Sixteen years (16) experience in various Engineering Practices such as in the Field of Construction in Oil & Gas Industries, Marine Works & Manufacturing. This includes QA/QC Inspection and Documentation in Quality Control of Marine Works, Painting & Coating works, Insulation, Fireproofing and Raw materials for the Fabrication, Erection, and Installation of various Steel Structures, Piping, Tanks and Pressure Vessels in accordance with the Applicable Codes & Standards. I do also have an experience in Quality Control Inspection of Galvanizing & Painting of Galvanized Sheets for roofing.

EDUCATIONAL BACKGROUND:

1992 – 1997 Bachelor of Science in Industrial Engineering

University of Batangas

Hilltop, Batangas City

1988 – 1992 High School

Dra. Concepcion A. Aguila Memorial College

San Jose, Batangas

1982 – 1988 Elementary

Padre Imo Luna Memorial Elem. School

San Jose, Batangas

Special Skills : Computer Knowledge (excel, word)

Driving Skills

EXPERIENCES:

COMPANY: STFA MARINE CONSTRUCTION / KUWAIT

Date Covered: November 2013 to Present

Position: QA/QC Inspector (Precast, Raw Material, Painting & Coating, Insulation & Fireproofing

Project: KOC Small Boat Harbour Project – Kuwait

Client: Kuwait Oil Company

Responsibilities:

Includes QA/QC Inspection of Raw Materials, Material Submittal, Responsible for submission of Raw Materials for client approval using (MAR) Material Approval Request). Study, evaluate the proposed materials as per technical specification and submit to client for approval if complying to specification. Inspection of Quay Walls and Accropodes Pre-pour and Post pour inspection & painting and Coating inspection intended for Small Boat Harbour for North and South Harbour.

COMPANY: SK ENGINEERING & CONSTRUCTION COMPANY LTD.

Date Covered: July 23, 2008 to June 30, 2013

Position: QA/QC Inspector (Painting and Coating, Insulation, Fireproofing & Raw Materials)

Projects: New Building GC-24 & Booster Station 132 and Rehabilitation of B131,

GC-23, GC-25, & GC-15.

Client: Kuwait Oil Company

QA/QC Inspection and Documentation of the following:

1.Painting and Coating Inspection

a.Tank Fiberglass lining

b.FBE Coating – Fusion Bonded Epoxy Coating

c.FBE Coating – Customized Fusion Bonded Epoxy Coating

d.HBE Coating – High Build Epoxy Coating (Underground Pipe)

e.HBP Coating – High Build Polyurethane Coating using Plural Component Machine (Underground Pipe)

f.Wrapping and Coating application using Polyken Primer and Polyken Tape (Underground Pipe)

g.Heat Shrink Sleeve Application (Underground Pipe)

h.Internal Coating of Pipe – Phenolic Epoxy Coating and Fusion Bonded Epoxy.

i.Color Coding Inspection.

2.Insulation Inspection

a. Raw Material Inspection for Binding Wire, Binding Strap, Mineral Wool, Aluminium Sheet, Sealant and all materials specified in Client Technical Specification.

b. Ensure the items for insulation are Painting inspected & accepted. Coordinate to Electrical department if the items Pipes & Equipment required to install Heat Tracing prior to installation of Mineral Wool.

3. Fireproofing Inspection

a. Raw Material Inspection

b. Check the drawing to verify which location are required for fireproofing

c. Inspection of fireproofing as per specification mentioned in Tech Specs.

4. Raw Material Inspection

a. Check the visual appearance, flatness, & surface condition.

b. Check the dimension, length, width, and thickness.

c. Ensure that the raw materials are conform to the standard and specification.

d. Make NCR report to the materials not conforming to standard and specifications.

COMPANY: ATLANTIC GULF & PACIFIC CO. OF MANILA

Date Covered: July 2005 to April 2008

Position: QA/QC Inspector (Painting and Coating, Insulation)

Project: GORO Nickel Project, Basmate Gold Project & Shell Refinery Piping Modification Project.

Client: INCO Australia Management Pty. Ltd, Leighton Construction Company Australia & Shell Refinery in Tabangao.

