Muhammad sharif
E-Mail: acufmk@r.postjobfree.com
Cell No.: +964**********, +923*********, brother #+923*********
C. Address: Shat Al-Basra Power Plant 1250MW Basra Iraq
P. Address; chak no#18 MR p/o same Tehsil & District Multan-Pakistan.
Objective:
Keep on learning to construct me dexterous to source efficient & effective service in Power Project’s Construction Execution and Operation & Maintenance department for achieving organizational goals.
Career Summary:
06years’ experience (1 Years 6 month in Gulf) with well recognized EPC Companies Power Project’s Construction, Exrecution and Operation & Maintenance.
Education:
Bachlor of technology in Electrical ( B Tech Pass) from BZU Multan.
Diploma Associate Engineering in Electrical from ( D A E Electrical) PBTE Lahore.
Matric in Science from BISE Multan.
Special Courses / Diplomas:
Diploma in Information Technology (DIT) certified by Punjab Technical Board Lahore (Duration 6 month).
Experience:
Employer:
AEPL OASIS Engineering Company LLC Basra Iraq ( Client-IFC )
Project:
Shat –Al-Basra Power Project 1250MW Basra Iraq
Designation:
E,Iand C Commissioning Technician
Duration:
August 2014 to Date
Responsibilities:
Knowledge of electrical.control,power,intrument and electronics.
We'll know about the Following Systems Installation,commissioning and operation
10*125MW Gas Turbine Frame 9E (General Electric)
400KV &132KV Gas Isolated Substation (GIS) System.(Hyosung Korea)
5 No of Transformers 350MVA (Hyundai Power )
12 No's of 6.6KV Switch Gears (ABB)
Isolated Phase bus duct 15KV for Transformers (Alfa Standard Korea) )
Bop System
Plant Earthing System
Assembling of HT panels, switchgear, Synchronizing panels.
Responsible for any type of correction / modification made in the IFC Drawings as per requirement at site has to notify the same in As-Built drawings.
We'll k ow about Reading the single line,interconnection and schematic drawings LV,MV.
We'll know about lv,mv control.power and instruments drawings.
Well know about MV,LV and intruments Troubleshooting, fault finding.
We'll know about MV,LV interlocking.
Control the Operation ccr.
We'll about p & id,
Installation and commissioning of switch gear and control termination...Generator Unit Circuit Breakers,
HT kits,
Installation and commissioning of electrical panels & DCS panel for Control Room.
Bentry connection and testing.
Meggering,continoutie. Pre commissioning test. Commissioning test.
Relay,breaker,connactor tests.
Calibration pressure switch.pressure transmitter.ragulator. solenoid vavle.limit switch. Etc
Operation and control 9E turbine.
Commissioning DCS control system.
Dcs controller we'll know about dcs R & S (UCCX,UCSA) controller.
We' ll know about UCCX controller operation and maintenance.
We'll know about DCS PD's card( pwer distribution system).
We'll know about terminal board and I/O packs and it's operation and maintenance.
We'll about AI,AO,DI and DO signals.
We'll know about DCS Network cabinet and it' s switchs.
We'll know about ethernet cables and its colour coding and also about RJ 45 connector.
We'll know about optical fiber patch cards.
We'll know its looping between smart rack and DCS network cabinet.
We'll know about smart rack & its looping with DCS controller MV,LV and EDG.
Working on fire fighting system. SANCO panel.
Battery charger AEG work on DCS signals & troublshooting of all DCS signals and its internal and external faults troubleshooting and well know about its schmetic daigram.
Inverter AEG worked on DCS signal and troubleshooting of all dcs signals and internal and external fault and we'll know about its schemtic daigram.
We'll know about UPS(ce) distribution panels and work on its dcs signals.
Employer:
A.T.S SYNTHETIC PVT LTD. LAHORE
Designation:
PLANT OPERATOR
Duration:
Nov 2013 to June 2014
operation:
12.9 MW
Responsibilities;
Good Command over operation of gas and diesel genets. (QSV-91 G, CAT 3512, CAT 3412, CAT 3306 B, KTA-50, KTTA -19),
Ensure un-interrupted power supply to mills.
Troubleshooting,synchronizing gensets.
To maintain log sheets and operational data according to proper manners.
To perform the routine maintenance of engines.
Check and prepare the stand by Auxiliary system for emergency us
Regular monitoring and up keep of water treatment system.
Adopt a creative app roach to problem solving through use of excellent technical skills.
To discuss problems with higher management regularly.
Carried out without any risk to plant or personal.
Power factor improving.
Power supply maintain.
Fault finding.
Employer:
Izhar construction pvt ltd. Jccobabad
Designation:
Electrical Technician
Duration:
july 2011 to June 2012
Project:
Jaccobabad shahbaz air base.
Responsibilities;
Worked in panel termination, as well as routine maintenance
Control and power cable laying.
Cable dressing.
Multistage building wiring.
Employer:
Albario Engineering (Pvt.) Ltd. (Supplied to Client-CKD Export/GE Energy)
Designation:
Electrical Technician
Duration:
march 2009 to feb 2011
Project:
234 MW Combined Cycle Power Plant Muridke, Punjab Pakistan
Responsibilities:
Installation & assembling for oil treatment of 3x105MVA, 2x13MVA Power Transformers.
Installation of Cable trays, laying, testing and termination of MV, LV and control Cables. MV, LV and control panels installation and cable terminations.
Termination of control and switch yard instrument cables
Trouble shouting and loop testing. Cable laying
Installation of switch gear and control termination.
Personal Information:
Father Name:
ALI Muhammad
Date of Birth:
02 FEB 1991
Marital Status:
Married
CNIC #:
36303-5733582-7
Nationality:
Pakistani
Passport #:
EE5125821