R.Anthony Garcia
> > > > > > **** Queens Rd Apt *7, Pasadena, TX 77502
> > > > > > > Cell ph 832-***-****
> > > > > > I have my TWIC CARD and BASIC PLUS
> > > > > > >> I have my SITE SPECIFIC for, TARGA TERMINAL, ENTERPRISE
MORGANS POINT, ENTERPRISE MONT BELVIEU, BRAZOSPORT PHILLIPS 66 SWEENY
PHILLIPS 66 FREEPORT BASF FREEPORT
> > > > > > I have my CONFINED SPACE, FIREWATCH, SCAFFOLD, SUPPLIED AIR,
AUDIO
> > > > > > > I have my RESPIRATOR FIT TEST CARD
> > > > > > > Email address ***********@*****.***
> > > > > > >> Objective: Eager to grow within a company. Fast learner,
cooperative, punctual, trustworthy, good people skills, hard worker.
> > > > > > >
> > > > > > > Education: Sam Rayburn HS 2003 Graduate, San Jacinto College
Central La Porte Tx-2002-2004 Criminal justice, Crime in America, welder
introductory I-2004
> > >
> > > Ashton Sawing & Drilling 03/16 to current at Clear Creek High School
Phillips 66 Cavern Well Project and BASF FREEPORT
> > > Carpenter Rodbuster Concrete Finisher setup laser shoot the points
and the elevations build batter boards and set and wreck simon forms set
the bolts on piers baseplates turnbuckles kickers strong backs pencil rods
forms to pour and bush concrete build mattes of rebar with figure 8s chokes
and saddles use bulfloats trouts and float to finish concrete and dry pact
use power streed power trowel and power tools saw drills concrete, come
alongs, dig and vibrator
> > >
> > > PCL CONSTRUCTION 09/15 to 03/16 at the PHILLIPS 66 Sweeny Carpenter
Rodbuster Finisher build boards and set and wreck simon forms set the
bolts on piers baseplates turnbuckles kickers strong backs pencil rods
forms to pour and bush concrete build mattes of rebar with figure 8s chokes
and saddles se bulfloats trouts and float to finish concrete and dry pact
use power streed power trowel and power tools saw drills concrete, come
alongs, dig and vibrator
> > > > > >
> > > > > > PERFORMANCE Contractors 03/15 to 09/15 at the ExxonMobile NAG
PROJECT IN MONT BELVIEU, I am a, Carpenter Rodbuster Finisher build
boards and set and wreck simon forms to pour and bush concrete build mattes
of rebar with figure 8s chokes and saddles ties use bulfloats trouts and
float to finish concrete and dry pact use power streed power trowel and
power tools saw drills concrete, come alongs, dig and vibrator
> > > > > >
> > > > > > > Decker Finishing 07/14 to 03/15
> > > > > > At the Exxon Mobil NAG Project in Mont Belvieu and Fort Polk
Louisiana I was a Carpenter Finisher Rodbuster Top Helperbuild batter
boards and set simon forms to pour concrete build mattes of rebar with
figure 8s chokes and saddles ties use bulfloats trouts and float to finish
concrete and dry pact use power streed power trowel and also soof cut saw
to cut concrete, come alongs, dig and vibrator
> > > > > >
> > > > > > > S&B 01/14 to 07/14 Carpenter Rodbuster Top Helper Finisher at
Enterprise Morgans Point assit building single and double mattes,reading
the blueprints, dressing piers using dials, bands, standys, finding the
center on mattes off the batter boards,tieing rebar wit choke, figure 8,
saddles, snap, hog, column ties, 50% ties,level mattes wit bricks 2 in.
clearance,using bolsters,clean up wire with magnet,grind off concrete with
grind to clear QC, running the vaccum hose when pouring concrete,using
bobcat and fortlift and grade compactor,running string lines,digging
trenches,using turn buckles, wall surveying, building and setting and
finishing forms,setting, pouring 9 to 10 yards a truck, grout mixing
leveling, drilling holes for foundation around tanks for piperack, digging,
flagging for excuvator, using berlaps and brushes,drilling
bandsaw,sawing,pumping water,wrecking form,setting the grade
> > > > > > > > > > > > >
> > > > > > > > > > > > > > > > > > General Petro Chem 08/13 to 01/14
Carpenter Apprentice Rodbuster Helper Finisher Helper at Lubrizol Deer Park
and Targa Terminal in Galena Park assit building single and double
mattes,reading the blueprints, dressing piers using dials, bands, standys,
finding the center on mattes off the batter boards,tieing rebar wit choke,
figure 8, saddles, snap, hog, column ties, 50% ties,level mattes wit bricks
2 in. clearance,using bolsters,clean up wire with magnet,grind off concrete
with grind to clear QC, assit in shooting the points and reading the
blueprints,building batter boards braces and kickers,running the vaccum
hose when pouring concrete,using bobcat and fortlift and grade
compactor,running string lines,digging trenches,using turn buckles, wall
surveying, building and setting and finishing forms,setting and tieing
rebar and cutting, pouring 9 to 10 yards a truck, grout mixing leveling,
drilling holes for foundation around tanks for piperack, digging, flagging
for excuvator, using berlaps and brushes,drilling bandsaw,sawing,pumping
water,wrecking form,setting the grade
> > > > > > > > > > > > >
> > > > > > > > > > > > > > > > > > Bowen Engineering 02/12 to 08/13
Carpenter Apprentice Rodbuster Helper Finisher Helper at Kinder Morgan
Pasadena Plant assit building single and double mattes,reading the
blueprints, dressing piers using dials, bands, standys, finding the center
on mattes off the batter boards,tieing rebar wit choke figure 8, saddles,
snap, hog, column ties, 50% ties,level mattes wit bricks 2 in.
clearance,using bolsters,clean up wire with magnet,grind off concrete with
grind to clear QC, assit in shooting the points and reading the
blueprints,building batter boards braces and kickers,running the vaccum
hose when pouring concrete,using bobcat and fortlift and grade
compactor,running string lines,digging trenches,using turn buckles, wall
surveying, building and setting and finishing forms,setting and tieing
rebar and cutting, pouring 9 to 10 yards a truck, grout mixing leveling,
drilling holes for foundation around tanks for piperack, digging, flagging
for excuvator, using berlaps and brushes,drilling bandsaw,sawing,pumping
water,wrecking form,setting the grade