Post Job Free
Sign in

Manager Project, QC Manager, Construction Project Manager

Location:
San Antonio, TX, 78260
Posted:
June 04, 2016

Contact this candidate

Resume:

CARLOS NARANJO, P.E

***** ****** *****, *** *******, TX 78260 210-***-**** – ***********@*****.***

PROJECT/CONSTRUCTION MANAGER

Experience Managing Civil Engineering and Environmental Projects to Successful Completion

PE-licensed senior project manager with experience directing large-scale federal and municipal projects.

Managed complex, multiphase and high-profile engineering projects. Able to address financial constraints and complicated logistics to overcome project challenges.

Excel in collaborating with clients, contractors and government agencies to meet or exceed design, quality, schedule, and budget expectations.

EXPERTISE

Project Management: Design-Build Management, Project Plans & Documentation, Engineering Cost Estimates, Cross- Functional Team Supervision, QA/QC, Client Liaison, Subcontractor Management,

Engineering Disciplines: Civil Engineering, Environmental Engineering, Mining Engineering

Technical Tools: Civil CAD, Primavera Project Management, MS Project

EXPERIENCE

Nova Group May 2015 to Present

Quality Control Manager, Napa, CA

Construction quality control manager to Replace Hydrant Fueling System Holloman AFB New Mexico

Ensuring quality and project deliverables are met. In this position I ensure that all quality and project deliverables are met. Duties included the following:

Generated Work Plans, Accident Prevention Plan, Environmental Management Plan, Storm Water Pollution Prevention Plan, and Quality Control Plan.

Implement and manage QC Program

Attend Preconstruction and Coordination and Mutual Understanding Meetings

Manage and coordinate three phases of control for all features of work

Perform three phases of control NOT designated to QC Specialists

Prepare daily QC reports

Perform QC submittal review and approval

Maintain submittal register

Maintain up-to-date set of as-built onsite

Provide QC certification and documentation including monthly invoice certification and completion of work certification

Perform punch-out and participate in pre-final and final acceptance inspections

Ensure all required keys, O&M manuals, warranty certificates and as-built drawings are correct, complete and submitted to the Contracting Officer

Assure that all applicable tests, special inspections and observations required by the contract are performed

Manage and coordinate QC Specialists and Testing Labs

Notify Contracting Officer Representative of any proposed changes to QC Plan

Familiar with the requirements of EM 385-1-1

Tepa LLC Aug 2014 to May 2015

Quality Control Manager, San Antonio, TX

Construction quality control manager for structural repairs at NAS Kingsville, TX

Ensuring quality and project deliverables are met.

Project includes:

Generated Work Plan, Accident Prevention Plan, Environmental Management Plan and Quality Control Plan

Submitted all preconstruction documents; erection plan, containment plan, scaffolding plan, structural steel repairs plan, abrasive blasting and coating plan

Maintaining strict adherence to the Delivery Order, design and specifications requirements

Continuously assessing the changing needs of NAVFAC NAS Kingsville, TX and proactively requesting feedback on our performance

Ensuring all staff assigned to the project are qualified, experienced, trained, and have the aligned attitude for high-quality and responsive service to our client

Providing adequate equipment and resources to meet the client’s needs

Quality Control of abrasive blasting, coatings (primer, intermediate & topcoat), scaffold and containment installation

Auditing and assessing performance to identify aspects of the work to improve and to continuously be in the process of creating the “next edition” of these improved services.

North American Development Bank, US/Mexico Border Nov 2013 to Aug 2014

Consulting Services for North American Development Bank, US/Mexico Border

Design and construction management for water, waste water, and waste water treatment plant projects through EPA grant programs.

WWTP projects include rehabilitating the existing WWTPs by converting the process from a lagoon system to an oxidation ditch system with effluent capable of meeting Class A+ Reclaimed Water Standards. As a sustainable development effort, the WWTP will include high efficiency equipment in headworks, secondary treatment, disinfection and wastewater pumps as well as solar power, which will be defined during the final design development.

Verify costs estimates and regulatory compliance (NPDES, SWPPP)

Administration and financial tracking of projects

Water projects include the installation of piping and portable water treatment trailers as temporary solution to potable water requirements until additional EPA and USDA funding is available for permanent treatment.

CAPE Environmental Management, Inc., Bogota, Colombia, San Antonio, TX April 2012 to July 2013

Senior Engineer

Senior Civil Construction Engineer responsible for new airport hydrant system civil construction. Responsibilities include excavations for fuel hydrant systems, material ordering and scheduling, proposals and costs, document interpretation, Quality Assurance/Quality Control, and subcontractor field supervision and management. Instrumental in completing Phase I & II on schedule.

Supported Joint Base San Antonio Performance Based Remediation that includes Landfill Capping, PCB Excavations, Groundwater/Surface Water Compliance Monitoring, UST/OWS Site Closures, and Exit Strategies for Landfills, and Groundwater Treatment.

Generating all pre-construction documents: Environmental Permits, Work Plans, Specifications, Health and Safety Plans, Construction QA/QC Plans, Sampling and Analysis Plans and Quality Assurance Program Plans.

