Resume

Sign in

Project Construction

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Salary:
negotiate
Posted:
October 16, 2016

Contact this candidate

NAME

MUKHTIAR HUSSAIN

NATIONALITY

PAKISTANI

POSITION

SR:CONSTRUCTION ENGINEER

LOCATION

GARRAF OIL FIELD IRAQ / PAKISTAN

CONTACT INFO

009647830507840/+923433555540 Email:acw21c@r.postjobfree.com

OBJECTIVE:

To have a job suitable my qualifications, promote company’s vision and help attain their goals and objectives that will benefit from my skills by rendering my service to the fullest - Available immediately & can relocate worldwide.

Current Position:

Working as a Senior Construction Engineer with Grand Energy Development Limited Chinese in GARRAF

OIL Field IRAQ since March 2015 to till to date.

Summary :

Over 22 years dedicated (EPCC) Projects management team leader (PMT), Senior Construction Engineer, Construction Manager, E&I, Mechanical team leader and Commissioning team member with extensive knowledge and strong practical and technical skills and experience in oil & gas, worked (EPCIC) projects in Garraf Oil field with Client PETRONAS and Ahdeb Oil field with Client CPECC in IRAQ since five years. Portfolio of projects includes Onshore and offshore Oil & Gas field development projects.

Specialties: Reliability/Construction/Maintenance/Commissioning/ Engineer in Oil/Gas, Piping, pipeline, Power, Water and Chemical sector in Instrumentation & Controls Discipline.

Duties and Responsibilities:

To monitor, review and, where required, approve the construction activities of the Contractor to ensure that all Mechanical, Electrical, Instrument construction activities are carried out safely and fully in accordance with Company's HSE and technical requirements.

Oversee project through analysis of available materials, capacity, and capability to determine future requirements for making inventory levels, owner requirements and interfacing with applicable personnel involved with inventory, purchasing and quality.

Ensure that the contractor adheres to the Contract specifications and that any deviations are reviewed and approved by appropriate authority.

Monitor day-to-day Project activities related to install Oil & Gas process, Oil and Gas flow lines, Fabrication of Condensate Storage tanks, interconnecting piping, Substation, CCR, Electrical equipment Instrument devices and F&G devices associated with project work.

Management of mechanical equipment in Construction and pre-commissioning work to ensure quality and technical correctness in line with drawings, specifications and technical standards.

Ensure that appropriate safety procedures are implemented during the execution of the work, which will include the review of method statements as well as witnessing at site.

Monitor Construction activities and ensure adequate Contractor resources to ensure optimum progress of the work in the all discipline and fully focus on man-hour have to meet the challenge.

Monitor the equipment’s mobilization and cost control.

Work closely with the Quality Control department to ensure the implementation of the Project QA/QC Plan.

Ensure that construction hazards and risks are fully considered by contractor and that the appropriate mitigation and actions are implemented during the construction phase. New Projects and upgrading,

Monitor the Installation of Substation, LV/MV/HV Switchgears, MCC, MPU, IRP, GCP, DCP, CCR, DCS, PLC, WHCP, IMCS, UPS, HVAC, ICCP, OHTL, Mobile Power units.

Testing of HI-Pot, Soak test, IR, Megger, Earth Leakage, loop checking, DC/AC loads testing.

Monitor Installation Telecom Panels, CCTV, PAGA, LAN, Telephone system.

Testing the Fiber Optic cables by using the OTDR to check the quality and link. FOC jointing with splicing machine, supervision of laying FOC cables with International standard.

Preparing Method of Statement, ITP, ITR, A, B, C and Procedures.

Productively involve in Execution, Quality Control and Efficiently Co-ordination with Industrial Safety, with reputed clients like PETRONAS in Garraf oil field IRAQ,CPECC in Ahdeeb oil field IRAQ, Weather ford in Zubair oil field Basra IRAQ, LUKOIL in West Qurna2 oil field, CALETHON Construction Company in IRAQ.

PROJECT TITLE:

PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) OF OIL GATHERING FACILITIES

1.Project title: EPCC (PHASE1-OFFSITE3) OF OIL GATHERING FACILITIES of Well Pads, WP-J,WP-C

2.Project No: PCIHBV/2014/P&E/569.

