Resume

Sign in

Project Construction

Location:
Batangas, CALABARZON, Philippines
Salary:
negotiable
Posted:
January 08, 2017

Contact this candidate

ROGELIO C. BUENO

CP # +************

E-mail: acx538@r.postjobfree.com

Sinala, Bauan, Batangas

Position : Piping Supervisor (Fabrication and Site)

PROFESSIONAL SUMMARY:

More than(17) years of experience in Structural and Piping construction from underground to aboveground of oil and gas plant Piping systems, pipelines, pressure vessels, gas compressors, topsides, oil and gas facilities, petrochemical plants and other related industrial facilities during fabrication and erection or installation of different kinds of metal such as carbon steel piping, stainless steel piping, duplex steel piping, copper nickel piping, reinforced thermo resin piping, high density polyethylene piping, low density polyethylene piping etc.. up to pressure testing and Pre Commissioning.

DUTIES AND RESPONSIBILITIES (Piping Supervisor):

Responsible for the HSES, and quality aspects of the work within assigned areas and for ensuring construction contractors complete their work in accordance with the project schedule.

Review and monitor the availability of drawings, specifications, job instruction, material deliveries and tools applicable to the particular discipline and area of work.

Ensure that piping construction contractors working within the discipline adhere strictly to the latest approved for construction (AFC) project drawings, ITP procedure and site instruction.

Responsible for monitoring the discipline and timekeeping of contractors staff and labor in a defined work area, identifying disciplinary action required, and informing the relevant discipline superintendent.

Ensure that all piping contractors, supervision and manpower are instructed in and comply with all aspects of Health, Safety, Environment and Security (HSES) policy, site regulations, permit to work procedures and instructions and client requirements.

Setting up plans for recording of results and documentation. Monitor site condition. Ensure full compliance by all piping staffs and pipefitters regarding the execution of the work in accordance with manufacturer’s recommendations and clients project requirements and specifications.

Confirm the availability of all the materials, tools, equipment and required qualified personnel who carry out the work.

Resolve any technical problems that may arise during the fabrication work. Having the responsibility of all technical queries regarding piping works.

As-built design and proposal of modification. Material take-off and piping schedule. Coordinate among various construction contractor and discipline supervisor executing piping work. Ensure the quantity of the work executed by the construction contractor and monitor the compliance with established schedule.

DUTIES AND RESPONSIBILITIES (Steel Fabrication Supervisor)

Planning and studying of design drawings and materials preparation according to schedule of deliverables packages.

Expediting of materials prior to fabrication to meet the schedule.

Supervised during fabrication to ensure that the design has followed accordingly.

Monitoring of weekly progress report of fabricated items.

Coordinating with other disciplines for any changes /queries arises during stage of fabrication.

Coordinating with quality assurance/quality control regarding welding inspection and pressure test report ‘prior for sand blasting, galvanizing and painting of all fabricated items.

Coordinate with site supervisor for priority items to be deliver on site.

Also responsible for Material take off.

COMPUTER SKILL

Office Software - Microsoft Excel, Ms Word, Office Vision &Ms Power Point

EMPLOYMENT RECORD:

Company: Wasco Energy Pte. Ltd.

Project: ITCHTYS INPEX PROJECT (SINGAPORE AND KOREA)

Position: Piping Supervisor

Inclusive Date: December 3 2014 to May 10 2016

Supervision for skid assembly from main deck to upper deck, lay out of equipment location, installation of 1st stage to 4th stage scrubbers, suction and discharge bottles, installation of 1st to 3rd stage discharge coolers, fabrication and installation of priority lines prior for factory acceptance test (FAT), fabrication and installation of duplex piping S31803 LO line, OG line, FL line PG line, etc.. Ship loose list preparation for RE00014 package compressors LO71 to LO74 project prior for delivery to client site.

Company: SK Engineering and Construction

Project: Jurong Aromatics Complex (JAC) Singapore

Position: Piping Supervisor

Inclusive Date: November 5, 2012 - July 31, 2014

Oversee the installation/fabrication of pipe spool checking on an area basis ensuring the construction contractor meets quality, schedule and safety targets. Ensure that piping mechanical installation HSSE policy and procedure are implemented by contractors. Assist in developing and compilation of construction work packs, ensuring the inclusion of all necessary supporting documentations for safe and efficient execution of the works. Supervise total construction effort to ensure project is Constructed up to Piping Completion in accordance with design includes interfacing with client representatives &other contractors.

