Post Job Free
Sign in

Engineer Manager

Location:
Durban, KZN, South Africa
Posted:
March 03, 2016

Contact this candidate

Resume:

March *, ****

Andrew Govender

* ******** ****, *********, ******** West

Durban, 4037

078*******

***********@*****.***

To whom it may concern,

My name is Andrew Govender and I am currently employed as a Project / Industrial Engineer, responsible for planning, leading, organizing and controlling all personnel and activities in the Durban area related to current production and new projects from initiation through to start of production. I implement industrial engineering techniques and use lean manufacturing strategies to control efficiency and throughput across all the production sectors.

I have implemented numerous continuous improvement and lean manufacturing techniques along with my project management skills that have led to massive savings in my 6 years of experience as an industry professional. I currently hold a Bachelor of Technology Degree in Industrial Engineering obtained from the Durban University of Technology.

I am a motivated & a proactive individual, who is enthusiastic and willing to learn and ask questions. I have excellent interpersonal and communication skills, with the ability to communicate with all levels within the organization. I have a desire, drive to get things done, and I am very goal orientated individual. I have the ability to translate information effectively and efficiently. I am PC literate, with excellent Computer skills.

Regards

Andrew Govender

KEY SKILLS: . Motivated & a proactive individual, enthusiastic and always willing to assist or learn

. Applying Lean Techniques i.e. 5s, 7 wastes, heijunka, kanban and developing kaizen mindsets

. Excellent interpersonal and relationship building skills, and ability to communicate with all levels

. Analytical skill, ability to translate information effectively and efficiently

. Continuous Improvement strategies, suggestions and key implementations

. Project Management

. Excellent communications and listening skills

. Honest, confident and approachable.

. Excellent Computer Software Skills

NOTICE PERIOD: 1 calendar month

EDUCATION / QUALIFICATIONS & INTERESTS

Senior Education: Matric Senior Certificate – Merit Exemption 2007; Hillgrove Secondary School

Subjects: English, Afrikaans, Biology, Mathematics, Physical Science, Computer Studies (All HG)

Tertiary Education: Bachelor of Technology in Industrial Engineering

Durban University of Technology – 2015

National Diploma in Industrial Engineering

Durban University of Technology – 2014

Other Education: Advanced Training PUR Laminating Machine

Web Processing- November 2011

Performance Rating

Productivity Assignments - October 2010

Activity Sampling

Productivity Assignments – April 2010

First Aid Level One

Amandlolwazi Training Centre – May 2012

Polyworks Metrology & Reverse Engineering Software

Amandlolwazi Training Centre – May 2012

ISO 31000 Risk Management

Risk ZA – May 2014

Advanced Excel

Excel with Business – Current (Online Course)

SYNOPSIS OF WORKING EXPERIENCE

Grupo Antolin {Automotive Headliner Manufacturer Amanzimtoti}

Position Held: Project Manager / Industrial Engineer

Duration: June 2014 – Current

Responsibility:

Overall responsibility for coordination of all activities within 2 ongoing projects

Quantum Project (R 3 000 000) Closed with a saving of R470 000

Hilux Project (R 8 000 000) SOP – Current Saving is R 345 000

Reach project objectives regarding the short, medium and long term milestones

Conduct phase reviews and phase closures according to the Grupo Antolin procedures established

Perform documentation in accordance with TS16949 Quality Systems

Create initial BOM structure and optimize in accordance with ECR’s (Engineering Change Requests)

Liaise with customers, suppliers, service providers and all internal departments to ensure success of project

Reduce Co2 emissions – Carbon Footprint initiative – Send company truck for individuals within a 10km radius to prevent employees using their personal vehicle to work, install Perspex sheets onto roof to use natural lighting when sufficient for a specific process, method study completed to reduce number of forklifts from 2 to 1, installed energy saving bulbs inside factory

Implement line balancing techniques – Using Simul8 software, I designed a simulation of the production line to compute efficiencies, idle times of operators, production outputs based on expected volumes and line manning

Develop method improvement programs

Create all technical data sheets – Update as the project continues – record all engineering changes, material usages, graphical representations of headliners

Analyze all inefficiencies in the production system, create material process flows and monitor / improve

Create corrective action plans and implement where necessary

Implement downtime reduction programs

Implement effective batch changes including tool changes

Define work instructions and visual controls

Implement & Update FMEA and control plan measures

CNC Machinery : Adjusting and fine tuning the waterjet program on ABB robots – adjusting points on periphery when needed, backup or restore the robots

Training of operators and line leaders according to the work instructions

Submit regular reports on project performance against project budget and justify if cost is elevating beyond budgeted amount

Submit weekly updated timing plans to all involved in project activities

Submit monthly reports on progress to Burgos – Spain HQ

Profibre Products {GRP Product Manufacturers Pinetown}

Position Held: Junior Industrial Engineer

Duration: July 2013 – June 2014

Responsibility:

Project Engineer for new ALSTOM initiative

Designed a new layout including new machinery specifications for the project

Sourced manufacturers and suppliers of building equipment, racking etc.

Calculated manning required, capacity that can be achieved

Estimated cost saving of R 7 600 000 to affirm new layout with improved operating methods

Designing new methods, equipment, processes, work flows

Managed all aspects of 5s and conducted routine audits to ensure ISO 14000 and ISO 9001 was upheld

Ensured correct BOMS, Work Instructions and Test Procedures are in place

Cost saving and improvement suggestions and implementation.

