Sakshi Goyal
C*-** Oxford comforts, kedari nagar Wanowari Pune Maharashtra- 411040
Mob: +91-787*******
Email: acwy51@r.postjobfree.com
Objective: Seeking a position as a Mechanical Engineer in which my level of skills and work ethic in areas of HVAC design, estimation & costing will be best suited in designing sustainable system.
Experience: B.E-Mechanical Engineer with 6+ years of experience in HVAC Design, MEP design services, Project Execution and Team Management.
Neilsoft Ltd, Pune since April 2012 to till date
Entertainment World Developers Ltd, Indore from July 2010 to April 2012
Job Profile Summary:
Designing of complete air-conditioning and proper ventilation system for commercial projects such as malls, hotels & office building etc.
Perform Heat Load Calculation manually based on ASHRAE, ISHRAE and other international codes & standards.
Calculate Heat load in software’s such as Carrier HAP.
Evolve design selection of HVAC equipments.
Design & Preparations of drawings for Ducting layout, Piping Layout, Plant Room Layout, AHU Room Layout, Piping Sizing and Header, schematic for chilled water etc.
Preparation of Design basis report with comparison of various options.
Design & prepare tender document, Floating Enquires/ Tender and obtaining offers from Various Companies. Making comparisons and prepare costing estimation for project.
Coordination with purchase, marketing team for finalization of tender & orders.
Coordination of all services with respect to reflected ceiling plan including, plumbing, fire fighting and electrical.
Coordination with vendors, contractors, Architect, PMC for technical discussion.
Drawing checks as per design standards and coordinates with the client and project team.
To take site decisions/clearances as per site issues to ensure smooth progress of project Site co-ordination with contractors, other consultants, architects etc.
PROJECT WISE DETAILS:
Neilsoft Ltd, Pune
Project Name: Al Rayyan football Stadium, Doha Qatar
Start Date: July 2016, End Date: Till date
Description: Heat load calculation in Carrier HAP software for Stadium.
Tools: Carrier HAP 4.6.9
Project Name: Wright soft -RSU
Start Date: April 2014, End Date: Feb 2015
Description: HVAC design in the software for Production home builder –khov USA
Tools: Wright-Soft HVAC (RSU).
15 days Onsite visit to client location- USA for project initiation, coordination and project work.
Project Name: Pace duct sizing and heat load calculation on Carrier HAP
Start Date: Aug 2013, End Date: March 2014
Description: Heat load calculation in Carrier HAP software for hospital project Kuwait.
Tools: Carrier HAP 4.6.1
Project Name: Bristol UK project
Start Date: May 2013, End Date: July 2013
Description: To calculate carbon emission of building by SAP software.
Tools: NHER PLAN Assessor 5.4.1
Project Name: Wright soft development ( Heat load software)
Start Date: July 2012, End Date: Jan 2013
Description: Quality assurance and technical support
Tools: Wright-Soft HVAC (RSU).
Project Name: Prince Mohammad International Airport at Madinah (Saudi Arabia)
Start Date: May 2012, End Date: July 2012
Description: Energy Modeling & Simulation
Tools: Design Builder, Equest
Entertainment World Developers Ltd, Indore: Work as a HVAC Design Engineer
Project Name: Indore Treasure Market City Pvt. Ltd. Indore
Start Date: Aug 2011, End Date: Apr 2012
Description: Total GLA 26,00,000 sqft, Shopping Mall cum Multiplex with Hotel and office blocks.
Tools & Equipments: 1300 TR X 2Nos. and 675 TR x 02 No. centrifugal Chiller, Primary& Secondary Chilled Water Pumps, Other Ducting, Insulation, Piping, Low Side Works.
Project Name: Bhilai Treasure Bazaar Pvt. Ltd
Start Date: Dec 2010, End Date: July 2011
Description: Total GLA 546402 Sqft, Shopping Mall cum Multiplex with offices
Tools & Equipments: 750 TR X 2 Nos. centrifugal Chiller and 200 TR Screw Chiller, Primary & Secondary Chilled Water Pumps, Other Ducting, Insulation, Piping, Low Side Works
Project Name: Ujjain Treasure Bazaar Pvt. Ltd.
Start Date: Aug 2010, End Date: Dec 2010
Description: Shopping Mall cum Multiplex with Hotel.
Tools & Equipments: Total load – 1100 TR all air cooled condensing type units for individual
Retails and water cooled package units for Cinema.
CERTIFICATION &TRAINING:
Indian Green Building Council Accredited Professional Certified (IGBC AP).
Training attended by Ashrae on Sustainability.
Training attended on Revit Modeling & Wright soft-RSU.
SKILLS:
Software: AutoCAD2010, Carrier HAP 4.6.1, Revit MEP, NHER Plan Assessor, Wright soft HVAC, eQuest, Design builder.
Domain: HVAC standards and codes, ASHARE, ISHRAE, NBC, ECBC, IGBC LEED Rating.
EDUCATIONAL QUALIFICATION:
Degree/Diploma
Board/University
Percent
Year of Passing
B.E. Mechanical
M.I.T.S. Gwalior/R.G.P.V Bhopal
75.32%
2010
Intermediate
Miss Hill Gwalior/M.P. Board Bhopal
77.5%
2006
High School
N.C.H.S Gwalior/M.P. Board Bhopal
77.4%
2004
PERSONAL PROFILE:
Name: Sakshi Goyal
Sex: Female
Date of Birth: 14th May 1988
Nationality: Indian
Marital Status: Married
Present Address: C6-21 Oxford comforts, kedari nagar Wanowari Pune Maharashtra- 411040
Permanent Address: Kashi Naresh ki gali, Kila gate,
Madhya Pradesh (M.P.), Gwalior-474003
Visa details: Valid US Business visa till May 2024