Company: SAMSUNG ENGINEERING

Project: Kayan /pp/ph Project- Jerp# 3 Aromatics project (SATORP) Jubail, K.S.A

Position: Piping Supervisor

Inclusive date: March 2008–May 14, 2012

Supervise all piping activities which include planning work preparation, work execution. Ensuring that the subcontractor follow all piping general requirement to avoid and eliminates reworks involve in testing, involve in testing, flushing, drying statement, commissioning work. Attend regular coordination and progress meeting. In charge of interfacing with the Engineering and Construction team, chasing the various material deliverables and ensuring the project progresses as scheduled .Ensure proper change control by issuing Field Instructions for all changes, reviewing Technical Queries to ensure responses are appropriate and practical.

Company: GS DAEWOO ENGINEERING Construction and Consortium

Project: Laffan Refinery Ras laffan, QATAR

Position: Piping Supervisor

Inclusive date: 2006- 2007

Assigned in line checking of test package, reviewing test package including test limit blinding and on line value. Re statement of test system which are completed. Make final inspection with client representative witnessing bolt tightening and make final inspection of spool cleaning, enforce safety rules and regulation. Coordinate with client for closing punch list and acceptance certificate of system.

Company: Al- Suwaidi Industrial Services Co. LTD Yanbu, KSA

Project: Diesel Hydro Treater Project (DHT)

Position: Piping Supervisor

Inclusive date: 2005-2006

Reading and interpreting facility engineering drawings and designs in order to make necessary modifications or recommendations. Preparing piping general arrangement drawings, piping, valve, fittings data sheets, specifications and MTO.

Company: Al- Mojil Group of Company

Project: Jubail KSA, Jubail United Petrochemical Complex (JUPC) SABIC

Position: Piping Supervisor

Inclusive Date: 2003-2004

Reviewing piping test packages, line walking, raised punch list, witness hydro test, witness vessel pressure testing, equipment skid package inspection, reinstatement closed out for test pack, pipe insulation inspection, oil flushing, pipe chemical cleaning, pneumatic/static test activity, monitoring RFI for daily activity, ITR approval & signed-off and MC sub-system completion tri-party line walked, also responsible for the inspection of structural modular piping rack.

Company: Wan-Chi Steel Industrial Co. Taiwan ROC

Project: Formosa Plastic Corp

Position: Piping Supervisor

Inclusive Date: 1999-2001

Execute spooling and weld mapping prior for fabrication. Participate in Mechanical Completion punch listing with construction field personnel, act as focal point for agreed completion status issues. Arrange final Mechanical Completion (MC) walk downs and punch out of system and review final punch.

Company: Han Young Shin Construction Corp. Ltd.

Project: Formosa Plastic Corp. PVC and IEM Site Project

Position: Piping Foreman

Inclusive date : 1997-1998

Assigned in structural fabrication such as build up beams and girders, columns. trusses and different kinds of structural member. Also familiar and well experienced with iron works.

Company: Saudi Shinwa co. LTD Yanbu, KSA,

Project: Luberef 2 Project

Position: Piping Foreman

Inclusive Date: 1996-1997

Company: CCC Company Jubail KSA

Project: Shop Fabrication

Position: Piping Foreman

Inclusive Date: 1995-1996

Company: Engineering Equipment Incorporated, Philippines

Project: San Miguel Corp. Central Azucarera don Pedro (Plant Steel Fabrication)

Position: Structural Foreman

Inclusive Date: 1993-1995

PERSONAL DATA:

Date of Birth: July 11, 1971

Place of Birth: Bauan, Batangas

Sex: Male

Civil Status: Married

Citizenship: Filipino

Height: 5’10”

Weight : 130 lbs

Religion: Roman Catholic

Language Spoken: English and Tagalog

EDUCATIONAL BACKGROUND

Elementary: San Antonio Elementary School

San Antonio, San Pascual, Batangas

1978 – 1984

High School: Saint Theresa’s Academy

Bauan, Batangas

1984 – 1988

College: Pablo Borbon Memorial Institute of Technology (PBMIT)

Batangas City

Bachelor of Science in Mechanical Engineering (BSME)

1988-1993

I hereby certify that the above information are true and correct to the best of my knowledge and belief

ROGELIO C. BUENO

Applicant Signature

;



Contact this candidate