3.Project title: EPCC (PHASE 2 – OFFSITE 4) FOR PETRONAS PCIHBV.GARRAF OPERATIONS, of WP-E, WP-B, WP-F, GIFT, FCP.

4. Project No: PCIHBV/2013/DD/082

5.Project title: (EPCC) for Development of WP-E And WP-F (INFILL 3) For PETRONAS Carigali Iraq Holding B.V. Garraf Operations.

6.Project No. PCIHBV/2014/P&E/685.

Analyzing the scope of work and preparing BOQ/BOM of the drawings.

Ensuring project is in accordance to the project contract manual plans, procedures, AFC drawings.

Execution of the site works by deploying necessary work force, mobilizing equipment.

Controlling project activities to handover as per client satisfaction.

Reviewing TPI, testing plans, verifying, and finalizing QA/QC ITP, JMS, and ITR A B C, RFI, check sheets.

Prepare commission procedure and checklist MC, ITR B, C, RFC, RFSU, and HO for the facility to ensure the all aspects of the construction completed and ready for commissioning. To liaise with operations to ensure all necessary operational commissioning procedures and requirements are in place.

Approving the changes in the drawings as per site requirements and coordination with Engineering Department to incorporate required changes, Red Markup drawings and Final Document preparation.

Plan and focus for the effective utility of budget and resources to control cost effectively.

Review of construction site works for compliance of standards, specifications and codes for all activities & Shelter erection including commissioning and handover in all respects

Development of Field Surface Facility for Light Crude Oil wellheads, Electro-mechanical construction with Electrical and instrumentation works.

Liaise with engineering & procurement department to catch projected schedule, generate Manpower & Equipment deployment plan.

Preparing detail plan keeping in view Start-up and end dates set by Grand Energy Development LTD.

Checking the Daily progress, weekly progress & monthly progress update and monitoring from site.

SR.CONSTRUCTION ENGINEER

CALETHON CONSTRUCTION COMPANY ITALY WORKING IN ZUBAIR OIL FIELD DEVELOPMENT

PROJECT, BASRA CLIENT WEATHERFORD OIL AND GAS COMPANY IN IRAQ.

2nd DECEMBER 2014 TO 20 JAN 2015.

CONSTRUCTION MANAGER

ATTA AL THAMAR (AACC) IRAQ WITH GRAND ENERGY DEVELOPMENT LIMITED.

CLIENT PETRONAS (PCIHBV).AUGUST-2014 – NOVEMBER 2014.

PROJECT: GARRAF FINAL DEVELOPMENT PLANS GARRAF OIL FIELD AL RIFAI IRAQ.

CONSTRUCTION MANAGER:

ATTA AL THAMER OIL AND GAS COMPANY WITH CLIENT LUKOIL OIL COMPANY RUSSIAN in Basra IRAQ.

January 2014 to March 2014.

PROJECT: EPC PROJECT OF 42’’ PIPELINE EUPHARATES RIVER CROSSING OPEN CUT METHOD AT WEST QURNA 2 FIELD NEAR BASRA.

CONSTRUCTION MANAGER:

ATTA AL THAMER OIL AND GAS COMPANY IRAQ/ASAWER OIL and GAS COMPANY SUDAN

CLIENT: PETRONAS OIL AND GAS COMPANY.

MARCH 2012 TO DEC 2014

PROJECT: PROCUREMENT CONSTRUCTION COMMISSIONING OF OFFSITE FACILITIES AND WELL CLUSTERS AND WELLHEADS.WP-B, GA1, GA3, FCP, OHTL LINE GA3 TO WP-B, FCP TO WC1.

SR.CONSTRUCTION ENGINEER

BILAD AL DUHA OIL and GAS SERVICES IRAQ, CLIENT: (CPECC) CHINA PETROLEUM ENGINEERING CONSTRUCTION COMPANY AHDEEB OIL FIELD

14Feb 2011 to 6th June 2011 Ahdeeb Oil Field.

Project: Trunk lines of different Well pads, Flow lines, OGM9 and FCP.

SR.SITE ENGINEER .

GASCO OIL AND GAS COMPANY PAKISTAN FEBUARY 2006 TO OCTOBER 2010.

PROJECT: SAWAN GAS FIELD COMPRESSION PROJECT PAKISTAN.BHIT GAS FIELD EXTENSION.

