Resume

Sign in

Project Engineer

Location:
Special Capital Region of Jakarta, Indonesia
Salary:
USD 5009
Posted:
October 22, 2016

Contact this candidate

Personal Information

Nationality : Indonesia

Location: City, Country : Bengkong indah II Block N#03

Lubuk Baja,Batam – Indonesia

Marital Status : Married

Age : 34 Years

Contact No. : (+62)813 –72347359

Email : acw6mo@r.postjobfree.com

Passport No : R 295960 (Dec 13rd,2012)

Qualifications

-Visual Welding Inspector (CSWIP 3.0)

-Conducted By The Welding Institute (TWI), 2010

Cert. No: 11874/2

-Welding Inspector (CSWIP 3.1)

Conducted By The Welding Institute (TWI) 2012

Attendance No. 03/D73/BTM/164

-Magnetic Particle and Penetrant Test Inspection (ASNT)

Conducted By Multi Spec Sinergindo (MSS) 2013

Cert. No: 1149 / PT / N / 14

Cert. No: 1277 / MT / N / 14

-Painting and Coating Inspector

-Conducted by Indonesian Corrosion Association (INDOCOR) 2010

Cert. No: 109/IC.I/I-60/II/2008 (Ref.ASTM D-3276)

Shop Inspection In-House Qualification:

-Confined Space Entry and Permit to Work Course

Conducted by Industrialindo Konsultrain Services (IKS) 2007

Cert. No: PTW.10343/IKS/07

-Safety Training Observation Program (STOP)

Conducted By PT. McDermott Indonesia (PTMI) (in house training) 2003

-Continuous Improvement System, PTMI (in house training)

Conducted By PT. McDermott Indonesia (PTMI) (in house training) 2003

Languages: English

Summary Experience

Having over than 14 (fourteen) years’ experience as QA/QC Welding Inspector in oil and Gas construction. Experiences in Site Inspection Fabrication Construction since 2002. Familiar with Code and Standard such ASME Boiler & Pressure Vessel Code, ASME B31 Series, AWS D1.1, API 1104, ASTM and other relating drawings and all equipment associated with welding fabrication. Able to work as a teamwork. Primary function of the job performs the site inspection and follow up activities of field testing of the welding and fabrication activity. Follows up the quality control measures applicable to welding as per job requirements. Witnesses the preparatory activities for the welders qualification tests and Welding Procedures.

Work Experience

PT. Global Process System (GPS) – Batam Island - Indonesia / – Piping Field Engineer 10-2015 to 08-2016

-Jangkrik Complex FPU – MEG Recovery Unit.

-Seawater Coarse Filter Package for Bergading Project.

-Gas Dehydration Package, Oduptu Stage 2

Main responsibilities-

Monitored all piping instalation and modification work carried in facility

Prepared progres report for project and mentioned all modification work.

Determined test packs for process and ensured its compiance with piping flow diagram.

Performed test on hydraulic and pneumatic system and in accordance to international standards.

Provided technical guidance and assistance to senior engineer

Inspected all piping system project and ensured quality and conformance to set standards and specification

Coordinated with design engineering team and resolved issues on the field

Liaised with the vendors and subcontractors and ensured prompt delivery of raw materials

Checkout piping instalation, repair, and maintenance of various sites

Identified risk in instalation process as well as performed review of hazardous material.

PT. Global Process System (GPS) – Batam Island - Indonesia / – Lead Piping Inspector 07-2014 to 10-2015

-Apache Varanus Island Project – VICP Compressor Module fabrication Unit.

-MODEC - T.E.N. Development Project – LP Gas Compressor Packages.

