Resume

Sign in

Project Manager Engineering

Location:
Long Beach, California, United States
Posted:
October 23, 2016

Contact this candidate

MAK IBRAHIM, P.ENG.

*** *. ******* ***, ***** # *609, Long Beach, CA, 90802

Home: 562-***-****

acw65d@r.postjobfree.com

Sr. Engineering Manager / Sr. Project Manager.

Extensive experience in Up-stream Oil & Gas production, Oil & Gas Pipelines, Tar Sands, Down-stream Oil & Gas refineries, petrochemicals, chemicals, power generation plants and water treatment.

INDUSTRIES OF EXPERTISE

Over 25 Years Experience in project management, engineering, design, maintenance and construction of Oil fields well production facilities On-shore & Offshore as well as Oil refineries in USA( ExxonMobil, Valero, Chevron, Aera Energy, Berry Petroleum, OXY USA Inc., OXY Long Beach, OXY Vintage Production, Beta Offshore, and Flint Hills Refinery),tar sands plants in Canada (Exxon Kearl Lake Project, CNRL Horizon Project, Suncor Upgrader & SAGD, Shell Upgrader and Syncrude), chemical plants(Shell Chemicals), oil refineries(Petro Canada), petrochemical plants, pipelines, industrial power plants( Alberta Power & Whitecourt Power ) and municipal & water treatment projects (Black &Veatch).

Working with several major engineering companies at various levels of responsibility in project management and mechanical engineering/piping discipline.

Holder of copyrights of a special software program “LAMIS” (Life Assessment of Materials in Service”).

TECHNICAL FIELDS OF EXPERTIES

Technical expertise includes extensive familiarity with engineering specifications, codes requirements, and design application of oil field facilities ( Oil Wells Cellars, Well Y- Header, flow lines, 5-way valve skid, 3 phase separator vessel, Gas Make-up vessel, Gas Air-cooler, air compressor, Vapor Recovery Compressor, metering station, PLC & switch rack, PSV diffuser, steam injection skid, water injection skid, chemical injection skid, Oil Tanks, Sulfa Treat Vessel, Gas K.O. Drum, Flare system), pipelines, pumping stations, pressure vessels, process towers, heat exchangers, feed water heaters, air coolers, steam condensers, pumps, compressors, turbines, motors, high speed gear units, process piping, valves, process heaters, tanks, process ducts, furnaces, safety relief systems, mixers, strainers, screens, filters, steam boilers, power generating equipment, material handling equipment, vibration equipment, etc. Installations included both capital works and maintenance projects.

Experienced Sr. Project Manager, having various responsibilities for the multi-discipline project management and supervision of design / construction personnel on capital projects.

Developed a software computer program "LAMIS", for Life Assessment of Materials In Service. Life Assessment Study included the review and analysis of inspection and maintenance records to quantify and establish performance trends. The main objective of the study is to assess Remaining Service Life (RSL) of equipment that is essential in decision making with respect to the refurbishment versus the replacement Capital Cost Analysis.

EDUCATION

Master of Science in Mechanical Engineering, Sherbrooke University, Quebec, Canada, 1976

Bachelor of Mechanical Engineering, Cairo University, Cairo, 1967

PROFESSIONAL MEMBERSHIPS AND AFFILIATIONS

Registered Professional Engineer in the Association of Professional Engineers, Geologists and Geophysicists of Alberta, APEGGA

Association of Professional Engineers of Ontario, APEO (Past)

Association of Professional Engineers of Quebec (Past)

Associate Member, Canadian Society of Mechanical Engineers (Past)

POSITIONS HELD

2010 – 2014 Engineering Technical Group (Scottsdale, AZ, USA)

Sr. Project Manager for RDS Engineering / RIG (Beaumont,Texas, USA May 2013- April 2014).Principal Project Manager for SPEC Services, Inc.(Fountain Valley, CA, USA Jan.2012–Feb.2013).Senior Project Manager, California Division Lead for KSI Engineering Inc. (Bakersfield, CA, USA July 2010- March 2011) and Project Manager for IQA Solutions, Inc.(Long Beach, CA, USA May 2011- Jan. 2012).

