Miroslav Dermishkov
HVAC ENGINEER
Marietta, GA 30067
***********@*****.*** - 404-***-****
Work Experience
CONSTRUCTOR OF HVAC, SYSTEMS OF NATURAL GAS, SOLAR HOT WATER SYSTEMS
NACHEV LTD -
VELIKO TARNOVO, BULGARIA
-
November 2004 to April 2014
• Designing of heating, ventilation, and air conditioning (HVAC) systems, systems natural gas and solar systems for hot water. Installation of various construction projects in compliance with norms and regulations.
• Performing the drawings in accordance with local and state health and safety guidelines and policies and fire protection codes and standards. Turning research ideas into technical plans using CAD software.
• Providing technical support for construction effort including participation in construction planning and scheduling, interpretation of design, application of construction methods, resolution and documentation of design conflicts, construct-ability reviews, etc.
• Taking into account the environmental impact of new products and their manufacturing processes and how they would be safely disposed of.
• Maintain environmental conditions by installing and maintaining both heating and cooling systems .
• Test, diagnose and repair problems in the system and propose relevant solutions.
Education
M. Sc.
TECHNICAL UNIVERSITY
2009
Bachelor
TECHNICAL UNIVERSITY
2002
Skills
Meticulous and organized, specialist in project preparation and excellent team working. Bilingual, English and Bulgarian. Fluency on Microsoft Office and AutoCad (9 years)
Military Service
Service Country: Bulgaria
Branch: NA
Rank: NA
Certifications
ORDINANCE 6 OF EUROPEAN STANDARDS FOR DESIGN AND CONSTRUCTION OF FACILITIES AND INSTALLATIONS RUNNING NATURAL GAS
Additional Information
For this period of time I have designed more than 400 domestic and industrial installations operating with natural gas. More than 100 HVAC systems for small and medium-sized hotels and office buildings. Also, many solar systems for domestic hot water.I pursued all meetings with architects and designers of buildings to coordinate these projects. For the above I have taken part in the construction, as a technical manager.The mounting group consisted of 18 people. I have also advocated the already constructed facilities at state technical control. All this work successfully and now.