R E S U M E
NAME: Andrew David
ADDRESS: ** ********* *****, *********, ******* Australia 6149
TELEPHONE: (08) 9310 2027 Mobile: 040*******
EMAIL: acvc7y@r.postjobfree.com
NATIONALITY: Australian
MARITAL STATUS: Married
LICENCES: Drivers C&R, IFAP TBOSIET, MSIC
POSITION SOUGHT: Construction Trades/Supervision/Maintenance/Commissioning
EDUCATION/QUALIFICATIONS
CITY & GUILDS LONDON INSTITUTE ELECTRICIAN’S CERTIFICATE
Bridgend Technical College, Bridgend, Wales, UK 1970 - 1975
A GRADE ELECTRICAL LICENCE
Electrical Fitter and Mechanic endorsements 1983.
TRADE CERTIFICATE OF INSTRUMENTATION
Rockingham Technical College, Rockingham, W.Australia. 1990 - 1992
REFRIGERATION & AIRCONDITIONING PRINCIPAL 1A & 1B
Carlisle Technical College, Perth, W.Australia. 1988 - 1990
ROSEMOUNT CONFIGURATION & 3200 FAULT FINDING
Rosemount Instruments Pty Ltd, Balcatta, Perth, W.Austalia
ELECTRICAL EQUIPMENT FOR HAZARDOUS AREAS (EEHA)
DETAILED INSPECTION CERTIFICATE NO: UEE0083-1-09
NOVEMBER 2014 MOXI 3 DAY REFRESHER COURSE
SUMMARY OF QUALIFICATIONS
Over 30 years experience in the electrical field, and for the past 20 years within the instrumentation field. Extensive experience in the fields of construction, start-ups, maintenance QAQC and administration. Overseas (Middle East) project exposure both construction, start-ups and supervision of national staff. Extensive experience in all forms/elements of process control, including DCS, PLC, variable speed drives electronic-pneumatic-hydraulic-nucleonic-analytical field instrumentation. Over the years I have maintained good personal education so as keep up with the changes in techniques and technology within the industry. Good communication skills at all levels.
EMPLOYMENT HISTORY
AUG 2015 – SEPT 2015
EPS
E & I Technician
Project: Curtis Island Qld
Description of Work: Construction and commissioning of all field instrumentation and DCS ESD’s Cause and effects on Greenfield Gas Plant.
SEPT 2014 – MAY 2015
CKJV GORGAN BWI
E & I Technician
Project: Barrow Island
Description of work: Commissioning of Green Fields Plant on all Instrumentation and associated fields, cause and effects. Mark up and red line drawings.
SEPT 2013 – SEPT 2014
PSA-Engineering
Commissioning Tech
Project: QGC
Description of Work: First delivery, commissioning of Gas Wellheads, cause and effects and hand over to client.
FEB 2012 –MARCH 2013
Brunel Energy
E & I Technician
Project: KTT Bass Strait
Description of Work: Commissioning of RAT and new platform electrical and instrument equipment.
AUG 2011 – JAN 2012
Wartsila Singapore
HA Inspector
Project: Montara Venture
Description of Work: Hazardous area inspections on all instrument and electrical equipment on FPSO.
MAR 2011 – JULY 2011
Apache Energy
Commissioning Supervisor
Project: Devil Creek Gas Plant
Description of Work: Construction and commissioning of all field instrumentation and DCS ESD’s Cause and Effects on Greenfield Gas Plant.
SEPT 2010 – FEB 2011
Logic Services
HA Inspector
Project: Okha FPSO Singapore
Description of Work: Hazardous area inspections on all instrument and Electrical equipment on FPSO.
APR 2010 – AUG 2010
Global Resources Network
E & I Supervisor
Project: Bayu Undan East Timor Dilli
Description of Work: Commissioning of new wells and Hot Cut Over on platform and handover to client.
DEC 2009 – MAR 2010
e2o Pty Ltd
Instrument Technician Commissioning
Project: Woodside Petrolium Pluto A (Offshore)
Description of Work: Commissioning of new upriser and all associated fields to bring gas online at the end of 2010.
MAY 2009 – NOV 2009
Global Resources Network
E & I Supervisor
Project: Bayu Undan East Timor Dilli
Description of Work: Commissioning of new wells and Hot Cut Over on platform and handover to client.
NOV 2008 – APR 2009
Transfield Worley
Inelec
Project: Goodwyn A Platform
Description of Work: GSSU Goodwyn Safety System Upgrade for drilling from installation to Hot Cut Over with
Plexel personnel and testing of systems.
APRIL 2008 – OCTOBER 2008
Brunel Energy, New Zealand
E & I Supervisor
Project: Maari WHP Project, New Zealand
Description of Work: Commissioning of Jackup Platform in preparation for down hole drilling of Well Head Platform.
Pressure test and high voltage installation to the FPSO and all other hookup activities.
JUNE 2007 – MARCH 2008
Brunel Energy, Malaysia
E & I Supervisor
Project: Maari WHP Project, Malaysia
Description of Work: Construction and Commissioning of Jackup Platform in preparation for sail down to New Zealand. Hookup of platform in Maari Field, New Zealand.
17 APRIL 2007 – 25 MAY 2007
Transfield-Worley, Perth
E & I Supervisor
Project: Woodside train 3 shutdown
Description of Work: Supervising shutdown of train 3LNG Plant. Complete overhaul of 5 Nuovo Pignone turbines. Test, commission and bring back on line, Handled all drawing mark ups documentation and the associated QA/QC for my area.