Bright Idea Campaign created and gained management and employee buy-in

Created database in Microsoft Access to keep record of achievements

Communicating and building strategic partnerships to smooth continuity of changes

Time and Method Studies and reviewing of targets

Generate control documents and work, test procedures

Production Planning making use of Microsoft applications in conjunction with Industrial Engineering principles and techniques eg. Gantt charts, FIFO ( First In First Out )

Implementation of Quality charts, slogans and alerts

Assisting in training and development of employees

Source equipment from various suppliers

Design new equipment using Google Sketchup

Use Lean Manufacturing Techniques to improve process flow, floor layouts and balance production lines in order to increase efficiencies.

Value Stream Mapping, PFMEA, Line Balancing

Conlog SA {Prepaid Electricity Meters Manufacturer – Electricity / Electronic Industry}

Position Held: Production Team Leader PROMOTED TO Junior Industrial Engineer

Duration: Sept. 2012 – June 2013

Responsibility:

Production Team Leader responsibilities :

Involved in promoting and utilizing the Schneider Production System

Managing the performance and output of production teams and cells

Chairing Production SIM meetings and managing effective action plans from them

Managing all aspects of 5s and conducting routine audits

Generating selected reports off SAP

Ensuring correct BOMS, Work Instructions and Test Procedures are in place

Use RED/GREEN analysis to ensure timely delivery of products / reducing downtime

Cost saving and improvement suggestions and implementation.

Communicating and building strategic partnerships to smooth continuity of production

Time Studies and reviewing of targets

Supervision of approx. 60 employees on production floor

Production planning making use of Microsoft applications in conjunction with Industrial Engineering principles and techniques eg. Gantt charts, FIFO ( First In First Out )

Implementation of Quality charts, slogans and alerts

Assisting in training and development of employees

Maintaining all production records

Use Lean Manufacturing Techniques to improve process flow, floor layouts and balance production lines in order to increase efficiencies

Junior Industrial Engineer responsibilities :

Developed a project plan to set up a plant in Angola

Annual cost saving of R 85 000

Communicating and building strategic partnerships to smooth continuity of changes

Time and Method Studies and reviewing of targets

Generate control documents and work, test procedures

Production Planning making use of Microsoft applications in conjunction with Industrial Engineering principles and techniques eg. Gantt charts, FIFO ( First In First Out )

Implementation of Quality charts, slogans and alerts

Assisting in training and development of employees

Source equipment from various suppliers

Design new equipment using Google Sketchup

Utilize Microsoft Access to create databases for products

Designing new methods, equipment, processes, work flows

Managing all aspects of 5s and conducting routine audits

Generating selected reports off SAP

Ensuring correct BOMS, Work Instructions and Test Procedures are in place

Use Lean Manufacturing Techniques to improve process flow, floor layouts and balance production lines in order to increase efficiencies.

D B Apparel (Pty) Ltd ( Ex Playtex South Africa ) {Textile Industry}

Position Held: Laminating Supervisor

Duration: Sept. 2011- Aug. 2012

Responsibility:

Layouts & Facilitate work & process instructions

Define and implement production processes.(material flow).

Maintain training records for all inspectors and machine operators.

Facilitate corrective action in line with quality system.

Cutting Plant layouts & drawings

Manage HR side of direct reports (performance, attendance, motivation and discipline).

Cost saving and improvement suggestions and implementation.

Housekeeping of inspection area in line with 5S principles.

Time Studies and setting of targets

Supervision of approx. 30 employees in the cutting room

Production Planning making use of Microsoft applications in conjunction with Industrial Engineering principles and techniques eg. Gantt charts, FIFO ( First In First Out )

Implementation of Quality charts, slogans and alerts

Nyenye Clothing Lesotho {Textile Industry}

Position Held: Industrial Engineer/ Work study Officer

Duration: April 2011-August 2011

Responsibility:

Time and Method Studies, Process charts, Production line layouts

Involved in change control and new projects implementation.

Optimization in production plant.

Implementing techniques using the World-Class Manufacturing System.

Manage HR side of direct reports (performance, attendance, motivation and discipline).

Ensure that inspectors record all non-conforming products.

Generate daily quality report and improvement actions.

Cost saving and improvement suggestions.

Conduct machine capability and operator capacity studies.

Implement 5s

Actively participate in problem solving.

Compile work instruction for sewing machine operators.

Prepare and control samples for changed and new products.

House keeping

Hesto Harnesses Stanger {Automotive OEM Supplier}

Position Held: Industrial Engineer Trainee

Duration: March 2010 - April 2011

Responsibility:

Achieved a R500 000 annual cost saving

Initiated numerous successful cost saving initiatives

Implementing lean techniques using the Toyota Production System principles

Involved in change control and new projects.

Achieving Heijunka ( Yamazumi )

Line Balancing

Capacity Planning

Optimization in production plant.

Manning calculations ( Labor )

Ensure that inspectors/employees have received proper training to perform their functions.

Method Studies

Layout Proposals and Implementation

Standard Operating Procedure

Generate daily quality report and improvement actions.

Cost saving and improvement suggestions.

Time Studies

Actively participate in problem solving.

Compile work instructions for operators

House keeping

Implement 5s across production plant

REFERENCES:

Mr. Akash Hariparsad

Profibre Products

Quality and Industrial Engineering Manager

Tel: (031-***-****

Cell: 078-***-****

Mr. Mkonzeni Zulu

Hesto Harnesses Stanger

Industrial Engineering Manager

Tel: (032-***-****

Cell: 083-***-****

Mrs. Lize Van Zyl

DB Apparel South Africa ( Playtex )

Human Resource Manager

Tel: (031-***-****

Mr. Brian Meyer

Nyenye Clothing ( Lesotho )

Factory Manager

Tel: +266-****-****

Mr. Don Archary

Conlog SA

Production Manager

Tel: (031-***-****

Mr. Samad Mohammed

@home Pavilion Shopping Mall

( Part-Time Job )

Branch Manager

Cell: (082-***-****



Contact this candidate