Main responsibilities-

Monitor all wading activâtes modification additional work on piping scopes, monitor All NDT activistes. Prepared and maintain all documents related to QC final MDR (Fit-up, Visual, NDT Reports, and welding traceability’s). Witness pre-com activities such as line walk, flushing, testing, drying and final reinstatements. Prepared partial Test Packages on all modified lines for re-testing (include test limit, Injection point, highest Point, vent and drain) Listing all material and equipment for testing, ensure all completions. Tests reinstatements and final inspections are carried out, verified and documented. Monitor the fabrication and installation works and assist in validation of measurements, progress reporting and completion of scope of work, change order and punch list items. As Built for Piping and Instruments Diagrams (P&ID) Drawings. Monitor All Insulation Installation activities and to ensure The Insulation comply with requirements and project specification

PT. Global Process System (GPS) – Batam Island - Indonesia / – QC Coordinator 03-2012 to 03-2014

-Petrofac E & C SDN BHD - Refurbishment, Life Extension and Upgrading of the West Desaru MOPU (Water Injection Package)

-LAMSON - FPSO Topside Project - Topside Process Modules for Thang Long and Dong Do FPSO. (P.T.S.C – Batam)

-Gas Lift Pressure Upgrading Project - Cairn Energy Ravva Field Development Cairn India limited

-Shell Malampaya Phase 3 Project - (Fuel Gas Conditioning Skid Package)

-CIEP Stage 1 Santos Project - (Inlet Separator Packaged)

-Bumi Armada Berhad Project - (Produced Water Treatment Packaged Skid)

-Chevron Bibiyana Project (Fuel Gas Skid Project)

-Shell Serawak Milikai Project (Fuel Gas System Packaged)

Main responsibilities-

Report to Project QC Manager. Carried out inspection activities (material, welding, insulation, heat tracing and mechanical cleaning and also hot oil flushing) for both structure and piping as per approved Inspection test plan and approved project procedures. Familiar with project specifications requirements. Coordinating with weld map maker with regard to provide weld maps. Liaising and coordinating with construction department and project engineer. Liaising and Coordinating with Client and third party. Ensure all NDT clearance for both structure and piping are cleared in a timely manner. Prepared welding and material traceability records and coordinating with QA / QC documentation for QA / QC Packages / Dossiers. Coordinating with QA / QC documentation in preparation of final MDR for structure. Carried out pre-com activities such as: carried line check, raise punch list, witness the flushing, testing activities (leak/pneumatic /hydrostatic test),drying and reinstatement, Prepared test package dossier (piping pre-com dossier) to submit to mechanical completion team.

WASCO Energy Engineering Indonesia – Batam Island - Indonesia / – Senior QC Inspector 12-2011 to 03-2012

-PNG LNG CHIYODA - JGC JOINT VENTURE Project 11 Modules E-House (SIEMENS – Batam)

Main responsibilities-

Supervises the Quality Control functions/activities of a project, including Quality Control inspection. Supervises inspections, reports and the documentation issued by inspectors and collect and file the required Quality Records. Evaluates the qualifications of welders and NDT technicians. Evaluates the qualifications of QC Inspector. Ensures / make sure the correct application of Quality Control phase (step by step Quality Control Inspection). Arranges in coordination with Project Quality Engineer (PQE) and site personnel procedures, manuals and reports. Be sure that all sites activities are carried out according to reference documentation. Make sure / Check the completeness the standard / code requirements. Manages collaboration of measurement instruments and related certifications. Make sure personnel aware of about Quality Inspection

PT Heat Exchangers Indonesia – Batam Island - Indonesia / – QC Inspector 05-2011 to 11-2011

-Fuel Gas Static Cooler SOUTH MAHAKAM FIELD DEVELOPMENT PROJECT PHASE 1 & 2, EPSCI