1994 - 2010 QIPS International Inc. / QIPS USA LLC

Senior Project Manager/ Consultant/ Engineering Manager/ Lead Mechanical Engineer/Sr. Mechanical Engineer - for various clients: Bantrel (Bechtel) Co, Aker Kvaerner Process Systems Canada Inc., Alberta Power, Whitecourt Power, Shell Chemicals Canada Ltd., Colt Engineering Corp, Tracer Industries Inc., WorleyParsons (Colt Engineering- Division) Canada, and AMEC Americas Ltd.

1993 - 1994 Black&Veatch / UMA Engineering Ltd.

Senior Project Manager.

1990 - 1993 Alberta Power Limited

Consultant/ Project Manager/ Senior Mechanical Engineer.

1989 - 1990 Kilborn Inc.

Senior Mechanical Engineer.

1988 - 1989 SNC Inc.

Senior Mechanical Engineer.

1978-1988 Syncrude Canada Ltd.

Section Head, Mechanical Engineering.

1973- 1978 Petro Canada Inc.

Senior Maintenance Engineer.

1972 - 1973 Sherbrook University

Research Assistant.

1970 - 1972 H.G. Acres Ltd.

Field Engineering.

1969 - 1970 Los Angeles County

Flood Control Department.

1967 - 1969 Egyptian General Aero Co.

Aeronautical Engineer.

EXPERIENCE

Work History:

RDS Engineering (May 2013- April 2014)– Sr. Project Manager, Beaumont, Texas, USA. Flint Hills Refinery (290,000 BPD) capital projects, responsible for the engineering of capital projects. Managing multi discipline teams to carry out engineering deliverables for several projects.

Projects:

Decoking system replacement.

High Tan piping upgrade.

Stabilizer Overhead Receiver replacement.

Emergency Relief System Improvement.

Slop Wax Tray replacement.

Heater Convection Section upgrade.

Cocker piping replacement.

Shipping facility modification.

Responsibilities & Contributions:

Coordinate Corporate strategy with Construction Department and Fabrication Shop operation managers and supervisors.

Manage multiple projects for different clients.

Carry-out projects throughout the different phases, Proposal, Conceptual, FEED, Detail Engineering, Fabrication, and Construction Support.

Ensure quality of overall design and provide technical solutions.

Ensure that project scope is well defined, all deliverables are identified for all engineering disciplines, and project schedule indicates the target dates for IFR, IFA, IFH & IFC for all deliverables.

Ensure that projects’ budgets are accurate and include adequate contingency.

Ensure that scope changes are identified, controlled and managed through “Management of Change Procedure”.

Ensure that team performance is excellent and supported by the calculated performance factors in the progress cost reports.

Provide adequate manpower to carryout projects through the coordination with Technical and Design managers.

Establish project management systems and procedures (Potential Project Report, Projects Classifications, Project Authorization, Project Proposal template, Project Schedule template, List of Engineering deliverables, typical engineering man-hour estimate, Cost report, Progress Report template, Workload Plan template, Master Projects List, Charge Codes, and Management of Change Procedure).

Conduct progress meetings with clients.

Ensure safety procedures are followed, in the field and office.

SPEC Services (Jan. 2012 – Feb. 2013) Principal Project Manager

Projects:

. Huntington Beach Onshore Drilling Program Project for OXY USA Inc.. Project scope of work consists of Conceptual, Preliminary and Detailed Engineering to drill 80 wells in Huntington Beach- Highland Strip. Responsibilities included managing project team consisting of P.E engineers and designers in all disciplines, Process, Mechanical, Civil/Structure, Electrical/Control and Piping. Also included are organizing and coordinating the development of scope definition, deliverables, schedules, budget, cost & performance reports, status reports, and invoicing. Project scope includes the development of Master Plot Plan for the new cellars, power supply infrastructures to support production as well as the Drilling Rigs operation, detail design of Well Cellars and infrastructures, and field construction support.

