RAJAN KUMAR
Mobile: +** –91-735*******, 881-***-****
E-Mail: **************@*****.***
***************@*****.***
To utilize the given opportunity for the benefit of the organization towards attain its objective/goal and equip myself to the best through learning.
SYNOPSIS
Diploma (Mechanical Engineering) from College of Neptune Institute of Management Technology
(NIMT) Delhi.
Endowed with a passion for winning as evinced through demonstrated excellence in the professional area.
Keen learner with constant zest to acquire new skills.
Love travelling, Team player with strong analytical and leadership skills in project management.
WORK EXPERIENCE
01- Greenfield Project “450 TPD New Fiberline” (consulted by Metso Finland) in Swetha Engg. Ltd. As a Sr. Supervisor Specialized on Piping work, Vessels Erection, Tank Fabrication & Erection, Equipment Erection in Century Pulp & Paper Mills (Aditya Birla Group of Companies),Lalkua, Nainital.(Period- 15-12-2009 to 30-10-2011). 02- Tank, Conveyer Fabrication & Erection work in Swetha Engg. Ltd Swetha Engg Ltd. at Grasim Division Harihar Pollyfiber (Karnataka). (01-11-2011) to (31-03-2012) 03- Swetha Engg. Ltd. Tank, equipment, Conveyer Fabrication & Erection work in JK PAPER MILL RAYAGADA (ORISSA). 04-Currently working as Engineer mechanical in LEVVY COSTRUCTION & ENGINEERS. Specialized on Piping work, Vessels Erection, Tank Fabrication & Erection, Equipment etc. In BIRLA CELLULOSIC KHARACH - Gujarat. (Aditya Birla Group of Companies)
1.Working experience – (15-12- 2009 to at Present)
2.Jobs Responsibility –
1. Procurement of engineering material (Valves, Pipe & Fitting etc) as per standard of consultant.
2. Inspection & Supervision of Pipelines & equipments, conveyer erection & Fabrication jobs.
3. Fabrication & erection of Pipe Supports, conveyer, pipe lines as per the drawings.
4. Special Material Pipelines such as CS-PTFE & FRP Line Erection jobs.
5. Laser alignment of Pumps & Motors etc.
6. Anchoring installation & commissioning of machines & equipments and ensuring
Completion of project in minimum turnaround time effective resource utilization to maximize the
Output.
7. Monitoring project progress, and planning the manpower.
8. Responsible for erection of whole spinning plant.
9. Overhauling of all the mechanical equipments
10. Looking after the piping in the spinning area.
11. Looking after the yarn transportation system.
12. Monitoring the destuffing of containers.
13. Giving procurement for required spares.
AREA OF INTREST
Power Project
Oil & Gas Project
Paper Project
Textile Project
Production Industries
QUALIFICATION
Diploma (Mechanical Engineering) College of Technology Neptune Institute of Management Technology (NIMT) Delhi.
(72 %)
ACADEMIA
X UP BORD 2008 57%
ITS SKILLS
Proficiency with Microsoft Office packages (Excel, PowerPoint, Word), Internet Usage.
PERSONAL DETAILS
Date of Birth : May 1, 1991
Permanent Address : Hno 33,Bhathwa panday, PS- Bahiyari baghel,, Teh- Bhatpar rani,
Dist- Deoria (u.p) 274702
DECLERATION
I hereby declare that the above-mentioned details furnished by me are true and correct to the best of my knowledge and belief.
Place : Signature
Date : (Rajan kumar)