Post Job Free
Sign in

Project Engineer

Location:
Houston, TX
Posted:
November 08, 2015

Contact this candidate

Resume:

JULIUS B. FIGUEROA

***** **** ****, *** ****, Houston, Texas 77084

CellPhone: 917-***-****, Email: *******@*****.*** Job Objective and Qualifications For

Senior Piping Designer

Innovative and efficient professional offering more than 20 years of engineering, designing and drafting for both construction and design offices multiple discipline projects with emphasis on piping for industrial (refinery, power ) as well as commercial HVAC.

SPECIAL SKILLS:

Extensive knowledge of Autocad, CADworx, ISOGEN(Pipe Fabrication), Navisworks, CADPIPE, QuickPen, Microsoft Project, Excel, MS Word, Caesar (Pipe Stress Analysis program). PROFESSIONAL HISTORY IN THE UNITED STATES

JACOBS ENGINEERING, 2900 North Loop West, Suite 1000, Houston, Texas 77092 Sr Lead Piping Designer - June 2014 – Present

As a Lead Piping Designer for Upstream Department, I normally lead and supervise piping projects with regards to plot and equipment layout project. Make sure that all design are in conformance to client standards and specification. Took charge in the preparation of the piping model and took charge in the model review with the client and make sure the model are approved. Proceed to the preparation of piping and isometrics drawings and other documents deliverables. Attend all necessary meeting with internal discipline and also with clients. Assigned task to all designers assigned in the project. Distribute work assignment to designers assigned in the project. Check, review and comments other designers work to comply with industry standards and clients requirements.

MUSTANG ENGINEERING L.P., 16001 Park Ten Place, Houston, Texas 77084 Sr. Piping Designer - Feb. 2012 – May. 2014

Working as a Sr. Piping Designer for the Special Projects Department for any project assigned for our clients, SUNOCO, CONOCO, SHELL and others. Prepare necessary modeling of piping layout and sections for the projects. Also prepares the Bill of Materials for the piping as required. All drawing preparation is done in Cadworx 3D environment and also in 2D on clients request. Distribute work assignment to designers assigned in the project. Check, review and comments other designers work to comply with industry standards and clients requirements. MARIC MECHNICAL INC., 19-03 75TH ST. East Elmhurst, NY 11370 Sr. Piping Designer - Feb. 2005 – Feb. 2011

Was assigned as Piping Designer for the DEP Jamaica Water Pollution Plant Project. Prepare necessary engineering document submission for piping, HVAC, controls and instrumentation. Took charge in the preparation of all shop and spool drawings for piping including pipe supports preparation, HVAC heating piping, machine room and boiler room layout. Also the preparation of pipe fabrication drawings for fabrication shop use and field fitters. Preparation of project procedures and manual. All drawing preparation were done in 3D in CADWorkx or CADPipe environment. PROFESSIONAL HISTORY OUTSIDE OF THE UNITED STATES

SIME DARBY ENGINEERING SDN BHD, Kuala Lumpur, Malaysia Chief Designer, 2000 to 2005

Supervised the preparation of detailed design and construction drawings including all Piping & Instrumentation Diagram (P&ID) and Flow Diagram. Responsible for the preparation of mechanical equipment specification, piping specification and other related specifications. Also responsible for the all piping layout and sections and details. All drawing preparation were in AutoCAD environment.

Below are some of the projects that I have been a participant: Power Generation Project:

Participated in a joint venture project for Sime Darby and General Electric, USA to build a 440 MW Independent Power Plant in Port Dickson, Malaysia. Contributed to completing the project within eight (8) months from the first foundation to generating 400 MW to the national grid which placed Sime Darby in the Guinness Book of World Records.

Received an achievement award from General Electric, USA for completing the design task in just over three (3) months, for a task normally taking a year to complete.

Met the scheduled completion date within budgeted man-hours with client satisfaction. Oil and Gas Upstream Project:

Participated in the detailed engineering and design of topside facilities for Sarawak Shell's F6K-A offshore gas production complex in Central Luconia, Sarawak. Lead a team of Piping designers in the actual preparation of all offshore main gas pipelines. Also prepares other auxiliary pipings both layouts and isometrics including pipe spooling for onshore fabrication. Prepares all BOM both for onshore works and for offshore packages. Oil and Gas Downstream Project:

Acts as the Senior Designer for a Team of Designer for the New Liquefied natural gas (LNG) plant, Malaysia LNG Tiga Plant in Bintulu, East Malaysia, the world largest LNG plant. It was an EPCC contract where we took charge of all the preparation of piping drawing requirements for project. In-charge of all squad checking for all the documentation prior to submission to client consultant. Coordinate closely with the consultants of the project for smooth design and submission of deliverables.

Other major companies which I have been with and had developed me into a Piping Designer: Lead Designer/Piping Engineer : MMC OIL ANG GAS ENGG. - KL, Malaysia 1999 to 2000 Lead Mechanical/Piping Engineer : SIME DARBY ENGG SDN BHD - KL, Malaysia 1997 to 1999 Lead Engineer of Facilities : KVAERNER ENGG SDN BHD - Miri, Malaysia 1995 to 1997 Lead Engineer/Project Design Engr : SAUDI CONSULTING SERVICES - Saudi Arabia 1992 to 1995 ACADEMIC CREDENTIALS

Bachelor of Science in Mechanical Engineering, Feati University, Manila, Philippines, 1992 Additional Training : Safety Training in Offshore Operation, Decision Making and Problem Analysis, Time Management, and Faculty Development Program

Member of the Philippine Society of Mechanical Engineers - Advisor for a Junior Chapter WILLING TO TRAVEL AND RELOCATE; REFERENCES TO BE FURNISH UPON REQUEST



Contact this candidate