. Various projects for OXY Long Beach, Inc. such as Skid mounted Automatic Well Tester System, Skid mounted Automatic Custody Transfer System, and Corporate Standards development Program.

Responsibilities & Contributions:

Similar “Responsibilities” as with RDS Engineering.

IQA Solutions Inc. (May 2011 – Jan. 2012), Project Manager - Long Beach, California, USA.

Projects:

ALKY –LPG storage Tanks (ExxonMobil).

Acid cooler Heat Exchanger (Valero).

Shipping pump upgrading (Beta Offshore).

Gas Turbine overhauling (Beta Offshore).

Responsibilities & Contributions:

Similar “Responsibilities” as with RDS Engineering.

KSI Engineering, Inc. (July 2010 – March 2011) - SR. Project Manager, California Division Lead, for OXY Vintage California Production Co. Early Production Facility- Kern County Project. Project scope of work consists of Preliminary and Detailed Engineering to construct a facility consisting of 3- Phase Separator vessel, Make-up Gas vessel, Sulfa Treat vessel, Gas Air-cooler, Pumps, Vapor Recovery Compressor, Gas K.O. Drum, Tanks, Baker Tanks, Relief Valves Vent Stack, Flare K.O Drum, Flare stack, Automatic Well Tester and Truck Loading system. Responsibilities included managing project team consisting of P.E engineers and designers in all disciplines, Process, Mechanical, Civil/Structure, Electrical/Control and Piping. Also included are organizing and coordinating the development of scope definition, deliverables, schedules, budget, cost & performance reports, status reports, and invoicing. Also responsible for multiple projects for Upstream Oil/Gas Field Production Onshore and Offshore, ExxonMobil, Valero, Chevron, Aera Energy, Berry Petroleum, Vintage Production (OXY), DNO Yemen SA, and MT-Energie USA. The following are detailed responsibilities:

Responsibilities & Contributions:

Direct / Manage Project Managers, who are assigned to California Division.

Coordinate KSI Corporate strategy with Construction Department and Fabrication Shop operation managers and supervisors.

Manage multiple projects for different clients.

Carry-out projects throughout the different phases, Proposal, Conceptual, FEED, Detail Engineering, Fabrication, and Construction Support.

Ensure quality of overall design and provide technical solutions.

Ensure that project scope is well defined, all deliverables are identified for all engineering disciplines, and project schedule indicates the target dates for IFR, IFA, IFH & IFC for all deliverables.

Ensure that projects’ budgets are accurate and include adequate contingency.

Ensure that scope changes are identified, controlled and managed through “Management of Change Procedure”.

Ensure that team performance is excellent and supported by the calculated performance factors in the progress cost reports.

Provide adequate manpower to carryout projects through the coordination with Technical and Design managers.

Establish project management systems and procedures (Potential Project Report, Projects Classifications, Project Authorization, Project Proposal template, Project Schedule template, List of Engineering deliverables, typical engineering man-hour estimate, Cost report, Progress Report template, Workload Plan template, Master Projects List, Charge Codes, and Management of Change Procedure).

Conduct progress meetings with clients.

Provide business development plan.

Carry-out business development to increase market share.

Carry-out interviews to hire engineers, project engineers and project controllers.

Ensure safety procedures are followed, in the field and office.

Water treatment plant (Berry).

POSO Creek Electrical Power Study- ETAP Model (Berry).

Dehydration facilities (DNO).

DSD LOTS testing facilities (Aera).

Platform Emmy Regulatory Review (Aera).

Oilfield 2025 Conceptual Design and Operation (Aera).

Cyclic Steam Study (Aera).

PAA Wellhead Piping Upgrade (Aera).

Cymric Chemical Injection Skid (Chevron).

Biogas Plant Design Conversion (MT-Energie).

AMEC Americas LTD- Calgary, Alberta, Canada.

ExxonMobil Kearl Lake Project ($4bln) and Canadian Natural Resources Horizon Project ($170 M).

