CURRICULUM VITAE
KEITH BRIAN BARTON
MILEHOUSE
PLYMOUTH
DEVON
PL3 4DA
TELEPHONE 017**-******
MOBILE 077**-******
E-MAIL acw4r8@r.postjobfree.com
PERSONAL DETAILS
DATE OF BIRTH: 25th of April 1956 MARITAL STATUS: MARRIED
PROFILE
A mature person who is not afraid to make decisions when needed but also enjoys being part of a team. Bright and cheerful, reliable, trustworthy and very conscientious, with good man management skills and client relations and willing to take any further training to further enhance my management and health and safety qualifications. I have worked up from a trade background through to site management... I have held a full clean driving license since 1975; I have a grown-up family (no dependants), am a non-smoker
EDUCATION
CAMEL’S HEAD SECONDARY MODERN SCHOOL
CAMEL’S HEAD
PLYMOUTH
COURSES TAKEN
FULLY TRAINED BRICKLAYER/MASON
SMSTS SITE MANAGER CERTIFICATE
CCSNG SUPERVISOR CERTIFICATE
CSCS MANAGERS CERTIFICATE
5 day FIRST AID
HOT WORKS CERT
CRB CLEARED SEPT 2016
PASMA
SCAFFOLD INSPECTION
ASBESTOS AWARENESS CERTIFICATE
FIRE WARDEN
MANUAL HANDLING
HEALTH & SAFETY FOR MANAGEMENT
WASTE MANAGEMENT CERTITICATE (IN HOUSE)
CAREER TO DATE
JULY 2016 TO DATE. TEMPORARY SITE MANAGER FOR GALLIFORD TRY ON ENABLING WORKS / DEMOLITION OF A BLOCK OF GARAGES OVERSEE THE REMOVAL OF CONTAMINATED SPOIL FROM EXISTING GROUND & FORM NEW SITE ENTRANCE,DRAINAGE ROAD GULLIES & SET UP SITE WELFARE COMPOUND/STORAGE.
JAN 2016 TO JULY16. TAYLOR ROSE AS A FREELANCE SNR SITE MANAGER ON ALTERATIONS & REFURBISHMENT OF A FOOD PROCESS FACTORY(TULIP BODMIN) LARGE WHITE WALL/CEILING INSTALLATION M&E & INSTALLATION OF PLANT/ EQUIPMENT . COMPLETED MAY AND AT (GENIUS FOODS SCOTLAND) ON NEW INSTALLATIONS OF WASH-ROOMS & SPIRAL CHILLER, NEW DRAINAGE & M&E, REMOVAL OF REDUNDANT SERVICES /PLANT.
AUG 2014 TO DEC 15, SNR SITE MANAGER CONSTRUCTION & INSTALLATION OF 3N0 PROCESS PLANTS FOR F.L.I. ENERGY/ GFLE ENERGY ON AN AD BIO GAS FACILITY WITH LARGE RC TANKS / SILAGE CLAMPS / M&E WORKS.
FEB 14 TO JULY 14 SITE MANAGER ON A DEMOLITION OF A REDUNDANT R C FRAME & TRADITIONAL BUILD LAUNDRY BUILDING REMOVAL OF ASBESTOS & CONTAMINATES FOR DSP, CM
DEC 2013 TO JAN 2014; SITE MANAGER ON A DEMOLITION, SOFT STRIP /, CONVERSION OF AN INDUSTRIAL UNIT INTO A SCREWFIX UNIT RESOLUTION INTERIORS
FEB 2013 TO NOV 2013 ; TEMPORARY CONTRACTS AS CLERK OF WORKS (AGY) FOR 3 RUNNING CONTRACTS, COMPLETION & COMMISSIONING OF A FOOD FACTORY IN MID DEVON (PREMIER FOODS) CHALCROFT
INSTALLING COOLING 4no TUNNEL’S AT (WRIGLEY’S) PENNMANN
& HIGH RISE BLOCK OF APARTMENTS TO OVERSEE THE CAVITY WALL INSULATION & EXTERNAL PAINTING,WINDOW/BRICKWORK REMEDIAL’S (ARCUS CONSLT). SITE MANAGER AT WRIGLEY’S BUILDING 4NO COOLING TUNNELS
MARCH 2011 TO FEB 2013: SENIOR SITE MANAGER ON REFURBISHMENTS OF TESCO #ASDA & SAINSBURYS STORES & CONSTRUCTION OF 3 no LUXURY TREE HOUSES AT CENTRE PARCS LONGLEAT FOR UPLANDS RETAIL/CONSTRUCTION
OCT 09-TO NOV 2010 CLERK OF WORKS (REPAIRS SURVEYOR) ON A 13 MONTH CONTRACT WITH DEVON AND CORNWALL HOUSING ASSOCIATION
FEB 09-SEPT 09 SITE MANAGERS ON A LISTED CONVERSION/NEWBUILD MANSION HOUSE INTO 18 LUXURY APARTMENTS WBS COMPANY FOLDED
APRIL 08 – FEB 09 FREELANCE SITE MANAGER ON A CINEMA/RESTAURANT COMPLEX AT ST AUSTELL. FOR SIR ROBERT MACALPINE LARGE R C & STEEL STRUCTURE, TRADITIONAL BRICK& BLOCKWORK, GLAZED SCREENING WITH LARGE ACOUSTIC& M&E INSTALATIONS, AIR INTAKE & EXTRACT SYSTEMS
JANUARY 07 ---TO APRIL 08 SITE MANAGER ON A CONVERSION OF A 19TH CENTURY GRADE 2 STONE BUILT FORT INTO LUXURY APARTMENTS IN CORNWALL FOR CORVON MAJOR STONEWORK, ROOF DEVELOPMENTS
