Post Job Free
Sign in

Project Manager

Location:
Pune, MH, India
Posted:
December 07, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

Name: Rajput Rahul Umrao Email: **********@*****.***

Address: Plot No 17,Survey No76/1/1 Mobile: 976-***-**** / 940-***-****

Kolhe Nagar,Jalgaon. Tal-Jalgaon

Dist: Jalgaon-425001

Career Objective:

To obtain work environment that provides me with an opportunity to learn through practical experience and observation while contributing to research work with an enthusiastic and innovative approach where I can utilize and apply my knowledge, skills which would enable me to grow while fulfilling organizational goals.

Experience:

Working on Siemens Teamcenter PLM (TCUA and Teamcenter Enterprise) from 29-Jun-2015 to till date as a PLM Consultant at Prognuer Technologies Private Limited and deployed to Tata Technologies Limited.

Worked on Siemens Teamcenter PLM (TCUA) from 11-Sep-2014 to 18-Jun-2015 at Faith PLM Solutions, New Sangavi, Pune.

Completed Siemens Teamcenter PLM (TCUA) Software training from May-2014 to Aug-2014 at Faith PLM Solutions, New Sangavi, Pune

Engineering Education:

Branch : Mechanical Engineering

Institute : Shram Sadhna Bombay Trusts COET, Bambhori, Jalgaon.

University : North Maharashtra University, Jalgaon.

CLASS

YEAR

Marks

Percentage

BE

2010-2014

1050/1500

70.00

Secondary & Higher Secondary Education:

CLASS

SCHOOL/COLLEGE

Board

YEAR

PERCENTAGE

S.S.C.

Raosaheb Rupchand Vidyalaya, Jalgaon

Nasik

2008

83.23%

H.S.C

Moolaji Jaitha College, Jalgaon

Nasik

2010

66.17%

Technical Skill:

1. Installation of Oracle Database (10G, 11G)

2. Installation of Teamcenter 9.1, 10.1 (2 Tier, And 4 Tier Thin Client and Rich Client)

3. User Level (My Teamcenter, Product Structure, Workflow Designer, Classification, Query Builder, Organization, Access Manager, Command Suppression, etc)

4. Teamcenter Administration:

Data Model Administration:

Creating Custom business Objects (Item, Form, Dataset, Relation).

Creating Custom Rules (GRM, Deep Copy, Display, Naming, Alternate ID).

Creating Custom properties, conditions.

Deploying Templates: Hot and Cold deployment.

Configuring Live Update Project.

Managing HTML reports for Delta file generated during deployment.

Application Administration:

To create customized searches for objects in Teamcenter database using Query

Builder.

To define and maintain Organization.

To control user access to data object stored in Teamcenter using access manager.

To create/modify Revision and Variant rule to product structure using Structure

Manager.

Design of Workflow using various handlers as per the given requirement and condition.

To maintain the hierarchical Classification structure based on the value of workspace objects.

5. Teamcenter Server-side Customization

ITK Batch Program

6. Teamcenter Client-side Customization

RAC Customization

7. Programming skills: C.

8. Utilities & Preferences.

9. Teamcenter AutoCAD Automation(TCAA)

Integration of Teamcenter 10.1 with AutoCAD 2015(TCAA).

10. Teamcenter Integration for Solidworks(SWIM)

Integration of Solidworks with Teamcenter using SWIM and attribute mapping with swim.xml.

11. Client side customization using XML Stylesheet rendering for

Object creation

Summary

Form

Save as

Property

12. Knowledge of LINUX Commands.

Project:

Project Title: Data model customization using BMIDE. (Implementation)

TC version Teamcenter 9.1

Details Creating business rule to configure the Teamcenter for organizational need such as:-

Creating custom Business objects (Items, forms, etc) and adding various properties as required by client.

Adding properties to the operation descriptor to appear in object creation tab and make them mandatory.

Adding Deep copy rules, Display Rule on the existing object or custom objects and applying conditions to them.

Creating Naming Rule and Naming Revision Rule based on existing system

Creating LOV’s and attaching them to the properties of the Business Objects.

Providing alternate ID for sharing with user.

Performing Hot Deployment.

Creating packages and deploying it on Test Server..

Configure Live Update project

Configure Business Object Constants(DisplayName).

Project Title: Implementing Workflow as per Client’s Requirement.

Company: Tata Technologies Limited

TC version Teamcenter 10.1

Details:

Create workflow process template as per client requirement for ERC, Planning and Process departments.

Call sub-process using handlers.

Check particular dataset is attached to the IR or not.

Check Analyst and Change Specialist are assigned to Task or not.

Fill property values when DML is in process.

Before sending DML to the workflow, check parts attached under DML are checked-out or not.

Demote the task after rejection to a particular task

Add custom status on the task.

Check the required properties are filled or not.

Hold a task till user performs some action.

Applying Template Filter for the workflow process template list.

Project Title: Server Side Customization using ITK.