3 JUNE 2006 – 23 Feb 2007
Worley Parsons, Perth
Commissioning Specialist
Project: DBNGP Stage 4
Description of work: Based in Perth with trips to all control Gas stations to commission northern loops. Identify and resolve problems, coordinate and supervise contracted personnel. Red lining of drawings and completion of dossiers for handover to client.
15 JAN 2005 – 19 MAY 2006
Worley Parsons, Perth
HV Precom Supervisor
Project: Worsley Alumina Plant
Description of Work: Precommissioning of instrumentation and electrical work on Brownfields refinery. Delegation of daily tasks, Permit to Work procedures, and Job Hazard Analysis.
8 JUNE 2004 – 17 DEC 2004
BHP Billiton, Port Campbell
E & I Supervisor
Project: Minerva Gas Project
Description of Work: Commissioning of DCS and instrumentation on Greenfields plant and all electrical installations.
7 APR 2004 – 6 MAY 2004
Clough Offshore, Perth
Completions Technician
Project: Yolla A Platform Tasmania
Description of Work: Commissioning of platform for BASS GAS PROJECT
Electrical switchroom testing and DCS commissioning.
30 JAN 2004 – 20 FEB 2004
Broeadspectrum, Perth
Completions Technician
Project: Yolla A Platform Batam
Customer/Client: Clough Offshore
Description of Work: Commissioning of platform for BASS GAS PROJECT.
23 SEPT 2003 – 27 JAN 2004
Broadspectrum, Perth
Completions Technician
Project: Bayu Undan Gas Recycle Project
Customer/Client: Aker Clough Joint Venture
Description of Work: Construction and Commissioning of electrical and process control equipment for natural gas separation processing production and utilities platforms. Safety system testing.
27 MARCH 2003 – 29 AUGUST 2003
Clough International, Perth
E & I Supervisor
Project: Construction of Gas Plant
Customer/Client: Sawan Gas Field Project, Pakistan
Description of Work: Commissioning. QA/QC Fire & Gas.
Complete construction of Utilities and two LNG trains.
JAN 2002 – AUG 2002
Clough International, Perth
E & I Supervisor
Project: Installation of 2 turbines
Customer/Client: Kuwait National Petroleum Co.
Description of Work: Supervised installation precommissioning and commissioning of electrical instrumentation required for two General Electric compressors/turbine assemblies for transfer of 93% Hydrogen from Shuaba to MAA.
MAY 2001 – SEPT 2001
Fluor Daniel Pty Ltd
E&I Supervisor
Project: Turbine Upgrade
Customer/ Client: Western Power
Description of Work: Complete overhaul and bringing back on line of all instrumentation on this 200MW unit.
Handled all drawing mark ups documentation and the associated QA/QC for my areas of responsibility.
AUGUST 2000 – MAY 2001
SJM Electrical/Instrumentation
E/I Supervisor
Project: Plant Shutdown
Customer/Client: Western Mining Company
Description of Work:
Overseeing preparation for plant shutdown, all instruments being sent out for repair and return to site for installation. Shutdown completed in March, and now undertaking maintenance of instrumentation.
FEB 2000 - JUNE 2000
McConnell Dowell
Instrument Supervisor
Project: Plant Instrumentation Upgrade
Customer/Client: Aramco Saudi Arabia
Description of Work:
Instrument Supervisor overseeing all daily activities of Indian/Phillipino nationals of the plant upgrade of Instrumentation for Aramco Saudi Arabia. Daily activities included the rectification of engineering problems, procurement and installation of additional equipment/materials associated with the Yokogawa DCS and the ABB ESD control systems. Systems re-testing and re-certification. Handled all drawing mark ups documentation and the
associated QA/QC for my areas of responsibility.
SEPT 1998 – Dec 1999
AOC Brown & Root
Instrument Electrician
Project: Plant Instrumentation upgrade
Customer/client: WAPET
Description of Work:
Calibration, installation and commissioning of electronic, pneumatic and mechanical elements of the platform’s control system. Field instrument work including (Rosemount and Honeywell equipment) with a Yokogawa system as the main control system. General instrument QAQC works, cabling, small bore tube installation, loop tie-ins and general platform duties.
MAY 1990 – SEPT 1998
Tiwest, Kwinana, WA
Instrument Electrician/Supervisor
Project: Mineral Sands Project, Kwinana WA
Customer/Client: Tiwest
Description of Work:
Employed initially for plant commissioning and start up of the Rosemount Systems 3 DCS and its associated field controls. After the commissioning stage I was employed as part of the plant’s maintenance team working 12 hour rotating shifts. My duties involved preventative maintenance, plant modifications, breakdown repairs and maintenance planning. I worked on equipment such as Rosemount DCS systems 3, ABB PLC5, PC SCADA, Siemens S5 PLC and a huge range of field instrumentation associated with the plants main stream process and its utilities.
REFEREES
MR DWAYNE VESELY Lead Instrument Engineer
Aker Solutions
Phone: 042*******
MR CHRIS STATTON Project Manager
Minerva Gas Plant, Victoria
Phone: 040*******
NORMAN KIRWAN-WARD Commissioning Manager
Worley Parsons, Perth
Phone: 041*******