Responsibility:

Includes QA/QC inspection and Documentation for Painting and Coating intended for

Goro Nickel Project, Basmate Gold Project and Shell Refinery Piping Modification Project.

Company: ABHASAIN COPE SAUDI ARABIA LTD.

Date Covered: January 2004 to December 2004

Position: QA/QC Inspector (Galvanizing, Raw Materials & Painting)

Project: Supplier, Manufacturer, Sub Contractor of Cable Management Solution

Client: ARAMCO

Responsibility:

Includes QA/QC Inspection and Documentation for all Raw Materials and In-Process inspection. Trace the Non-conformity of raw materials, in-process inspection and finished product inspection. Record all the defects and prepare all the reports, prepare the non-conformance report if found deviation or non-conformance in the standards.

COMPANY: MIESCOR (SIEMENS FIRST GAS POWER PLANT)

Date Covered: November 2002 to November 2003

Position: QA/QC Inspector (Painting and Coating, Insulation)

Project: Sta. Rita Power Plant (Siemens First Gas Power Plant)

Responsibility:

My Responsibility includes QA/QC Inspection and Documentation for Painting and Coating

COMPANY: PUYAT STEEL CORPORATION

Date Covered: October 1998 to September 2002

Position: QA/QC Inspector (CGL- Continuous Galvanizing Line & CCL-Continuous Color Coating Line)

Responsibility:

Includes QA/QC Inspection and Documentation for all Raw Materials and In-process

Inspection in both continuous Galvanizing Line (CGL) & continuous Color Coating Line (CCL). Trace the

non-conformity of raw materials, in-process inspection and finished product inspection. Record all the

Defects and prepare all the reports. Prepare non-conformance report if found deviation or non-

Conformance in the standards.

JOB DESCRIPTIONS:

As Painting & Coating Inspector:

Applicable painting procedure specification is available and displayed the work/Operation Instruction in the working station.

Co-ordinate with Client during inspection of coating.

Check the Compressor, Paint Airless spray machines are in good condition and suitable for job prior to work staff.

Check the Relative Humidity, Surface Temperature, and Maintain record before start blasting & painting application.

Check the calibration of Equipment/Machines/Measuring Instruments.

Check the Surface Profile range and maintain record.

Check the Shelf Life period of paint product and ensure that they are in validity period before start of paint application on work.

Verify Paint Batch Certificates with identification for traceability of paint cans during paint application.

Monitor and Control the Painting Process Technique.

Inspect the Painting System is in compliance with client, project specification and drawing requirement and Applicable Code.

To carry out Dry Film Techniques inspection, to conform the product.

As Insulation Inspector:

Raw Material Inspection for Binding Wire, Binding Strap, Mineral Wool, Aluminum Sheet, Sealant and all materials specified in Client Technical Specification.

Ensure the items for insulation are Painting inspected & accepted. Coordinate to Electrical department if the items Pipes & Equipment required to install Heat Tracing prior to installation of Mineral Wool.

Enforce Safety Standards & ensure quality of job and target completion.

As QC Inspector in CGL-Continuous Galvanizing Line

Conducts the Inspection of the incoming raw materials (Cold Rolled Steel in Coils) and identify the conformance and non-conformance of the delivered coils.

Coordinates with the Raw Material Warehouse regarding the non-conformance in the delivery.

Conduct the visual and dimensional inspection of the Cold Rolled Steel in coils prior to processing.

Makes initial disposition as in cases of non-conformance were found upon opening of the CRC and report it to the QA Engineer.

Conducts Line Inspection during processing and inform the Production Supervisors, Engineer, and Operator for corrective action in cases of non-conformance during the process.

Conduct visual and dimensional inspection of the outgoing finished product both Galvanizing & Finishing Section.

Makes initial disposition on the non-conformances found in the outgoing inspection and ensures the identification of the non-conforming products is maintained and carried out.

Monitors the testing on the physical properties of the finished products such as bend tests etc. In order to ascertain its conformance.

Oversees the accuracy of the segregation of the sheets placed under segregation.

To trace the customer’s complaints reasons and record the required report according to the quality assurance procedures.

