Resume

Sign in

Engineer Electrical

Location:
Cairo, Cairo Governorate, Egypt
Posted:
October 22, 2016

Contact this candidate

Personal information:

*.Date of Birth: */**/***3

2.Place of Birth: Helwan

3.Nationality: Egyptian.

4.Address: 34 a Rostom St-Cairo-Helwan.

5.Marital status: Married.

6.Military service: Exempted.

7.Tel: +2-25540377

8.Cell Phone: +2-010********.

9.Email: acw6i5@r.postjobfree.com

10. Driving license: Available

Objectives:

Obtaining a better level career in electric power & Machines Field, Hoping this will fully utilize my academic background, and further develop my technical skills.

Education:

1.First University Degree: B.SC.Engineering

2.University: Cairo University

3.Faculty: Engineering

4.Major: Electrical Power & Machines

5.Graduation Project: Operation & control of gas turbine.

6.Graduation Project Degree: Excellent

7.Graduation year: May 2006

8.Grade Degree: Good

9.Last year Degree: Very Good ( 79.67 % )

10.High School Degree: Thanawia

11.High School Name: Holly Family School

12.Grade Degree: 98.6 %

Job Experience:

Current Job:

SUEZ CEMENT COMPANY ( Tourah Cement plant 2) one of ITALCEMENTI GROUP

as Electrical maintenance Section Head from 01-2011 till now.

Responsibilities:

*Safety first is my priority.

-Safety inspection reports, Near miss reports, unsafe condition reports, Safety talks reports, I-take 5 reports, corrective action reports and action plan reports.

-Regular safe work permits, Work at height permits, hot work permits, Confined space work permits and Lock out/tag out procedures (as I'm loto responsible and job crew leader).

-Following up and responding to PM department reports and recommendations by corrective actions and action plans.

*Electrical workshop Section Head (From 1/2014 till now) with the following responsibilities:

-LV/MV Motors maintenance (Mechanically and electrically)(Stator, Rotor, Bearing, Bearing housing, Rotor lamination, Conductor bar, Shaft, Frame, Base, Mounting holes, Cooling fan, Cooling fan cover, Conduit box, Winding

-LV motors rewinding and repair workshop.

-LV/MV motors alignment.

-Preparation (Boxes, Panels, Bus-bars, Cables pulling…).

-LV/HT transformers (status, Maintenance, Oil filtration, Cooling and troubleshooting) following up by certain routine job and projects.

-lighting repairing and maintenance (indoor and outdoor).

-Two diesel generators (status, Maintenance and troubleshooting) following up by certain routine job and projects.

-A/C in substation and CCR (status, Maintenance and troubleshooting) following up by certain routine job and projects.

-Electrical cranes (status, Maintenance and troubleshooting) following up by certain routine job and projects.

-Following up spare parts.

-Following up new projects and revamping and upgrading in plant utilities (Service air & Water), Areas and substations.

*Shift responsible (From 1/2011 till 12/2013) with the following responsibilities:

-During shift time I'm the only electrical engineer responsible for that shift (acting as electrical maintenance manager) and responsible for two production lines containing:

*Two limestone crushers.

*Four Raw Mills.

*Two Kilns.

*Two Coolers.

*Five Cement Mills.

*Six Packing Machines.

-Maintaining and troubleshooting Electric equipments in site and electrical substations and support DCS system by leading group of technicians among the plant areas and reporting to electrical maintenance manager.

-Dealing with:

*MCC's (Motor Control Center).

*ACC's (Auxiliary Control Center).

*Motors, circuit breakers, servomotors, dampers, different sensors types, AC drives ABB & Vacon and PLC and DCS system ABB (800XAIndustrial), Modicon.

Previous Jobs:

1*Arab Swiss Engineering Company (ASEC)-Asec Automation Company "ASA"-Member of citadel capital group- as electrical design and commissioning engineer in the design department from 06-2007 till end of 2010.

*During the following activities Target was achieve clients' satisfaction and loyalty.

- Performed FAT test at Schneider Factory in France for MV panels including:

*Visual inspection.

*Check designed drawings with manufactured panels.

*Continuity test.

*Function test for the panels:

-Syncro Check for Sepam (protection relay).