J2 ENGINEERING, San Antonio, Texas April 2010 to April 2012

Senior Construction Manager/Corporate QC Manager

Construction and QC manager for Design Build Task Orders at Holloman AFB that included:

Tenant area improvements, electrical system upgrades, dismantling and removal of existing infrared heating systems, installation of new HVAC systems, preparation and repair of the existing roof, and improvement of interior wall finishes

Tested and balanced all new mechanical systems, produced O&M manuals and provided training. Developed Subcontractor Scopes of Work, Subcontracting Plan, Work Plan, Health and Safety Plan, Quality Control Plan, Managed Bidding Process and Bid Reviews (Mechanical, Electrical, Architectural). Assisted in site safety, quality control.

Concrete slab construction QC.

Managed and verified that the three phase system of QC control (initial, preparatory and follow-up) was completed as design and construction progressed. Coordinated final testing and certification, in addition to providing “as-built,” drawings and all related close-out and O&M documentation.

Conducted safety meetings, site management, daily reports, and work in progress meetings.

HDR e2M, Kuwait City, Kuwait January 2008 to March 2010

Middle East Project Coordinator

Ensured effective operations management of a $12M architect and engineering services contract while providing design and construction oversight in support of the Area Support Group-Kuwait, including design of 12 joint use facilities valued at more than $45M that included cast in place concrete.

Maintained on-site quality, performance and environmental compliance.

Managed subcontractors, conducted client coordination, safety audits, and design reviews.

Coordinated with a local Kuwaiti-owned architect and engineering firm.

Played an instrumental role in forming a master service agreement with a Kuwaiti program management firm to expand relationships with local engineering and consulting service companies.

Oversaw eight preventive maintenance and two 4P A&E task orders in Kuwait for HVAC, generator, lift station, and security barrier maintenance.

Managed Title II services for electrical repairs and inspections as well as construction oversight.

Coordination and work in progress meetings with all stakeholders.

TolTest, Inc., Naval Station Rota, Spain June 2006 to January 2008

Senior Project Manager

Managed 8 task orders consisting of annual Cathodic protection maintenance, calibration of meters and gauges, hydrant maintenance, government vehicle station maintenance, cut & cover tank repairs, electrical cable replacement at bulk fuel farm, and fiber optic installation and environmental maintenance of fuels distribution system.

Project Manager for TO080 for preventive maintenance, repair and equipment and systems replacement at Naval Station Rota, Spain. Work performed under this TO included maintenance on the following systems: Project ROT 05-4: Cathodic Protection Maintenance; Project ROT 05-11: Aircraft Refueling Hydrant System Maintenance; Project ROT 05-13: Marine Load Arms Maintenance; and Project ROT 05-14: Vehicle Fuel Station Maintenance. Tasks included submittal of annual inspection Work Plan that included: initial inspections, recurring work, preventative maintenance inspection and service, incidental/minor repairs and replacement parts, emergency response and service calls and as needed work calls. Required submittals included: initial inspection reports, monthly performance reports, certification of performance, and a monthly preventive maintenance Work Plan.

Project Manager/Site Safety Officer for repair work that included the removal of shell corrosion, vacuum box testing, repair of nozzles and gravity lines, installation of slotted sample tubes, installation of tank ladder fall arrest device, installation of safety detonation devices (SDD) and pressure vacuum (PV) valves on tank vent lines, and repairs to tank shell stiffener drainage holes. Additional activities included tank bottom repairs, tank shell repairs, sump pit repairs, spot coating, and interior coatings on the tank floor, shell, and roof. The tasks required to effectively pre-plan the project to ensure a comprehensive and responsive approach to completing the project in accordance with the approved design and specifications; Performed the project in a professional manner, in accordance with the design and specifications, to meet the expectations of the user; Performed the project with no lost-time incidents and zero accidents; Provided the quality testing and monitoring necessary to complete the project in accordance with project specifications and applicable guidelines; Provided the necessary administrative and management controls to ensure the project was executed according to the project plans, specifications, and all applicable regulations; Performed the project within the proposed schedule and under budget, with administrative controls providing accurate documentation and project reporting.

Project Manager for replacement of electrical lead-coated cables with copper power cables at the following fuel tank locations: Tank 2, Pump 2, Tank 8, Pump 2, Tank 9, Pump 2, Tank 9, Pump 3, Tank 11, Pump 3, Tank 13, Pump 2, and Tank 17, Pump 2. The existing cables were constructed with lead and are over 50 years old. TolTest also provided an electrical design that met the minimum requirements of NFPA 70, NFPA 77, and NFPA 780.

INNOVATIVE TECHNICAL SOLUTIONS, Cannon AFB, New Mexico November 2002 to June 2006

Senior Project & Construction Manager

Managed a $4.5M U.S. Air Force construction and repair delivery order at Cannon AFB, New Mexico centered on paving repair and reconstruction.

Worked closely with base civil engineering, base operations, and Air Force contracting to ensure activities were completed with minimal disruption to F-16 flight operations.

Managed task order to repair the wastewater treatment plant’s aerobic digester as well as two HVAC tasks at the refueling maintenance shop.

