Power Plant Manager

Location:
Seattle, WA
Posted:
November 22, 2015

Contact this candidate

Resume:

Education: Montana State College of Technology, AAS, Degree Process Plant Technology 2009

Courses Studied: Fundamentals of the refinery process, equipment, and auxiliaries involved. Learning how to interpret and create process flow diagrams, and process instrumentation diagrams. Introduction to basic boiler operation, instrumentation and control systems simulations with SimGemics for power plant operation and Simtronics for refinery operation, along with basic DCS, PLC, and Delta V use.

Experience: ERA American Real Estate - Precision Group Real Estate Consulting clients on market conditions, financing & legal requirements in relation to Residential, Commercial, and New Construction Real Estate Sales & Acquisition. Preparing representation contracts, purchase agreements & closing statements, communicating with Escrow Companies, Lenders, Home Inspectors, and Appraisers to ensure that terms and conditions of purchase agreements are met before closing dates. Licensed MT Realtor: June 2014-Current

BAY LTD. Billings, MT

Construction of Oil/Gas Process Modules, Piping/Steel Fabrication, Hydro Testing. Supervisor: Dec 13-Oct 14

Wildfire Services- Mobile laundry, sinks, and shower service for USFS. Summers 09,10,13,14,15

*Timec- Transfield Service Group-Rocky Mountain Region: 2009-2013

*Chevron Salt Lake Refinery-Alkyl and FCC turnaround. Boilermaker: Feb-April 2013

*Marathon Oregon Basin Gas Plant

Tower work and installation of new piping, valves and catalyst. Boilermaker: Sept. 2012

*ExxonMobil Billings Refinery

The upgrade, repair, and replacement of piping, valves, and exchangers. We also repaired tower trays in 5 towers.

Boilermaker: April 2012-September 2012

*ConocoPhillips Glacier, Seminoe, and Yellowstone Pipeline Systems As a foreman, it was my responsibility to supervise and coordinate projects and maintenance work done for CPPL by multi craft crews of 2-5 workers; using written, spoken and electronic communication to ensure that all work met and exceeded CPPL and Timec HSE policies. I also had a role in the planning, billing, timekeeping, and acquisition of tools, materials, and equipment for work done on the pipeline and in terminals. I have participated in LOTO, critical lifts, excavations, the removal and installation of pipeline; and the removal, monitoring, operation and installation of pumps and valves. Pipeline Foreman: June 2011-Febuaury 2012

Pipeline Experience: July 2010- February 2012

GABRIEL X. SALLEY

4230 Woodgrove Drive Billings MT, 59106 406-***-**** *******.******@***.***

*ConocoPhillips Billings Refinery- Maintenance work in the FCC. Mechanic 2: March 2010

*ExxonMobil Billings Refinery-Flare Gas Management Project Tasks as a Welder, Mechanical, and Pipefitter Helper. I learned the basics of fitting pipe and welding practices along with the use of Isometrics Drawings and the Pipefitters Blue Book as they apply to refinery work. I also did Safety and Supply work. Mechanical 1: Nov. 2009-Jan. 2010

*Chevron Carter Creek Gas Plant Evanston, WY.

Major overhaul of the gas plant, the majority of the work my crew and I performed at the plant was the removal, and installation of blinds, valves, and exchangers. Confined space, hot work inside vessels, we also removed two large vessels, fuel gas filters and large pressure relief valve from a distillation column.

Mechanical 1: July 2009

Billings Hotel and Convention Center-Banquets Assistant Manager- I started as banquet set-up, advanced to captain and supervisor, and was promoted to assistant manager where I was responsible for billing and setting up events according to contract. I was also involved in scheduling and overall management of banquets department. October 2007-March 2009

American Water Technology- Water Treatment Technician and Bottler Preformed basic water treatment and used a bottling unit where I monitored pumps, temperature, pressure and chemicals, while stacking up to 1000 bottles a day. I also assisted in deliveries, maintenance and the regeneration of water softeners. March 2006-August 2006

MT Labors Local 1686

Sletten Construction- Miles City Bridge Build – Labor/ concrete PPL- Worked for Brand Scaffolding erecting and removing scaffolding. May-September 2005