Summary

HVAC, U.K. Nuclear Storage Facility, Mechanical Designer:

Mr. Palomar primary purpose as mechanical designer is to layout HVAC equipment and design low pressure hot water and chilled water piping systems for large facilities. Mr. Palomar has designed the above ground facility BOP piping, coordinating with the Project lead, mechanical engineers and other project engineering personal to ensure that all mechanical system designs interface correctly with equipment and do not interfere with electrical and civil systems. The mechanical designer shall model various HVAC equipment using AutoCAD, Autodesk AutoCAD Plant 3D 2014, and Navisworks Simulate 2014.

Petroleum and Gas, Mechanical Designer II:

Mr. Palomar’s primary purpose as mechanical designer II is to layout petroleum and gas facilities of various types. The designer II shall model various pressure vessels from engineering data sheets to support fabrication drawings. Heat exchangers of various types are to be modeled from compress reports and engineering data sheets so fabrication drawings can be generated. Mr. Palomar has designed above and underground facility BOP piping, he coordinates with mechanical engineer and other project engineering personal to ensure that all mechanical system designs interface correctly with equipment and do not interfere with electrical and civil systems. Mr. Palomar has generated CADWorx Bill of materials, Isometric drawings, and Cesar II models. Mr. Palomar has used CADWorx Pro 2014 spec editor to generate a new piping specification project prj files. Mr. Palomar has used 2014 spec editor to create and edit existing CADWorx Catalog, carbon steel piping and component data base.

Power Industry, Lead Mechanical Designer:

Mr. Palomar’s primary purpose as mechanical lead designer is to provide project coordination for the mechanical technical services design team.

This included providing monthly estimating of project resources for company personal and equipment that support project and construction scheduled deadlines. The lead designer initiates and coordinates requests for project setup as per company guidelines. This is to ensure that the project resources are in place to meet project objectives and scheduling. As mechanical lead designer he is responsible for all mechanical piping above and below ground. He coordinates with the

Summary cont.

project mechanical design engineer and other project engineering personal to ensure that all mechanical system designs interface correctly

with equipment and do not interfere with electrical and civil systems.

Mr. Palomar as lead mechanical designer is responsible for the mechanical 3D electronic models and files. During the course of the project development he will conduct customer 3D presentations for customer input and approval. During the construction phase he is responsible for providing 3D models to the field for construction labor. At the end of mechanical construction phase Mr. Palomar is responsible for the customer as-installed documentation and electronic files.

Designer:

Mr. Palomar’s primary purpose as designer is to initiate and coordinate engineering plans, cost estimates, specifications, calculations, designs,

sketches and drawings into final form for efficient completion of assigned power plant projects with regard for accuracy, economics, aesthetics, public relations, safety, and applicable codes/regulations. He initiates and coordinates procurement of material and internal/external construction labor. He performs drafting and provides guidance to other drafters for completion of drawings.

Civil:

Mr. Palomar started working for Public Service Company of Colorado at the Comanche SEGS unit two construction QC/QA on site testing lab in 1973. Mr. Palomar’s primary purpose was QC inspection and non-destructive testing. Mr. Palomar at the end of startup actives for Unit 2, moved to the Structural and Civil Department in Denver. Mr. Palomar worked on a various sub-stations and power plant projects from 1976 to 1985, providing civil and structural drafting and design on foundation and structural steel. Mr. Palomar in 1985 moved from civil to mechanical engineering where his primary purpose was to perform drafting and design on power plant mechanical projects. From 1987 to 1990 Mr. Palomar transitioned to project coordination (see page 6).

Proficient in the following Software Packages

Microsoft Office Suite

Autodesk AutoCAD Plant 3D 2014

Navisworks 2014

AutoCad 2014

CADWorx Plant Professional 2013 & 2014

CADWorx Spec Editor Pro 2013 & 2014

MicroStation 1995, MicroStation J, MicroStation V8

MicroStation Plant Space, MicroStation Plant Space V8, MicroStation Plant Space P&ID V8

Petroleum and Gas Industry

Mechanical Designer ii

TSO Origin Pump Station, Preliminary Site layout, TESORO

TSO Origin Pump Station, Preliminary Site Fire Protection layout, TESORO

TSO Intermediate Station, Transfer Metering Station, Preliminary Site layout, TESORO

TSO Intermediate Station, UPE Pressure Reducing Station, Preliminary Site layout, TESORO

TSO Intermediate Station, UPE Intermediate Pump Station, Preliminary Site layout, TESORO

TSO Intermediate Station, UPE Intermediate Heat Station, Preliminary Site layout, TESORO

2014

Mr. Palomar designed preliminary site layouts including fire protection for the Origin Station. The preliminary designs included black and yellow crude storage tanks, truck unloading stations, pipe rack, glycol system, flush system, primary pump system, heat system, and BOP piping.