-Air Receiver Tank INDIGO PROJECT

-Projected Gas Compressor Discharge Coolers SOUTH SUMATRA NGL

-Gas-Gas Exchanger SUBAN BYPASS LINE PROJECT

-De-Etherizer Re boiler SOUTH SUMATRA NGL PROJECT

-Reels And Cradles FLEXIBLE PIPE MANUFACTURING PLANT TANJUNG LANGSATPROJECT

-NGHU Splitter Oh Air Condenser GHU TECHNOLOGY REVAMP PROJECT

-1 St Stage HCS Compressor Inter Cooler GLADSTONE LNG UPSTREAM

-Sweetwater Flash Condenser PROPYLENE GLYCOLPROJECT

-Detractor Vessel BSP CAHAMPION 7 PROJECT

Main responsibilities-

Monitor all Preparation / Pre-Fabrication by check bevel preparations are as per detail drawing, visual check for edge lamination, check heat number are properly transferred prior to cut. Running Test Welding Procedure Specification.Inspection visual welding prior executes NDT. Prepare Document Control Sheet Welding. Review Non Destructive Examination Procedure. Final Inspection/ Dimensional check. Witness and Record Pneumatic and Hydrostatic Test. Check Fin Tube and perform testing such as Thermal Bonding Test and Pull off test. Perform Running Test of (ACHE) Air Cooler Heat Exchangers, ensure correct setting of fan Blade Angles, Fan Tip Clearances, Fan Speed and monitoring checks to be carried out prior and during the test running of the Fan Air Cooled Heat exchangers. (The test consists of: Function Test, RPM, Noise Level, Vibration and Air Flow). Check percent expand at Tube for Shell and Tube Heat Exchanger and Air Cooled Heat Exchangers. Update Welder performance and Control Document Check Overlay Welding strip, Prepare Manufacturer Data Report (MDR).

PT. Global Process System (GPS) – Batam Island - Indonesia / – Piping Inspector 05-2010 to 03-2011

-Bluewater Field Development Project (Bluewater Energy Services BV – Batam)

-Dragon Tortoise Gas Utilization Project (Petrovietnam Southeast Gas Project Management Board – Batam) 11 module,

Main responsibilities-

Verification of isometric dawning with respect to P&ID. Reviewing the approved quality plans, manuals and scope of work to perform the required inspection. Witnessing the hydro testing of the pipe lines, prepare hydro test packages, line check and punch listing. Control of non conformities issuance of punch list. Coordinating with client/consultants while the inspection is being carried out and offer any clarification is required. Witnessing of pneumatic test, hydro-test, and flushing; system lay-up both in and in erection field. Preparing and maintaining various QA/QC documents and final test packages. Witness of alignment, orientation and dimensions of installed piping. Assures that all joints are exposed for examination during pressure test. Ensuring vents are open when filling and draining lines. Conform repairs, re-testing and re-inspection in accordance with specifications. Making a re-instatement punch list and clearing the items. Witnessing of Flange joint assembly and bolt torque. Ensure the blinds are removed and correct rating gaskets are installed. Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the latest drawing for construction, codes and specification standards. Prepared documents, procedures for inspection method,inspection and testing plan in computerized environment. Clearing of MCC (Mechanical completion certificate items

PT.OCEANEERING Batam Island - Indonesia / – QC Inspector Structure 10-2009 to 01-2010

-Marina Coastal Expressway Project – 36 unit tubular Pipe spiral welded.

Main responsibilities-

Check Dimensional, Check Fit-Up Condition, Visual Inspection and dimension check of completed weld against Spec, requirement and drawing. Ensure all NDT clearance. To prepare Inspection & Dimensional Report. And Reporting to QA/QC documentation in preparation final MDR for structure.

PT. Global Process System (GPS) – Batam Island - Indonesia / – QC Inspector Structurel 05-2009 to 08-2009

-RGP 5 – Harriet Point Berths G & H (McCONNELL DOWELL)

-Dolphin Template A & B, WHARF PILING SYSTEM

Main responsibilities-

Material Traceability Record. Review Dimensional Check Report

Check Fit-Up Condition. Ensure all NDT clearance for both structure and are cleared in a timely manner. Coordinating with QA/QC documentation in preparation of final MDR for structure

PT. Global Process System (GPS) – Batam Island - Indonesia / QC Inspector Structure and Piping 09-2007 to 01-2009

-SPCC Operating Company. SDN. – Mopu Project

-Murphy Oil. Modification Module.