-Most of Sepam functions (simulation for C.B trip conditions).

*Update the designed drawings as manufactured.

- Site Survey at MEFTAH Cement Plant in Algeria including:

*Take motors data from motors installed actually in site.

*Take data from power panels feeding motors (MCC).

*Take data from control and auxiliaries panels (ACC).

*Take data from local control panels.

*Lead for group of technicians and workers.

- Worked in the following sites:

*El Shamal Cement Factory in Atbara-Sudan.

*Titan El-Max Cement Factory (Lafarge standard).

*Tourah Cement Factory (Italcementi standard).

*Kattamia Cement Factory (Italcementi standard).

*Sinai Grey Cement Factory (FLS standard).

*Sinai White Cement Factory (FLS standard).

*Ameryah Cement Factory (Cimpor standard).

*CEMEX Cement Factory.

*EZZ El Dekhela Steel Factory.

*Abu Zabal Fertilizer Company.

- The following tasks at workshop:

*Factory acceptance test (FAT).

*Visual inspection.

*Check designed drawings with manufactured panels.

*Continuity test.

*Bus-Bars insulation test.

*Function test for the panels.

*Update the designed drawings as manufactured.

*Lead for group of technicians and workers.

- The following tasks at office:

*Design LV Panels Like Direct On Line, Cranes...

*Design ACC, MCC Panels (Motor Control Center&Auiliary Control Center).

*Design PLC Panels.

*Design Junction Boxes.

*Searching for Sensor’s Data Sheets for Understanding (Operation&Terminals Connection).

*Understanding Local Panels for Interface Signals with PLC and Cable List.

*Preparing PGRs bill of quantity.

*Entering PGRs on SAP.

*Design Drawing Templates&unit diagram (trouble shooting).

*Working on smartools program (paradox).

*Dealing with Etap program for power flow analysis, Short circuit calculations…

*Dealing, Contacting And Attending Meetings And FAT Tests With Client To Solve Problems And Meet Client Requirements.

*Coordinating Between Site, Erection, Workshop, ARESCO, Client And Design Office(Automation Dep., Sales Dep., Cable Routing Dep., AutoCAD Dep. And Project Managers.

- The following tasks at site:

*Signal testing with the PLC.

*Continuity and meggering test for power cables.

*Rotation test.

*Cold run testing.

*Starting up for our designed low voltage panels.

*Lead for group of technicians and workers.

2*Xerox (The Document Company) as Maintenance Engineer from 2006 till 2007

Responsibilities:

- Trained on different copier products.

- Troubleshooting for Xerox different copier products.

- Maintaining for Xerox different copier products.

- Target was achieving customers' satisfaction and loyalty.

3*Ahmed Daoud & CO. Engineering and Trade Agencies as Sales Engineer.

Responsibilities:

- Specification studies, financial offers And Selling Low Voltage Electrical Components of Siemens.

- Troubleshooting for electrical panels (star-delta, direct on line, switching between two motors).

Personal Skills:

1-I am self motivated and problems solver.

2-Ability to learn new technologies and programming languages.

3-Ability to work under pressure and within team work.

4-Ability to work in a group or individually according to the job requirements.

Computer Skills:

1.Microsoft office: Word, Excel, Outlook & Power Point.

2.Internet Tools.

3.AutoCAD 2D.

Courses:

-Auto cad 2007 2d in computer network and laboratory & information center (faculty of engineering, Cairo University) (2007).

-Safety orientation course (2011).

-Course ABB (T315C & T315H) system 800XA with AC800M (2012).

Experience:

1.Arab Swiss Engineering Company ( ASEC ) ( 2003/2004 ) Training involved an overview of cement production line of national cement plant, namely;

i.

ii.Crushers

iii.Raw Materials Storage

iv.Raw Mills

v.Cement Mills

vi.Preheater

vii.Kiln & Cooler

El NASR Company for manufacturing Steel pipes & its accessories.

PLC (Programming & Wiring).

Summer training at NTC (Network Training Center).

Summer training at Extra High Voltage Research Center.

Spoken Languages:

1.Arabic-Degree: Excellent

2.English-Degree: very good



Contact this candidate