Mechanical Designer ii

Douglas Truck Unloading and Rail Loading Facility

2014

Mr. Palomar designed several mechanical piping systems for the Douglas Truck Unloading and Rail Loading Facility Project. His designs included 3D modeling of the facility site layout, equipment locations and above and underground piping designs. 3D modeling of vendor supplied equipment using ACAD solids. Mr. Palomar designed unloading metering stations, transfer pumps, staging tanks and BOP piping Rail loading facility. Mr. Palomar has designed and 3D modeled various pressure vessels using engineering data sheets to support fabrication of both equipment and equipment skids. Mr. Palomar has also generated Isometric drawings and Cesar II models.

Mechanical Designer ii

Williams Truck Park Unloading Facility

2014

Mr. Palomar designed several mechanical piping systems for the Williams Truck Park Unloading Facility Project. His designs included 3D modeling of the facility site layout, equipment locations and above and underground piping designs. 3D modeling of vendor supplied equipment using ACAD solids. Mr. Palomar designed unloading metering stations, transfer pumps, staging tanks and BOP piping. Mr. Palomar has designed and 3D modeled various pressure vessels using engineering data sheets to support fabrication of both equipment and equipment skids. Mr. Palomar has also generated Isometric drawings and Cesar II models.

Mechanical Designer ii

Mark West Cadiz, Gas Stabilization Facility

2014

Mr. Palomar designed several mechanical piping systems for the Mark West Cadiz, Gas Stabilization Facility Project. His designs included 3D modeling of above ground piping designs. 3D modeling of vendor supplied equipment using ACAD solids. Mr. Palomar designed various Heat Changers using Compress reports and Engineering Data sheets. Mr. Palomar modeled in 3D various Heat exchangers, tub sheets, Heat Exchanger tube internal components, tube bundles and tube support systems. Mr. Palomar modeled Heat Exchanger channel, shell, support saddles, and nozzles components using CADWorx Equipment Modeler to support Fabrication drawings.

Mr. Palomar has designed and 3D modeled various pressure vessels using engineering data sheets to support fabrication of both equipment and equipment skids. Mr. Palomar has also generated Isometric drawings and Cesar II models.

Mechanical Designer ii

Mark West Utica, Gas Stabilization, Train 1 Facility

2014

Mr. Palomar designed several mechanical piping systems for the Mark West Cadiz, Gas Stabilization, Train 1 Facility Project. His designs included 3D modeling of above ground piping designs. 3D modeling of vendor supplied equipment using ACAD solids. Mr. Palomar designed various Heat Changers using Compress reports and Engineering Data sheets. Mr. Palomar modeled in 3D various Heat exchangers, tub sheets, Heat Exchanger tube internal components, tube bundles and tube support systems. Mr. Palomar modeled Heat Exchanger channel, shell, support saddles, and nozzles components using CADWorx Equipment Modeler to support Fabrication drawings.

Mr. Palomar has designed and 3D modeled various pressure vessels using engineering data sheets to support fabrication of both equipment and equipment skids. Mr. Palomar has also generated Isometric drawings and Cesar II models.

Mechanical Designer ii

HHE Gabbark Fork, Gas Processing Station Facility

2014

Mr. Palomar designed several mechanical piping systems for the HHE Garbbark Fork, Gas Processing Facility Project. His designs included 3D modeling of above ground piping designs. 3D modeling of vendor supplied equipment using ACAD solids. Mr. Palomar designed various Heat Changers using Compress reports and Engineering Data sheets. Mr. Palomar modeled in 3D various Heat exchangers, tub sheets, Heat Exchanger tube internal components, tube bundles and tube support systems. Mr. Palomar modeled Heat Exchanger channel, shell, support saddles, and nozzles components using CADWorx Equipment Modeler to support Fabrication drawings.

Mr. Palomar has designed and 3D modeled various pressure vessels using engineering data sheets to support fabrication of both equipment and equipment skids.

