Qazi Khalid Hussain Kalwar
(QA&QC Engineer)
PERSONAL INFORMATION:
Permanent Address: Village Qazi Lal Bux Kalwar P.O Box Mirpur Mathelo
Present Address: House No. 103, Gill Colony near Govt: Primary School Mirpur
Mathelo District Ghotki.
Phone No: +92 – 300-***-****, +92 – 334-***-****
E-mail: ******.******@*****.***, ***********@*****.***
OBJECTIVE:
Looking for an ideal challenging job where I shall utilize my abilities, experiences and myself for the promotion of the desired organizational objectives.
EDUCATIONAL HISTORY:
Dawood College of Engg: & Technology (DCET) Karachi an Affiliated with MUET Jamshoro Sindh.
November, 2004
Metallurgical &Material Engineering (B.E)
Government Degree College, Mirpur Mathelo
May, 1997
Intermediate (Pre – Engineering)
Government High School, Mirpur Mathelo
May, 1995
Matric (Science)
PROFESSIONAL EXPERIENCE:
Client : BYCO OIL PAKISTAN LIMITED (BOPL)
Company : Descon Engineering Limited
Project : 120M BPD Hub MouzaKundDistt. LasbelaBaluchistan
Position : In-Charge QA/QC
Duration : September, 2015 to till Date
Responsibilities:
Liaison with senior management regarding QA/QC matters.
Preparing PQRs & WPS for welding
Ensuring all NDE activities according to the procedure
Preparing QIP for static equipment’s, Furnace re-tubing & Piping according to client’s specifications.
To attend Hydro test & soap filling test of static equipment’s
Making MS regarding, welding procedure, repair procedure, NDE & hydro test
Monitoring all QA/QC activity & daily meeting with my team.
Client : Adhi LPG / NGL Recovery Plant – III (PPL)
Company : Descon Engineering Limited
Project : 1151
Position : QA/QC Engineer
Duration : April, 2015 to September, 2015
Responsibilities:
Inspecting the materials regarding Traceability, Physical condition, color code and HEAT number verification as per MTC and ISOMETRIC requirement.
Checking alignment / Orientation of pipes as per ISO Drawing.
Visual inspection of final weld profile.
Control of welding material (Electrode, Filler Wire) as per their type and lot number
Witnessing of NDT methods (PT/RT/MT/UT) according to specification and Section- V.
Preparing NDT request to fulfill the project NDT requirement as per piping class or line class and project specification.
Inspection and monitoring of site activities such as fabrication, and installation of piping spools.
Inspection of type of valves, their directions, tag numbers, rating and size.
Line checking as per test packages, punch listing and responsible for Hydro testing & Re-instatement works.
Monitoring and conducting material inspection for piping, as per standards, codes and Process standard specification, and inspection of fit-up, punch listing, weld root and subsequent passes for pipe joints with dimension and orientation.
Ensuring stage inspection and dimensional control inspection of piping in pre fabrication and erection as per drawing, project specification and inspection test plan.
Review and preparing of Test Package Weld Summary & NDE Summary.
Check flange alignment, flange hole offset & tilting.
Inspection of hydro-test, Air blowing & Reinstatement.
Verification of test equipment’s calibration of PSV pressure gage and manifold.
Client : National Refinery Limited (NRL)
Company : Descon Engineering Limited
Project : Turnaround 2014
Position : QA/QC Engineer
Duration : December-2014 toJanuary - 2015
Responsibilities:
Coordination with client regarding site inspections.
Coordinating with NDT team regarding NDT (i.e. RT, UT, DPT and MPI).
Maintain the records of NDT reports after review.
WPS/PQR review and approval.
Fit-up inspection after joints preparation as per ISO provided.
Co-ordination for pre-heating
Preparation and conducting RIT.
Coordinating, reviewing and managing the record of Hydro Test, Pneumatic Test and Leak Test.
Inspection and documentation after proper flushing from pipelines after Hydro Test.
Inspection of incoming material at job site.
WPS/PQR review and approval.
Inspection of maintenance and repair activities of in-service pressure vessels according to 510 during turnarounds. (Vessels, Columns, Heat Exchangers, Heaters, filters, AFCs)
To attend Box-Up activity of all static equipment’s (Pressure vessel, Column, Heat exchanger)
Final submission of QC dossier after client’s review.
Painting & Insulation inspections
Client : Pakistan Refinery Limited (PRL)
Company : Descon Engineering Limited
Project : Turnaround 2014
Position : QA/QC Engineer
Duration : October-2014 to December-2014
Responsibilities:
Preparation of QIP.
Inspections of all activities as per QIP
Preparation of WPS as per approved PQR
Inspection and Testing of Mechanical Construction Activities like, Fabrication & Erection of Structure.
Preparation of daily Inspection reports.
Daily Meeting field Staff about progress & Co-Ordination.
To Maintain Record for Equipment installation, Steel Structure work.
Fitup of Structure as per Drawing.
Welding inspection of Structure Work.