Managed RFI’s and change orders.

Certified all employees and subcontractor personnel safety training, subcontractor insurance requirements and bonds.

INNOVATIVE TECHNICAL SOLUTIONS, Baghdad/Basrah, Iraq (June 2004 to November 2005)

Senior Project & Construction Manager

Directed repair and renovation of 57 fire stations throughout Iraq with a total contract value of $21 million.

Construction project manager of a $38M contract for the construction of an Iraqi Police Service (IPS) Academy and Public Order Battalion (POB). Tasks included proposal generation, technical reviews, subcontractor management, and contract award kickoff meetings.

Coordinated design and construction services for 8 buildings (6 barracks, 2 offices) and 2 dining facilities located adjacent to Shaibah Logistics Base in Basrah, Iraq.

Jobsite administration and field supervision of subcontractors.

Concrete pour supervision and quality control.

Schedule and budget control.

Design management.

ATC ASSOCIATES/INFORMATICS, San Antonio, TX May 2001 to November 2002

Branch Manager

Revamped the branch office and restructured personnel and projects to improve efficiency and maintaining P&L accountability.

Oversaw projects in construction management, environmental site assessments, remedial design, regulatory compliance, property condition assessments, and asbestos/lead/mold assessments.

Facilitated A&E projects and provided QC for construction technical documents.

Managed geotechnical services (concrete/asphalt testing, compaction testing) for City of San Antonio

BEASLEY ENTERPRISES, Ahoskie, NC December 1999 to May 2001

Environmental Division Team Leader

Managed environmental division staff, spearheaded business development strategy, established standard operating procedures, managed site assessments, and introduced corrective action plans.

Oversaw remediation for a startup environmental services division of a fuels distribution company in North Carolina, including 28 petroleum and chemical contaminated sites.

Lead emergency response team for environmental incidents and investigations.

Conducted air and groundwater quality monitoring and reporting.

Conducted environmental audits.

Acted as principal engineer responsible for fuels distribution construction repairs.

MAXIM TECHNOLOGIES, Salt Lake City, UT May 1998 to December 1999

Senior Technical Manager

Provided leadership of project management and marketing at the regional level.

Directed P&L of the Salt Lake City branch office in addition to supervising and training staff.

Served as the regional technical manager for national contracts with major companies across energy, mining, utility, and oil/gas pipeline industries.

Conducted construction management and materials testing at several sites in Utah

Concrete Tilt Wall Construction (Abbott Laboratories)

Played a vital role in transforming a large construction project in order to meet budget and schedule milestones prior to the company being sold.

AES/DISAB, Buenos Aires, Argentina September 1996 to May 1998

General Manager/Operations Manager

Oversaw P&L management, financial reporting, invoicing, project planning, coordination, and scheduling for a joint venture company in Argentina.

Provided construction and project management of service station and refinery repairs in Argentina.

Steered environmental site investigations, remedial design, regulatory compliance (air and water), risk analysis, and cost estimating for ESSO, BP, YPF, EG3, and Shell refineries and retail outlets throughout Argentina.

Led emergency response, site investigations, and remediation of pipeline spills in Northern Argentina.

Conducted remediation system installations for major oil companies in Argentina.

Ogden Environmental / Optech, Knoxville, TN and San Antonio, TX September 1990 to September 1996

Senior Project Manager / Deputy Program Manager

On a Team that managed a $50 million nationwide contract for professional and technical services component of environmental projects, including involvement in proposal preparation.

Directed remediation and compliance activities at U.S. Air Force and Air National Guard Bases throughout the United States under this $25 million AFCEE Remedial Action Contract.

Prepared quality program plans, health and safety plans, sampling and analysis plans, final reports, cost analysis/proposals, and Cost Performance Reporting (CPR).

Community relations (Mass. Military Reservation and Several Landfills in Tennessee)

Sanitary, Hazardous Waste and Fly ash landfill design, compliance wastewater monitoring, underground storage tank/hydrocarbon remediation.

Conducted Preliminary Assessments (PA) of potential hazardous sites, Site Investigations (SI), Remedial Investigations (RI), Feasibility Studies (FS), Remedial Design (RD) and oversight of Remedial Action (RA), and development and implementation of long-term monitoring plans.

Provided subcontractor management and conducted environmental and safety audits on behalf of DOE and DOD.

EDUCATION

BS in Civil/Mining Engineering, University of Arizona

Professional Engineer (PE), KY #10668, TN #22156, TX #79474, NCEES #17619, LA #E26415, UT #376-***-****, NC #025673, VA #040*-******, FL #59974, NM #1658, OK #21855-2005.

Certifications, OSHA 132 Hr. Professional Program, OSHA 30 Hr. Hazard Recognition for Construction Industry, 2014; OSHA Competent Person for Fall Protection, Cranes/Rigging & Scaffolding 2015, USACE Construction Quality Management, 2014; OSHA HAZWOPER 8 Hr Refresher, 2014; Biohazard Training 2001; Incident Command Training, 2002; OSHA 40 Hour 1990



Contact this candidate