Project Engineering Manager, responsible for CNRL Extraction Hydrotransport Project, Detail Engineering, Procurement and Construction Work Packages. The following are detailed responsibilities:

Responsibilities & Contributions:

Manages engineering group of multi-discipline Leads, engineers, specialists, and designers (40-50 manpower), document control staff, and Information Management.

Supervises discipline leads (Process, Mechanical, Electrical, Civil & Structure, Instrumentation & Controls, and Information Management)

Interfaces with Client’s project team for scope definition, technical decisions, and progress reporting

Establishes engineering budget man-hours

Ensures technical quality of engineering deliverables

Ensures that engineering work is carried out on target as per project schedule

Prepares the engineering section of the Project Management Plan

Prepares work plans, schedules and budgets for the project in conjunction with Discipline Leads.

Ensures that engineering work on the project is completed in accordance with project SHE, risk management and engineering plans and AMEC Quality Management system

Establishes the systems for measuring technical progress and productivity for the project

Facilitates and establishes the co-ordination of engineering work between disciplines, and between the engineering group and other project groups

Prepares project instructions for engineering work on the project

Assists the Project Manager, in preparing project instructions for communication and co-ordination between the Company, the client and the other organizations

Manpower planning and arranges for the appointment of adequate quantity of qualified technical staff

Initiates, co-ordinates and supervises work on the project and implements project instructions through the Discipline Leads

Monitors man-hour spent and progress on the project

Takes corrective action to control engineering work within budget and schedule

Prepares regular and special reports as required.

Keeps the Project Manager informed of difficulties encountered and issues that arise on the project

Develops a plan for production of documentation, including computer aided document production

Assigns responsibilities for procurement packages to engineering staff

Ensure that copies of obsolete or superseded documents are not in use on the project

Acts as liaison with Construction Manager regarding changes, additions and clarifications to technical documents.

WorleyParsons - Calgary, Suncor Inc.- Fire-bag Project(SAGD)(U$1B), Alberta.

Lead Mechanical Engineering, responsible for Stages 4&5 Engineering Design Specifications (EDS) and Detail Engineering. The following are detailed responsibilities:

Responsibilities & Contributions:

- Provide direct supervision and technical guidance to a team of engineers & specialists (16 staff under my supervision).

- Provide input into project schedule.

- Provide input to project capital cost estimate.

- Provide input to technical reviews. Ensure that deficiencies have been corrected.

- Ensure that all engineers understand and follow the project quality management plan.

- Report Mechanical Engineering progress, weekly and monthly.

- Manpower planning and assign additional resources when required.

- Provide technical decisions and review & approve mechanical engineering work to ensure deliverables (Data sheets, MRQs, TBEs, MRPs, Vendors’ Dwgs. reviews, Special Studies, Material Selection Diagrams, Equipment Lists,etc) are of excellent technical quality and on schedule.

- Provide project updates as well as solicit feedback, as needed.

- Attend other project and corporate meetings as required.

- Ensure all project discipline personnel are functioning as a team.

- Develop staffing plans for the project based on approved man-hour budgets.

- Work with the other project leads to define discipline interface areas.

- Provide input to “Management of Change” and Trend procedure.

- Conduct staff “Performance” reviews.

Bantrel Co. (Bechtel) - Calgary, Suncor Inc.- Voyageur Upgrader Project (U$ 10 B), Alberta.

Overall Mechanical Engineering Lead, responsible for Coker, Utilities & Offsite Areas in multi- offices (Calgary, Toronto, Edmonton). The following are detailed responsibilities:

Responsibilities & Contributions:

- Provide technical guidance & 'coaching' to the area leads and engineers (35 staff under my supervision).

- Provide discipline specific input into project technical reviews. Ensure that deficiencies have been corrected.

- Ensure that all area leads and support personnel understand and follow the project quality management plan.

- Monitor engineering progress and provides additional resources when required.