To encode Quality Assurance Reports after shift of duties.

Assist the Quality Assurance Engineer in doing any further duties, if required.

As QC Inspector in CCL – Continuous Color Coating Line

Test and initially evaluate the parameters for Degreasing and Pre-treatment Section in the Color Coating Line.

Determine the temperature of the in-process strip in the primer and top coat ovens.

Test the physical properties of finished product and determine its conformity to the given specification.

Coordinates with the production personnel any deviation from the required specification found during test/determination for immediate correction.

Participates in the problem detection in line that affects the quality of the products.

Accomplish the Color Coating Line Quality Inspection Report and Daily Pre-treatment Testing report.

Responsible in safe keeping of all production retained panels within the shift.

Maintain the cleanliness and orderliness on work area.

Report daily to immediate superior of day to day activities.

Comply and adheres to the Quality Policy of the company.

Do other tasks/duties that maybe assigned by the superior from time to time.

As QC Inspector for Raw Materials & Finished Products

1.Inspection of Incoming Raw Materials

Check the visual appearance, flatness, and surface condition.

Check the dimension, length, width, and thickness.

Ensure that the raw materials are conform to the standard and specification.

Make NCR report to the materials not conforming to standard and specifications.

2.Inspection of Hardware

Check the dimensional, length, width, diameter, and thickness.

Ensures that the hardware conforms to the standard and specifications.

Make NCR report to the materials not conform to standard and specifications.

3.Inspection of Galvanized & Painted Materials

Check the delivery note to Material Control Sheets to make sure that the delivered materials are correct.

Check the visual appearance, surface condition, coating adhesions and coating thickness in microns.

Check the coating thickness whether it is conform to the required coating standard and to the customer required coating thickness.

Check the dimensional, length, width, flange width, load depth, connector holes, rung holes etc.

Inform to the Galvanizing SIBADUL/NGF (Galvanizers), if there is any discrepancies regarding the coating thickness and quantity.

Make analysis for the materials that has heavy damage. Trace the possible cause of damage whether it is from raw materials defects, production in process or from raw materials mishandling in galvanizing, or in the yard.

Take corrective actions/preventive measures.

Put yellow tag if materials are approved for shipment.

Make NCR report for the materials not conform to the standard and specifications.

4.Inspection of Finished Product for Shipment

Check the CDS and MCS to ensure that the description and the customer quantity are tallying.

Check the materials description and the quantity and make corrective action if there is any discrepancies.

Check the dimensional and visual appearance of the materials before loading.

Hold the materials that has damage and replace new one.

5.Assist Third Party Inspector during Inspection

Check the shipping in-charge if all the materials for inspection are available in the yard.

Check all the materials subject for inspection, visual, dimensional and quantity.

Prepare all the conformance certificate and their attachment.

Prepare list of materials ready for inspection and send it to the customer.

Prepare Shop Notification and send it to the customer.

Prepare the Pre-dispatched report/dimensional drawings.

Provide two copies of documents to be sent to customers.

6.Documentations

Check the Material Control Sheet if the customer requires any documents.

Prepare all the documents required by customers.

Ex. Certificate of Conformance

Quality Manuals/ Procedures

Dimensional Drawing Product Manuals, Warranty Certificates

As QC Inspector for Raw Materials

Includes QA/QC Inspection of Raw Materials, Material Submittal, Responsible for submission of Raw Materials for client approval using (MAR) Material Approval Request). Study, evaluate the proposed materials as per technical specification and submit to client for approval if complying to specification. Inspection of Quay Walls and Accropodes Pre-pour and Post pour inspection & painting and Coating inspection intended for Small Boat Harbour for North and South Harbour.

Inspection of Incoming Raw Materials for Civil, Architectural, Mechanical Painting & Coating and Marine Works.

PERSONAL BACKGROUND:

Age : 41

Birthday : July 26, 1975

Place of Birth : San Jose, Batangas, Philippines

Civil Status : Married

Nationality : Filipino

Religion : Catholic

Height : 5 ft. 8 inches

Weight : 180 lbs.



Contact this candidate