CONSTRUCTION ENGINEER

PCL PIPELINK CONSTRUCTION PVT LIMITED, CLIENT OMV OIL AND GAS PAKISTAN.

PROJECTS AND SHUTDOWNS OF ENI OIL PAKISTAN, OMV AND UEP PAKISTAN.

5th January 1996 to 31 Dec 2005.

PROJECTS:

1.M/S Pipe link Construction. Client OMV Pakistan (Australia).Sawan Gas Plant at Sawan-05 wellhead

Development project Sindh. From 01 September 2005 to 31 December 2005.

2.M/S Pipe link Construction. Client OMV Pakistan (Austria) .Kadanwari Gas Plant at Miano-8 wellhead development project Kadanwari Khairpur Sindh. From 01 April 2005 to 31 July 2005.

3.M/S Pipe link Construction. Client ENI Pakistan. Kadanwari Gas Plant at K-14 wellhead & flow line installation project Kadanwari Khairpur Sindh. From 01 October 2004 to 31 March 2005.

4.M/S Pipe link Construction. Client OMV Pakistan (Austria) at Annual Shutdown of OMV Gas Plant Kadanwari Khairpur Sindh. From 01 August 2005 to 31 August 2005.

5.M/S Pipe link Construction. Client BP Pakistan Inc. Oil & Gas Plant at Ali Zaur Hydril spool able pipe project Khaskheli Badin Sindh. From 05 May 2004 to 25 September 2004.

6.M/S Pipe link Construction. Client BP Pakistan Inc. Oil & Gas Plant at Truck Deep flow line Project Khaskheli Badin Sindh. From 05 January 2004 to 31 April 2004.

7.Worked for PCL Workshop Karachi in Pipe link Construction (Pvt) Limited.

8.M/S Pipe, link Construction. Client BHP Billiton (Australia). BHP Billiton Project at Worked Zamzama Phase-1 Development Project Oil & Gas Plant Dadu Sindh. From 01 November 2002 to 20 August 2003.

9.M/S Pipe link Construction. Client BP Pakistan Inc. at Mazari Facility Upgrade Oil & Gas Project Matli Badin Sindh. From 01 April 2002 to 30 October 2002.

10.M/S Pipe link Construction. Client Clough Engineering Ltd at Sawan Gas Field Wellhead pipelines Pakistan. Oil & Gas Plant at Jabari to Rind Pipeline Project Matli Badin Sindh. From 10 December 2001 to 31 March 2002.

11.M/S Pipe link Construction. Client OMV Pakistan. Kadanwari Upgrade & Miano Gas Field Development Project of OMV Pakistan. From 07 January 1996 to 31October 2001.

TELECOM SENIOR SUPERVISOR:

PAKISTAN TELECOMMUNICATION CORPORATION LIMITED (GOVERNMENT OF PAKISTAN).

2nd APRIL 1991 TO 30 SEPT 1995 IN THE STR (I) KARACHI AND STR (V) SUKKUR.

Certification of Telecom system by PTCL.

M1,M2 and Tech2 trained by PTCL college Sukkur.

Voluntarily Trainings.

Gas, Diesel Engines, Turbine, Rotatory pumps and Generators trouble shooting trained by Allied Engineering (Caterpillar) Company Karachi Pakistan.

Auto CAD

In the 1987 got Electrical training of Single, Three Phase Heavy Motors rewinding, and Delta/Star Trouble shooting of Installation of Switchgears system, turbine in the Mehdi Engineering workshop Karachi. Voluntarily

QUALIFICATION:

B.Sc. In Major Physics In, second class from Sind University Jamshoro Sindh in 1990.

Diploma: In Electrical in first Class from Technical College Khairpur in 1996.

TRAINING INDUCTED

PTW, JHA, Confined Space, Work at Height trained by PETRONAS in IRAQ with Certification.

Hazard Study and Risk Assessment.

Certificate of Appreciation Grand Energy.

Safe Scaffolding.

Confined space Entry protocols.

Crane Inspection and Operation.

PERSONAL INFORMATION:

Fathers Name:

Qalander Bux

Date Of Birth:

26th January 1967

Passport No:

PB6893072

Languages:

English, Arabic, Sindhi, Urdu,

Availability of references.



Contact this candidate