- Monitor mechanical engineering work to ensure deliverables (Data sheets, MRQs, TBEs, MRPs, Vendors’ Dwgs. reviews, Special Studies, Material Selection Diagrams, Equipment Lists, ..etc) are of excellent technical quality and on schedule.

- Provide project updates as well as solicit feedback.

- Attend other project and corporate meetings as required.

- Ensure all project discipline personnel are functioning as a team.

- Develop staffing plans for the project based on approved man-hour budgets.

- Work with the other project overall leads & area leads to define discipline interface areas.

- Provide input to “Management of Change” and Trend procedure.

- Conduct staff “Performance” reviews.

- Develop Mentoring Program.

Aker Kvaerner Process Canada, Tabnak Gas Treating Project (U$ 700 M), IRAN.

Lead Mechanical Engineering, managing / supervising up to 6 engineers and 20 designers (pressure vessel, heat exchangers, storage tanks, rotating equipment - pumps & compressors -, piping, piping stress analysis and material selection). Work included the provision of all basic and detail engineering deliverables such as project specifications, Inspection Testing Plans, equipment data sheets, Pressure Vessel detail & fabrication drawings, pressure vessel ASME Code Calculation Report, Equipment plot plans, piping isometrics, piping stress reports, Material Requisitions, Bid Evaluation, Vendors’ drawings & documents review, Special engineering studies such as corrosion monitoring & control. These engineering deliverables are part of the scope of work for the TABNAK GAS TREATING PLANT & ASSALUYEH LOADING FACILITIES PROJECT in IRAN. Estimated at U$700 million, the plant will add facilities to treat additional 900 MSm3/h of natural gas.

Managing the Mechanical Engineering Group includes manpower budget planning, work assignments, workload plans, schedules & target dates, technical reviews, Engineering Codes application, engineering quality control, approval of all deliverables, responding to client’s inquiries, and conducting employees’ performance appraisals.

SYNCRUDE CANADA

Section Head, Mechanical Engineering / Technical Advisor, responsible for planning and implementing project management controls, providing administration and technical direction to engineers and designers, planning, budgeting, scheduling for a variety of capital and maintenance projects for Syncrude, including:

Utilities - Mechanical Section Head responsible for all technical, design, repairs and modifications in supporting Utilities and Power Generation Plant including all shutdown engineering items. Equipment included Boilers, Main Condensers, feed water heaters, steam drums, ash removal system, Turbines, Compressors, heat exchangers, piping systems, tanks etc.

Two Fluid Coker Units -provided design, engineering and problem solving for numerous technical problems during the first two years of start-up. Provided design engineering for debottlenecking Coker units to increase production of equipment. Modification was carried out to the Coker Feed Pumps, Heat Exchangers and interconnecting lines. Also provided plant engineering /maintenance support for Coker Shutdowns as required.

Debottleneck Project - Mechanical Section Head responsible for preparation of basic and detail design, monitoring and approval of contractor and vendor drawings, evaluation of tenders and quality control of all mechanical equipment, on this $150 Million Debottleneck program for “Upgrading Units”, which ultimately resulted in a production increase of 20% annually. Equipment included pumps, compressors, turbines, motors, heat exchangers, process furnaces, pressure vessels, valves, control valves, safety relief system, piping, structures, cranes, drums, tanks, instrumentation and substations.

Naphtha Recovery Plant -Mechanical Section Head, responsible for development of design specifications, detail engineering and construction trouble shooting for the mechanical portion of an $11 Million Naphtha Recovery unit. Mechanical equipment included pumps, pressure vessels, turbines, motors, piping valves, control stations, safety relief systems, safety monitoring equipment, cranes, heat exchangers, towers, drums, drainage and sewer system, and an emergency blow down system.

Water Treatment Plant Expansion -responsible for design specifications, detail design and monitoring field construction. Mechanical equipment included a high lift pump station, low lift pump station, valves, piping, tankage, screens and filters, exchangers and treatment vessels and waste disposal system.

Vibration Monitoring -directed study team in the development, recommendation and implementation of solutions for vibration problems with main bitumen feed pumps. Equipment included pumps, motors, turbines, valves, piping, strainers and vibration equipment. Work included an analog computer analysis.