To Witness of Hydro test, Leak test, Pneumatic test, Flushing/Air Blowing.
Welding inspection of piping in shop and field.
Responsible for fabrication of piping, maintaining Quality record for NDT, Inspection & Testing.
Client : UCH-II
Company : Descon Integrated Projects (Pvt) Limited (DIPL), Pakistan
Project : UCH-II 400, MW, CCPP, (P-8309 / 1139), DeraMurad Jamali
Position : QA/QC Engineer
Duration : August, 2013 to April, 2014
Responsibilities:
Performing Audits and reporting non-conformities.
Performing corrective and preventive actions from audit reports.
Incoming Martial inspection of pipes and fittings of the pipes as per IFC & MTC.
Inspection and Testing of Mechanical Construction Activities like, Fabrication & Erection of Piping
Monitor all-critical activities like, welding, NDT and Hydro-testing according to the Procedure, Quality
Inspection Plan and Project Specification.
To Witness of Hydro test, Leak test, Pneumatic test, Flushing/Air Blowing.
To check all relevant formats are attached in test Pack
Coordination with client to resolve the issues related to Test Package.
Fit up inspection of piping as per IFC drawings.
Welding inspection of piping in shop and field.
Prepare construction punch list.
Maintain quality records for NDE, Inspection and testing activities
Having sound knowledge of final documents submission (Dossiers), daily basis data and test packs at the completion of works.
Client : BYCO OIL PAKISTAN LIMITED (BOPL)
Company : Descon Engineering Limited
Project : 120M BPD Hub Mouza Kund Distt. LasbelaBaluchistan
Position : QA/QC Engineer
Duration : July, 2011 to August, 2013
Responsibilities:
Responsible for sending QA/QC Reports and other relevant data, as & when required to the Head of QA/QC.
Responsible for maintaining up-to date quality records as per Customer Requirements & make final Dossier for the client.
Responsible to complete all Test Packs According to the requirement & demand of desired client.
Experience in process piping fabrication and erection involved in preparation of detail schedule & progress monitoring of fit up & welding to ASME SEC.B31.3
Welder Qualification Test as per ASME IX.
Under Ground pipe line welding coating holiday lowering backfilling Sand blasting surface
Preparation premier paint DFT Inspection.
Preparation of the documentation side-by-side of the activities.
Material handling with inspection according to specification and procedure.
Preparing the list and job close Final Dossier as well as.
Client : BHP Billiton Company : Descon Engineering Limited
Project : BHP Billiton Zamzama Gas Field (1133) Dadu
Position : QA/QC Engineer
Duration : November, 2010 to September, 2011
Responsibilities:
Responsible for overall execution of the Quality Inspection Plan at Project site.
Responsible for ensuring that all critical activities like NDT, PWHT, Hydro Testing, Holiday Testing & PMI is handled according to the procedure & Quality Inspection Plan (QIP). Visual Welding Inspection,
Responsible for fabrication of piping, maintaining Quality record for NDT, Inspection & Testing.
Responsible for sending QA/QC Reports and other relevant data, as & when required to the Head of QA/QC.
Responsible for maintaining up-to date quality records as per Customer Requirements & make final Dossier for submission to client.
Responsible to complete all Test Packs According to the requirement & demand of desired client.
NDT Coordinator.
Client : Engro Fertilizer (Daharki)
Company : Descon Engineering Limited
Project : Enven1.3EngroExpansion Project (1121), Daharki
Position : QA/QC Engineer
Duration : June, 2009toNovember, 2010
Responsibilities:
Responsible for overall execution of the Quality Inspection Plan at Project site.
Responsible for ensuring that all critical activities like NDT, PWHT, Hydro Testing, Holiday Testing & PMI is handled according to the procedure & Quality Inspection Plan (QIP). Visual Welding Inspection,
Responsible for fabrication of piping, maintaining Quality record for NDT, Inspection & Testing.
Responsible for sending QA/QC Reports and other relevant data, as & when required to the Head of QA/QC.
Responsible for maintaining up-to date quality records as per Customer Requirements & make final Dossier for submission to client.
Responsible to complete all Test Packs According to the requirement & demand of desired client.
NDT Coordinator.
Company : Aman Engineering Services (Pvt) Ltd, Daharki
Position : Project Engineer
Duration : December, 2005to June, 2009
Responsibilities:
Installation of Pipe lines.
NDT coordinator.
Excellent Knowledge of Corrosion Control in Oil & Gas Pipe Lines &control to all of them.
PROFESSIONAL TRAININGS
Mari Gas Company Ltd, Daharki.
Peoples Steel Mills, Karachi.
SSGC Ltd, Karachi.
NRL Korangi, Karachi.
PERSONAL INFORMATION
Date of Birth : 01-01-1980
Nationality : Pakistani
Marital Status : Married
Languages : English, Urdu, Sindhi
C.N.I.C : 45104-0429262-9
Passport No. : DA4792621
PEC No. : METAL/1826
Skills
MS Windows (MS Office, Word, Excel,Power Point)
REFERENCES:
Will be furnished if required