RESUME
N. KANNAN
S/O S.Nithyanantham,
Blk *** #03-82 Juronh west st 81
Singapore 640810
E-mail: acwvra@r.postjobfree.com
Mobile No. - +658*******
OBJECTIVE:
To build my carrier in a progressive organization this will provide me Exiting opportunities to develop my skills, as well for the growth of organization.
SUMMARY OF SKILLS AND EXPERIENCE;
1.5 years experience in Auto Spare parts production industry and 7.5 years marine industries.
EXPERIENCES
MARCH 2016 to till
Name of the Organization : SAKTHI MARINE PTE LTD (SUB CON)
UNDER SEMBCORP MARINE ( JSL )
Period : MARCH TO TILL
Designation : PIPING ENGINEER (PRODUCTION) / PRODUCTION INCHARGE
PIPING DPT IN NEW SHIP BUILDING
(STEEL PIPING )
February 2014 to August 2015
Name of the Organization : SCANTECH MARINE PTE LTD (SUB CON)
UNDER SEMBCORP MARINE ( JSL )
52, TUAS CRESCENT
SINGAPORE 638731
Period : FEB 2014 to AUG 2015
Designation : PIPING ENGINEER (PRODUCTION) / PRODUCTION INCHARGE
PIPING DPT IN NEW SHIP BUILDING
(STEEL PIPING AND FRP PIPING)
JANUARY 2013 to JANUARY 2014
Name of the Organization : STELS ED MARINE PTE LTD (SUB CON)
UNDER SEMBAWANG SHIPYARD 7030 ANG MO KIO AVE 5,
#08-68 NORTHSTAR@AMK
SINGAPORE 569880
Period : JAN 2013 to JAN 2014
Designation : PIPING ENGINEER (PRODUCTION) /
PRODUCTION INCHARGE
PIPING DPT IN REPAIR VESSELS
December 2007 to September 2012
Name of the Organization : UMIST MARINE ENGG PTE LTD
UNDER JURONG SHIPYARD
21, Jalan Buroh,
#02-01G, Logistics 21,
SINGAPORE 619478
Period : DEC 2007 to SEP 2012
Designation : PIPING ENGINEER (PRODUCTION) /
PROJECT SAFTEY SUPERVISOR
PIPING DPT IN NEW SHIP BUILDING
(PETRO RIG, PETRO JACK & ATWOOD PROJECTS)
SUMMARY OF MY PROJECT IN SINGAPORE
1. PETRO JACK – IV (Jack Up) 25-01-2008 TO 20-12-2008 TOTAL WORK SCOPE
DIA -11052 DIA INCHS
2. PETRO RIG – I (Semi Submersible Drilling Rig) -10-03-2008 TO 15-02-2009 TOTAL WORK SCOPE DIA INCHS -18256 DIA INCHS
3. PETRO RIG - III -25-10-2008 TO 24-06-2009 TOTAL WORK SCOPE
DIA INCHS -8256 DIA INCHS
4. ATWOOD – 10 (Semi Submersible Drilling Rig) - 06-02-2009 TO 19-12-2010 TOTAL WORK SCOPE DIA INCHS – 13562 DIA INCHS
5. PETROBROS – 62 FPSO 28-03-2011 TO 30-08-2011 TOTAL WORK SCOPE
DIA INCHS – 6000 DIA INCHS
6. ATWOOD – 11 (Semi Submersible Drilling Rig) 02-08-2010 TO 30-03-2012 TOTAL WORK SCOPE DIA INCHS -10500 DIA INCHS HIGH PRESSURE AND LOW PRESSURE
7. WEST TUCANA & WEST CASTOR (Jack Up) 15-03-2012 TO TILL TOTAL WORK SCOPE DIA INCHS – (W/T 7200 & W/C 11000) HIGH PRESSURE AND LOW PRESSURE
8.WEST RIGEL FEB 2014 to MAY 2015 ( with FIBER GLASS PIPES )
9.GUNA TEN MODEC PROJECT (FPSO) MAY 2015 to 31th Aug ( with FIBER GLASS PIPES )
RESPONSIBILITY:
Preparation of piping drawings
Preparation of Dia inches calculation for cost estimation
Production planning for system commissioning & compartment painting schedule
Responsible for Material Take Off (MTO) and follow up
Distribution of manpower to individual jobs
Prepare job card for each and every person ( fitter/welder/grinder/helpers/lifter )
Control man hours for individual jobs as per quotation
Preparation of welding joint number for welding traceability
Preparation for fit up inspection form for owner inspection ( Q/A )
Monitor the welding procedure specification at worksite for individual jobs
Preparation for welding inspection form for owner inspection ( Q/A )
Preparation for NDT plan for owner requirements ( Q/A )
Supervision of QC, group leaders, welders in charge and lifters
Supervision of safety factors at work places
Identification of risk on workplaces
Monitor the safe practice at worksite
Preparation of weekly & monthly piping progress report to project manager
Carry out daily reporting and monitoring at site progress
June 2006 to November 2007
Name of the Organization : SUNDARAM BRAKE LINING LIMITED
TSK Puram, TSK Plant,
Mustakuruchi Po., Kanjamanaickenpatty (Via.)
Kariyapatty Taluk, Virudhunagar – 626 106
Tamilnadu, India.
Period : June 2006 to Nov 2007.
Designation : Final Inspector. (First six month)
(Apprenticeship Training),
June 2006 to Nov 2006
: Cell team leader in production dep’t
(Nov 2006 to Nov 2007)
RESPONSIBILITY:
TO Get production as per job card
To check and operate the machine
To check the work piece dimensions
SEQUENCE OF WORK:
To Set the machine for given drawing.
To operate the chamfering machine.
To operate the Grooving machine.
To operate the surface grinding machine.
To operate the Rivet Spinning machine.
To Check the problem in the finished work piece
(Problems: Segregation, Chipping, Dent, etc.)
QUALIFICATION: TECHNICAL:
1. DIPLOMA MECHANICAL ENGINEERING
68% of April 2005.
RAMU SEETA Polytechnic College,
Kariyapatty Po., virudunagar
Tamilnadu, India.
2. Diesel Mechanic
2001-2002
U.Y.P.A ITI
MADURAI 625 006
3. AutoCAD 2000
“75%” - Oct 2005,
CSC Computer Education
Madurai, Tamilnadu, India.
4. CNC PROGRAMMING AND MACHINE TRAINING
(Turning & Milling)
December 2005,
Tamil Nadu Polytechnic
Madurai Tamilnadu, India.
5. PDMS (Plant Design Management System)
Kagira Drawing Solution (OCT – 2015 - DEC – 2015)
No: 21A, First Floor, Ramalinga Nagar,
OMR, Near SRP Tools,
Kottivakkam, Chennai, Tamil Nadu 600041
QUALIFICATION: ACADAMIC:
1. S.S.L.C
51%, April-2001,
State board of Secondary Education,
Tamilnadu, India.
PERSONAL DETAILS
Name : N. KANNAN
Father’s name : S. NITHYANATHAM
Date of Birth : 30.03.1985
Nationality : Indian
Sex : Male
Marital Status : Single
Languages Known : Tamil, English & Telugu
S Pass no : 0 34107416
Fin No : G8170967Q
PASSPORT DETAILS
Passport No : M 0320167
Date of Issue : 01/08/2014
Date of Expiry : 31/07/2024
Place of Issue : SINGAPORE
DECLARATION:
I here by declare that all statements made above are true, correct and completed to the best of my knowledge and brief.
Place: INDIA. Yours Sincerely,
Date :
(N. KANNAN)