN CALIFORNIA EDISON. -NRC

TECH SPEC/CIVIL DESIGNER/SENIOR PIPING DESIGNER/FIELD ENGINEER.

Conducted field walk-down/design layout and detailing of fencing, hardenpost, bollards

Planters, Armory plans, k-rail placement and configuration of buildings. Drain water systems.

SENIOR PIPING DESIGNER/ELECTRICAL DESIGNER.

Conducted field walk-down design layout and detailing for of all FeedWater & High Flow Mud Piping System. Traceability of materials for all safety-related piping and components.

Field walk-down for electrical project of North Security Bldg. Field measurement,

Verified and updated conduit cable runs, trays, rec.

Prepared final detailed layout of assembly drawing. Designed final details of electrical and piping safeguard drawings.

Decontamination and Decommission of units.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

Security project civil installations

FEB 2003-MARCH 2003

AVCA & Associates

Microstation Piping Designer/Field Engineer

Conducted field walk-downs for of all terminal and pipe line

piping and instrumentation systems while verifying equipment and safety devices

Redlined and updated P&Ids by field sketches; converted sketches to an isometric system by utilization of Microstation J. Control panel fabrication.

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages., scheduling work modification projects

Checked designs for final design spec’s for piping, civil, and some electrical..

Supported craft in field installations/Resolved design issues as they occurred with field Implementations. Traceability of materials for all safety-related piping and components

JULY 2002-SEPTEMBER 2002

Microstation & AutoCAD Designer

DUKE ENERGY-DOE

FIELD ENGINEER/Civil PLANNER

Design seismetic pipe supports for nuclear power plants

Updated Isometrics drawings for compliance utilizing Microstation J and AutoCAD 2002

Updated piping isometrics

Traceability of materials for all safety-related piping and components

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

Installation of duct banks supports for piping and electrical conduits. Excavations for culverts, ditches and roadways.

Installation of new bldg’S

APRIL 2002-JULY 2002

CENTRY

Microstation & Auto CAD Pipe Designer/Checker

DUKE ENERGY

FIELD ENGINEER

Designed and routed Main Gas Piping from headers to turbine in compressor station. Located ESD stands, designed ditches and roads in site drawings. Located and routed air water, ESD lines through compression and auxiliary building. Located and designed domestic and fuel gas separation design domestic water lines for auxiliary building. Utilized Microstation J, AutoCAD Release 2002 to update drawings to ISO 9000 compliance.

Checked drawings for final design.

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages., scheduling work modification projects

Traceability of materials for all safety-related piping and components

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.

AUGUST 2001- NOVEMBER 2001

Microstation Piping Designer/ Checker

Pharmacia

Verified Piping & Instrumentation system as-built by field walk-downs for hazard analysis while redlining and creating field sketches for changes

Updated Equipment & Safety Device Databases for ISO 9000 compliance

Contacted Vendors for Equipment Information

Designed piping, equipment, site grading (expansion) fences. Buildings, and storm water drainage system Checked drawings for final design

DECEMBER 2000-AUGUST 2001

DuPont Company

Microstation Piping Designer//Field Engineer

Conducted field walk-downs for hazard analysis of all plant piping and instrumentation systems while verifying equipment and safety devices

Redlined and updated P&Ids by field sketches; converted sketches to an isometric system by utilization of Microstation SE for ISO9000 compliance

Supervised\Oversight of craft (mechanical/electrical)for implementation of work packages., scheduling work modification projects

Storm water drainage systems, site grading, design /layout of new piping and equipment.

Supported craft in field installations/Resolved design issues as they occurred with field Implementations.