Miscellaneous - responsible for factory and field acceptance tests for main feed pumps in the Coker units, as well as associated motors, turbines, piping, valves, hangers, supports, structures and foundations.

Plant Shutdowns - responsible for mechanical engineering for over 100 maintenance work items for annual shutdowns, and all resulting repairs on pumps, turbines, compressors, heat exchangers, piping, valves, tanks, drums, pressure vessels, structures, furnaces, steam boilers, sewers, drainage systems, etc.

CAP Piping - responsible for review and approval of all piping tie ins for the Capacity Addition Project (CAP), valued at $750 Million.

COLT Engineering Corp., Interprovincial Pipeline Inc- Line 9 Reversal Project

Lead Mechanical Engineering, responsible for supervising the mechanical group consisting of 11 engineers, designers and CAD drafters, and organizing, planning and carrying out Basic and Detail Engineering for “Line 9 Reversal” project. Work included hydraulic studies, stress analyses, material requisitions, construction detail drawings and hydro testing packages. Equipment included main pump, booster pumps, piping systems, crude oil storage tank, sump tanks, injection pumps, fire water line, pressure control stations, pressure relief station and metering equipment. The project included the reversal of crude oil (270,000 BPD) supplies from Montreal to Sarnia. A total of 9 stations/terminals were modified and a new 150 foot crude oil storage tank was constructed.

ALBERTA POWER LIMITED (ATCO) EDMONTON - VARIOUS PROJECTS

Project Manager responsible for supervising, organizing, planning and carrying out construction and design of projects as well as management of all related activities.

Developed project systems and procedures, work schedules, cost control and reporting system. Prepared betterment proposals with justifications for capital funds authorization. Managed contract consultants and construction companies for all field work, and prepared contract documents. The following are detailed responsibilities:

Roles & Responsibilities:

- Organize project team, and identify required resources.

- Plan project activities, providing Master Schedule.

- Co-ordinate the carrying out of detail design (IFC packages).

- Supervise & manage contracts & consultants.

- Develop project systems and procedures.

- Develop cost controls.

- Provide status reporting system.

- Manage construction activities.

- Ensure QA/QC has been provided, on time.

- Ensure all technical review/approvals have been provided, on time.

- Prepare Capital Authorization Forms (CAF) with justifications for Capital funds authorisation.

- Ensure project documentation and updates are provided.

- Prepare RFQ's, PO's.

- Manage scope changes and its impact on cost & schedule.

- Provide data & information for operating procedures.

- Follow up during commissioning and Start-up.

- Plan project activities, providing Master Schedule.

- Co-ordinate the carrying out of detail design (IFC packages).

- Supervise & manage contracts & consultants.

- Sign off for Project Completion and final documentation filing.

- Provided problem solving for technical and non-technical field concerns, organized and implemented safety awareness. Over 150,000 man hours were spent without a single accident.

Projects were completed within budgets and on schedule. Projects included:

a) Station "A" Life Assessment Study ($1.0 Million)

b) Station "A" Restoration Phase 1 ($2.7 Million)

c) Main Steam Lines Repairs Units 1 & 2 ($0.7 Million)

d) Steam Blowing Units 1 & 2 ($0.2 Million)

e) Furnace Safeguards and Supervisory System ($0.9 Million)

f) Ladders and Platforms ($0.5 Million)

g)Turbo-Generator Retaining Rings ($0.2 Million)

h) Obsolete Equipment Removal ($0.12 Million)

i) Station "A" Repowering Study ($30 Million).

Carried out Life Assessment Study for High Energy Piping Systems and various equipment, supervised and coordinated Life Assessment Studies for boilers, turbo-generators, feed water heaters (high and low pressures), condenser and all other associated equipment.

The results of the study are the development of strategic plans for 5,10 and 15 years of additional service with specific action plans which details items for Capital Investment items for maintenance actions and items for inspection and monitoring program.