Mechanical Designer ii

CM Martin,Yellow Rose Compressor Station Facility

2014

Mr. Palomar designed several mechanical piping systems for the CM Martin, Yellow Rose Compressor Station Facility Project. His designs included 3D modeling of above ground piping designs. 3D modeling of vendor supplied equipment using ACAD solids. Mr. Palomar designed various Heat Changers using Compress reports and Engineering Data sheets. Mr. Palomar modeled in 3D various Heat exchangers, tub sheets, Heat Exchanger tube internal components, tube bundles and tube support systems. Mr. Palomar modeled Heat Exchanger channel, shell, support saddles, and nozzles components using CADWorx Equipment Modeler to support Fabrication drawings.

Mr. Palomar has designed and 3D modeled various pressure vessels using engineering data sheets to support fabrication of both equipment and equipment skids. Mr. Palomar has also generated Isometric drawings and Cesar II models.

Mechanical Designer ii

CM Martin, Gas Processing Facility

2014

Mr. Palomar designed several mechanical piping systems for the CM Martin Gas Processing Facility Project. His designs included 3D modeling of above ground piping designs. 3D modeling of vendor supplied equipment using ACAD solids. Mr. Palomar designed various Heat Changers using Compress reports and Engineering Data sheets. Mr. Palomar modeled in 3D various Heat exchangers, tub sheets, Heat Exchanger tube internal components, tube bundles and tube support systems. Mr. Palomar modeled Heat Exchanger channel, shell, support saddles, and nozzles components using CADWorx Equipment Modeler to support Fabrication drawings.

Mr. Palomar has designed and 3D modeled various pressure vessels using engineering data sheets to support fabrication of both equipment and equipment skids. Mr. Palomar has also generated Isometric drawings and Cesar II models.

Mechanical Designer ii

EPS Bartholomew Pump Station

2013

Mr. Palomar designed several mechanical piping systems for the EPS Bartiblome Pump Station project. His designs included above ground piping designs and 3D modeling of equipment and pump Skids to support fabrication and construction of the new pumping station. Mr. Palomar has also generated Isometric drawings and Cesar II models.

Combined Cycle Power Plants

Lead Mechanical Designer

Lower Colorado River Authority (LCRA)

Winchester Power Park

2007

Mr. Palomar provided coordination for the mechanical technical service design team. He coordinated design and documentation of underground and above ground piping systems. Mr. Palomar’s coordination and designs included underground utilities and above ground piping designs to support construction of four new LM6000 combustion turbines.

Lead Mechanical Designer

Comanche Unit 1,2, and 3 Expansion Project

Excel Energy

2006-2007

Mr. Palomar provided coordination for the mechanical technical service design team. He coordinated design and documentation of underground and above ground piping systems. Mr. Palomar’s coordination and designs included underground utilities and above ground piping designs to support construction of AQCS systems for two existing coal fired 350 MW units and one new coal fired 750 MW unit.

Mechanical Designer

Turlock Irrigation District

Walnut Energy Center

2004-2006

Mr. Palomar designed several mechanical piping systems for the Turlock Walnut Energy Center 7EA combined cycle project. His designs included underground utilities and above ground piping designs to support construction of the new combustion turbine and HRSG.

Mechanical Designer

Calpine Corporation

Rocky Mountain Energy Center

2004

Mr. Palomar designed several mechanical piping systems for the Rocky Mountain Energy Center project. His designs included underground utilities and above ground piping designs to support construction of the new combustion turbine and HRSG.

Training

Autodesk AutoCAD Plant 3D 2014

Autodesk Navisworks Simulate 2014

CADWorx Pipe Specification Building Training, ECE Design, Instructor, Matt Worland, 7/17/13

CADWorx Catalog & Spec Training, ECE Design, Instructor, Matt Worland, 10/10/13

CADWorx Plant Professional Training, ECE Design, Instructor, Matt Worland, 08/23/13

Melco University, AMAYA XTS,XT, Bravo Embroidery Machine Maintenance & Software Training.

MicroStation Everything 3D V8

MicroStation Plant Space P&ID V8

MicroStation V8 User Update

Process Plant Layout and Piping Design

Introduction to MicroStation 3D

Moving to MicroStation

Trane Air Conditioning Clinic

Asbestos Contractor/Supervisor – Refresher

PC Troubleshooting and Utilities



Contact this candidate