-COOGE – FPSO 13 Process Modules – Montara Field Development Australia.

Main responsibilities-

Report to QA / QC Project Coordinator. Carried out inspection activities (material, welding, insulation for both structure and piping as per approved Inspection test plan and approved project procedures. Familiar with project specifications requirements. Coordinating with weld map maker with regard to provide weld maps. Liaising and coordinating with construction department and project engineer. Liaising and Coordinating with Client and third party. Ensure all NDT clearance for both structure and piping are cleared in a timely manner. Prepared welding and material traceability records and coordinating with QA / QC documentation for QA / QC Packages / Dossiers. Coordinating with QA / QC documentation in preparation of final MDR for structure. Carried out pre-com activities such as: carried line check, raise punch list, witness the flushing, testing activities (leak/pneumatic /hydrostatic test),drying and reinstatement, Prepared test package dossier (piping pre-com dossier) to submit to mechanical completion team.

PT. McDermott Indonesia – Batam Island - Indonesia / QC Inspector Structure 11-2005 to 08-2007

-Saipem - PRP – Erawan Pipeline Offshore Platform System

-Keppel/Fels – Pontoon Project

-Bunga Tulip A – Development Project

-Camau Project (Alpha Stinger)

-PTTEP – Arthit Field Development Central Facilities - CPP

-TNS – Arthit Field Development Central Facilities - Jacket

-ConocoPhillips – Kerisi Central Proccessing Platform

-Woodside/Foster Wheeler – NWS LNG Phase V Expansion (Structure)

-Alpha-2006 Stinger Project – PTMI Batam Marine Base

-Woodside Energy LDT Angel Gas Project – PTMI Batam Marine Base

-Su Tu Vang Project – Cuu Long JOC - CPP

-ConocoPhillips – North Belut CPP

Main responsibilities-

Application of the Requirements of codes and standards covering correctness of parents material, welding consumable, dimensional, fit-up and weld preparation including any preheat. Visual Inspection and dimension check of completed weld against spec, requirement and drawing. Surveillance during welding to verify compliance with procedure. To prepare of inspection Report. Monitoring of NDT result.

PT.PALMA Progress Shipyard /Tanjung Uncang – Batam Island – Indonesia / QC Inspector Structural 03-2004 to 10-2005

-Ship Build Class: NK, GL, & BKI

Main responsibilities-

Handling In progress inspection of structural both ship & erection including material traceability. Handling welding inspection Fit-Up Visual Inspection.Check NDT Requirement and report of the assigned project. Witness and verify all testing. Ensure all NDT carried out as per specification and costumer requirement. Liability with Client and all Quality matters.

PT. McDermott Indonesia – Batam Island - Indonesia / QC Inspector Structure 01-2002 to 01-2004

-Unocal Thailand North Development Project.

-Bayu Undan Gas recycles Project CUQ & DPP Jacket Petroleum Australia.

-BP ARCO Platform Module KKA, JJA, ESRA, BZNA, & Modification.

-Dominion Spar Hull Devil Tower Project Mexico.

-Rang Dong Field Development Project JVPC NULQ, NCWI Platform & Jacket.

-Conoco Phillips Belanak Platform Jacket A & B.

-Conoco Phillips Belanak FPSO Flexible and subsea cable 14 Module.

Main responsibilities-

Application of the Requirements of codes and standards covering correctness of parents material, welding consumable, dimensional, fit-up and weld preparation including any preheat. Visual Inspection and dimension check of completed weld against spec, requirement and drawing. Surveillance during welding to verify compliance with procedure. To prepare of inspection Report. Monitoring of NDT result.



Contact this candidate