SEPT O6 TO DECEMBER 06 SITE MANAGER ON NIGHT SHIFT on a New-Build/ Refurbishment of SAINSBURYS Plymouth FOR RG GROUP LARGE REFRIDGERATION/FREEZER PLANT & M&E INSTALATIONS,AIR INTAKE & EXTRACT SYSTEMS
SEPT 05---TO SEPT 06 SITE MANAGER on 2no ALDI stores soft strip refurbishment retail In Exeter & new build ALDI in Truro RADIAL MANAGEMENT.LARGE FREEZER/REFRIDGERATION M&E INSTALATIONS,AIR INTAKE & EXTRACT SYSTEMS
FEB 05 –SEPT05 SITE MANAGER on refurbishment of M&S store Taunton for Midas
SEPT 04- FEB 05 SITE MANAGER on short term contract for Pearce Retail on a refurbishment of an ASDA store LARGE FREEZER/REFRIDGERATION PLANT &M&E INSTALATIONS, AIR INTAKE/EXTRACT SYSTEMS
NOV 03-SEPT 04 FREELANCE AS A CONSTRUCTION MANAGER
On a 4.8 million factory conversions / clean room large e project for M&W ZANDER
INSTALATION OF FAN TOWERS, HEPPA FILTER SYSTEMS, AIR INTAKES/EXTRACTION, CHEMICAL & ACID PIPELINE, WATER COOLANT SYSTEMS WITH LARGE M&E INSTALATIONS
JAN 02-NOV 03 SITE MANAGER for WREKIN on a construction of a cheese processing plant. CLEANROOM/SEMI CLEANROOM
APR01-DEC 01 EDMUND NUTTALS CIVIL ENGINEERS – SITE MANAGER
WORKING WITHIN H.M OIL STORAGE FACILITY WITH HIGH LEVEL SECURITY CLEARANCE
Duties included overseeing sub contract labour-force, quality checks, and materials control and health and safety management. CONSTRUCTION OF AN OIL REFINERY, PIPEWORKSYSTEM FROM JETTY TO STORAGE TANKS WITH BUNDING/CONTAINMENT TO STORAGE TANKS WITH LARGE M&E INSTALATION/SECURITY SYSTEM
JAN 99-APR 01 FREELANCE AS A SITE MANAGER
Various projects including 16 week 18 million fast-track new build/refurbishment on Butlins 2000 Bognor Regis .and new build housing and light industrial units
NOV‘94-JAN ’99: FRELANCE- SITE MANAGER M+W Pearce
Working on Clean room Wafer construction Fabrication & hook up of factories/fabs within the Plymouth, Newport, Dresden
WITH LARGE M&E INSTALATIONS, AIR INTAKE/EXTRACT HEPPA FILTER SYSTEM, CHEMICAL/ACID PIPEWORKS, WATER COOLANT SYSTEM, FAN TOWERS
Duties included control of subcontractor labour force management of the refurbishment/new build converting spice factories into luxury apartments and speculative new build luxury accommodation. Overseeing subcontractor labour force, management of the clean build. Health and safety management. Quality checks and material control. All working to a high standard within budgets and schedules.
APRIL 92-NOV 94 TRY BUILD –SITE MANAGER
Duties included overseeing packages of contractors each with their own specialist trades and setting out and planning schedules of deliveries large M & E installations and air extract/intake systems chemical pipe works water coolant system fan towers construction of the Pharmacy& Renal Wards at D0.erriford hospital, GEC Plessey wafer Fab, HM naval base and Dartmouth naval college, working within a high level security areas and security cleared
JAN‘90-MARCH ’92 TILBURY DOUGLAS – SUB AGENT
Duties included overseeing sub contract labour force, finishing’s and work packages. Quality checks and materials control within a 75 and a 56 unit (Warden assisted block accommodations)
1985-DECEMBER ’89 LANDMARK DEVELOPMENTS – SITE MANAGER
Duties included overseeing sub contract labour force, finishing’s and work packages. Quality checks and materials control within new build high-class housing.
Before which time I worked as a bricklayer/mason before becoming a working foreman on various projects.
I have written references on hand as well as certificates of courses taken that I can bring to an interview if granted