Resume

Sign in

Manager Engineer

Location:
The Colony, Texas, United States
Posted:
October 05, 2016

Contact this candidate

Resume:

Project Controls Manager

Sr. Scheduler

David G. Anthony

**** *** **** *****

The Colony, Texas 75056

Cell: 214-***-****

E-mail: acww8e@r.postjobfree.com

Personal data

Marital Status: Married 30 Years

Training and Certifications

Primavera DOS, P3, P3ec, P5 and P6v.7, P6v,8.2 Primavera Scheduling

Primavera PertMaster Risk Analysis

SaPro Analysis Software for Primavera

EVMS in P6

Primavera Expedition

Microsoft Office (Excel, Word, Power Point, Access)

Oracle

U.S. Army Corps of Engineers C.Q.C.

U.S. Army Corps of Engineers RMS / CFMS

Department of Defense Security Clearance

RMS

EVMS

OSHA 10

E.E.O.C.

Project Management

Project Controls (Project Engineer)

CMIS (Construction Management Information System) Cost Control)

QIS ( Quantity Information System)

S.W.P.P.P.

40 Hr. Hazardous Material Training

12 Hr. UST Removal Training

Currently Training for PSP Certification

Work Experience

Austin Bridge and Road

Project Controls Manager/Sr.Scheduler

2015 to current

Primoris/James Construction Group

Project Controls Manager

2015

Lamb-Star Engineering

March 2014-Sept 2014

Project Controls Manager

BOWMAN ENGINEERING and CONSULTING

2011 – April 2013

Sr.Scheduler

Various tasks in the DFW area

Develop proposal schedule for the $1.3b 35E Expansion

On-Site Construction verification – FT. HOOD, Tx.

PBS & J / ATKINS

2006 – 2011

Various NTTA Projects in the DFW area 2008 to 2011 all Toll Road Projects:

PGBT EE Section 28 – Sr. Scheduler

PGBT EE Section 29 – Sr. Scheduler

PGBT EE Section 30 – Sr. Scheduler

PGBT EE Section 31 – Sr. Scheduler

PGBT EE Section 32

Lake Lewisville Toll Bridge

Las Colinas Wall ReConstruction

SRT Seg 4 (Retaining Wall Engineer)

SRT Seg 5 (Retaining Wall Engineer)

All of these efforts for the NTTA

Cost Estimating and Scheduling support

USACE – Hurricane Protection and Restoration Office

New Orleans, La. 2006 - 2009

P3Ec – P5 and P6 Scheduling/Risk Analysis

Construction Planning

Planning and Construction Consultant

Sr. Scheduler

Performed scheduling and analysis from design to construction including Environmental and Land Acquisitions for 321 Projects for the HPO.

Worked with the USACE Cost Engineering Team to cost and resource load all schedules in order to perform a Risk Analysis for the entire program in New Orleans. The final estimated cost number was $14.7 b, in which was taken to and approved by Congress for the entire program.

Big Creek Construction

2005-2006

S.H. 6 Loop 340 Waco, Texas (8 Miles of reconstruction including 6 Bridge Structures, MSE Walls, underground drainage and paving.

F.M. 1695 Hewitt, Texas (7 miles of new road construction including Bridge Structures, MSE Walls, underground drainage and paving.

F.M. 56 Valley Mills, Texas (5 miles of road widening and construction of a new Bridge Structure over the Bosque River.

Waco, Texas

Project Manager

Eagle Construction and Environmental Services

2004

Estimating and Project Management over various environmental projects.

Fort Worth, Texas

Project Manager

Kirkland Construction

2004

Excavation of upper slopes and construction of retaining walls in the Mesa Verde National Park.

Rye, Colorado

Project Manager

H.B. Zachry Co. – Zachry Construction Corporation, San Antonio, Texas

1981 – 2004

2002-2004 – TxDot - J.F.K. Causeway (Civil Group)

Construction of the new Causeway consisting of elevating the roadway from the mainland to North Padre Island, including 2 (2800 l.f. Bridge Structures, 5700 l.f. of 9” concrete sheet pile walls driven 30’ into the existing waterways and 197,000 s.f. of M.S.E. walls. This project was constructed under a U.S. Army Corp of Engineer 404 Permit.

Corpus Christi, Texas

Project Engineer/Project Controls Manager

2001-2002 – TxDot – Bexar County Loop 1604 (Civil Group)

San Antonio, Texas

Project Engineer/Project Controls Manager

1999-2002 – TxDot – Bexar County F.M. 2696 Blanco Rd. (Civil Group)

San Antonio, Texas

Project Engineer/Project Controls Manager

1998-1999 – TxDot – F.M. 730 (Civil Group)

Azle, Texas

Project Engineer/Project Controls Manager

1998-1998 – ZCC North Texas Estimating Department (Civil Group)

Grand Prairie, Texas

1997-1998 – TxDot – Marsh Lane – Denton County

Dallas, Texas

Project Manager/Project Engineer/Project Controls Manager

1996-1997- U.S. Army Corps of Engineers (Heavy Division)

Replace gates at the existing discharge structure on Lewisville Lake.

Lewisville, Texas

Project Manager/Project Engineer/Project Controls Manager

1995-1997 – Upper Trinity Regional Water District (Heavy Division)

Construct new pump station on Lewisville Lake.

Lewisville, Texas

Project Manager/Project Engineer/Project Controls Manager

1994-1995 – Texas Utilities Big Brown Power Plant (Power Division)

Constructed new Baghouses to reduce the opacity levels.

Fairfield, Texas

Field Engineer/Subcontract Coordinator/Plant Unit Start-Up/Project Controls

1992-1994 – Florida Power and Light Power Plant (Power Division)

Indiantown, Florida

Field Engineer/Subcontract Coordinator/Plant Unit Start-Up/Project Controls

1988-1992 – J.K. Spruce Unit #5 – City Public Service (Power Division)

San Antonio, Texas

Field Engineer/Construction Improvement Advisor

1987-1988 – U.S.A.A. Complex, 500,000 sq.ft. Addition and Training Complex (Building Division)

San Antonio, Texas

Field Engineer/Construction Improvement Advisor/Subcontract Coordinator

1986-1987 – Texas A&M University Alumni Building (Building Division)

College Station, Texas

Field Engineer/Construction Improvement Advisor/Subcontract Coordinator

1986-1987 - Texas A&M University Engineering and Lab Complex (Building Division)

College Station, Texas

Field Engineer/Construction Improvement Advisor/Subcontract Coordinator

1984-1986 – Waller Creek Plaza Hotel and Office Complex (Building Division)

Austin, Texas

Journeyman Carpenter/Field Engineer/Subcontract Coordinator)

1982-1984 – Exxon Chemical Plant (Chemical Division)

Baytown, Texas

Journeyman Carpenter/Field Engineer

1981-1982 – Arco Chemical Plant (Chemical Division)

Channelview, Texas



Contact this candidate