Company: Faith PLM Solutions, Pune

TC version Teamcenter 9.1

ITK and C Programming

Details:

oPre-condition:

To restrict “revise” operation on Item Revision if PDF dataset is not attached. Check particular dataset is attached to the IR or not.

To attach a dataset only if a specific dataset is listed in secondary object of Item Revision.

Write a Pre-condition to check Item Masters Form attribute values while creating Item. String attribute value length should be more than 20.

To check pre-condition whether the first Item Revision is in process or not. If it is not in workflow process, user should not be able to create as new revision.

Write a pre-condition to restrict user to delete Item Revision if there is any Dataset attached to it and display custom message “You can not delete this Item Revision since it is having Dataset attached”.

Write a pre-condition which is called before creating a new Item using “save as” operation from existing Item revision.

Evaluate two conditions:

1.Role should be Engineer.

2.Attribute “IsActive” on the Item Master Form should have the value “enabled”.

oPost-action:

Print name of the Item on TAO Window after creating an Item.

oBatch Utility:

Create a Folder and bulk of Items and insert those Items one by one into custom folder and insert that custom folder into Home Folder.

Attach a Named reference to a Dataset.

Check whether an Item is classified or not.

Find classified objects by specified user in database.

Company: Tata Technologies Limited

TC version Teamcenter 10.1

Details:

Whenever user check-out/in the Part Revision, its attachments should be check-out/in.

Whenever user revise the Part Revision, Attributes of attached datasets

(Drawing Revision) should be updated as per changing revision ID.

Before revising Part Revision, it should check whether user is privileged member in project of object.

Whenever user creates a part in Solidworks, Owner of Part Revision should be appeared in owner property of Solidworks Part/Drawing.

User who revises the Part Revision, should be appeared in the Version creator property.

User should not able to paste the Part Revisions with ERC Released status in Task Revision.

User should not able to check-out the Part Number Generation Object.

Applying validation for the properties of Part Revision as well as Dataset attached to it.

Whenever user from Designer group creates/revises the Part Revision, new revision should appear as a separate object(CopyAsObject).

Whenever user from Process group revises the Part Revision, new revision should appear as a reference object(CopyAsReference).

Before saving Part, it should check whether Part Revision contains 2D/3D attachments.

Before revising Part Revision it should check whether previous revision is frozen or not.

Whenever user paste the Parts in Task revision, the T9DmlNo attribute should take the value of DML Number(ID).

Object types of attachments to the Part Revision should appear in the Application Property on the Part Revision.

Before creating part, it should check the Part Number generated is as per the Project Code and Design Group of Dataset.

Before revising the Part Revision, it should check whether source revision is Latest or not. If source(selected) revision is not latest, show error, “You can perform revise operation on Latest Revision only. Please select Latest Part Revision.”

Whenever user performs “Cancel check-out” operation on Part Revision, the same operation should be perform on Datasets attached to it

Project Title: Teamcenter AutoCAD Automation(TCAA)

Company: Tata Technologies Limited

TC version Teamcenter 10.1

AutoCAD version AutoCAD 2015

Details:

Integration of Teamcenter 10.1 with AutoCAD 2015.

Attribute mapping from AutoCAD template to Teamcenter Object.

Testing of TCAA.

User training for TCAA.

Project Title: Solidworks Integration with Teamcenter(SWIM).

Company: Tata Technologies Limited

TC version Teamcenter 10.1

Solidworks version 9.2.2

Details:

Integration of Solidworks with Teamcenter.

Attribute mapping from Solidworks to Teamcenter.

Downloading EBOM and CAD-BOM from Teamcenter Enterprise and uploading to TCUA using custom utility and swim_import command, respectively.

Testing of SWIM

User training for SWIM.

Project Title: XML Stylesheet Rendering.

Company: Tata Technologies Limited

TC version Teamcenter 10.1

Details:

XML Stylesheet rendering as per client requirement.

Adding columns, sections, separator, table display, Governing property.

Types:

1.Property

2.Item create

3.Save as

4.Summary

5.Form

Project Title: Running Batch Utility on TCUA server.

Implementation of TCUA in the organization.

TC version Teamcenter 9.1, 10.1

Responsibilities:

Installation of oracle database 10g, 11g.

Creation of Database for Teamcenter.

Complete installation of Unified server and configuring its client machine.

Server installation of 4-tier Teamcenter Unified.

Configuration of Web Tier and OTW client.

Personnel Details:

1.Name : Rajput Rahul Umrao

2.Date of Birth : 11/10/1991

3.Languages Known : English,Hindi,Marathi

4.Sex : Male

5.Marital Status : Un-married

6.Nationality : Indian

7.Permanent Address : Plot No17,Survey No76/1/1,Kolhe Nagar,Jalgaon-425001

8.Current CTC : 2,40,000 PA.

9.Expected CTC : 4,80,000 PA.

10.Notice Period : 1 Month.

Declaration

I hereby declare that particulars given above are true to the best of my knowledge.

Date:

Place: Pune Rajput Rahul Umrao



Contact this candidate