Application for Sr.Engineer Steam Turbine & Generator
Dear Sir,
I would like to apply for the mentioned post. Herewith I enclose my curriculum vitae for giving sufficient details about my career with educational and professional achievements for your reference.
I completed the B.Tech (Mechanical) Diploma in Mechanical Engineering. Also I am having 15 years above experience in this field (In power plant project & Mechanical Maintenance) and up to now I am working as a Leading Project Gas Turbine and Compressor for Larsen Tourbo Hydrocarbon in Ras Lappan Industrial Area Alkhor.Doha, State of Qatar. I was handling past 5 projects independently had done aboard projects also have Knowledge thermal and Gas power plant Maintenance projects.
Steam Turbine Make: BHEL - 500MW, HTC – 150MW, SHIN NIPPON-60MW. Steam Generator Make: BHEL – 500MW.
Gas Turbine Make: SIEMENS – 150MW, GE -120MW & ROLLS-ROYCE-60MW. Gas Generator Make: SIEMENS – 150MW, GE -120MW.
I ready to join your organization would be sincere to do my duties and would contribute in other activities for improvement of organization for your entire satisfaction. I wish to you work in your firm as a Senior Leading Project engineer (Turbine & Generator) Auxiliaries overall. It is my hope that my application will be considered agreeably. I have attached my CV to your consideration am expecting your reply as soon as possible. Thanking You
Yours sincerely,
SIVARAMAKRISHNAN.A
Page 2 of 7
CURRICULAM VITAE
Mail to: acs61i@r.postjobfree.com acs61i@r.postjobfree.com Mobile No: 0091-766-***-**** 0091-948-***-****
Profile:
A Qualified B.Tech (Mechanical Engineer) with a Good Knowledge and experience in Steam turbine and gas Turbine and generator. Ability to work on own initiative and as part of a team. I have skills to develop and motivate teams to achieve their objectives. I have dedication to maintain high quality of standards.
Objective:
To position as a Sr.Turbine Engr. I can give my Engineering background and professional skills to increase the productivity and effectiveness of the company. Beginning in 1999, and spanning over 15 years’ experience in Turbine and Generator Erection, commissioning, Maintenance & Capital overhauling field. Educational Details:
Qualification : B.Tech (Mechanical)
Institute : Karnataka state Open University.
Year of completion : 2012 -2014
Board : Karnataka state Open University - Karnataka. Qualification : Diploma Mechanical Engineering
Institute : Ratnavel Subramanian Polytechnic College. Year of completion : 1996 -1999
Board : Directorate of Technical Education - TN.
Additional Qualification:
AUTO CAD (2010) MS PROJECT
Year of completion : 2002
Institute : Cad center in Madurai.
Employer’s Name and Address
Period
Designation Last held
From To
Indwell construction Pvt Ltd,
Vijayawada
May 1999 Dec 2006 Site Engineer
Page 3 of 7
Arabian construction engineering
company. Qatar
Jan 2007 Apr 2007 Site Engineer
Gulf Spic Engineering L.L.C
Jun 2007 Apr 2011 Sr.Engineer
Karpara Project Engineering Pvt
Ltd, Surat
Jun 2011 Jul 2012 Sr.Engineer
KVK Infrastructure Pvt Ltd.
Hyderabad
Aug 2012 Mar 2013 Deputy - Manager
Larsen & Tourbo Hydro carbon,
Qatar
Apr 2013 Nov 2015 Sr.Engineer
Work Experience Details:
Employer : LARSEN & TOURBO HYDROCARBON.
Designation : Sr. Rotating equipment Engineer.
Duration : (4 April 2013 to 30 Nov 2015)
Address : Ras-Lappan Industrial area, Alkhor, Qatar. Project : Dolphin Energy Limited (Train-7, 8 & 9)
Client : Dolphin Energy Limited
Turbine Make : Rolls-Royce Trent 60
Compressor Make : Dresser Rand DR-13
Employer : KVK ENERGY& INFRACTURE PVT LTD.
Designation : DeputyManager.Turbine dept.
Duration : (05 August 2012 to 23 March 2013)
Address : Okkur village. Nagapattinam
Project : Nagai Power Private Limited – 2x150 MW
Client : KVK Power in fracture private Limited
Turbine Make : Francotosi
Employer : KARPARA PROJECT ENGINEERING PRIVATE LIMITED. Designation : Senior Turbine Engineer.
Duration : (June 2011 to July 2012)
Address : Tuticorin.
Project : Indu Bharat thermal power – 2x150 MW
Client : Indu Bharat thermal power Private Limited Main Contractor : Greene sol power Stations
Page 4 of 7
Turbine Make : Hangzhou turbine and Harbin turbine Employer : GULF SPIC ENGG L.L.C.
Designation : Senior Engineer Turbine and Generator. Duration : (June 2007 to April 2011)
Address : Dubai, UAE.
Project : Aweer Gas Turbine Power Station (‘H’ Phase-III) – 4x250 MW Consultant : Mott Mac Donald
Client : Dubai Electricity Water and Authority (DEWA) Main Contractor : ETA STAR International (L.L.C)
Turbine Make : Siemens model V94.3A
Project : Emirates Aluminum power station – 6X200 MW Consultant : SNC
Client : Emal
Main Contractor : ETA STAR International (L.L.C)
Turbine Make : GE Gas Turbine 9F & 8E
Project : 20 MIGD SWRO Water desalination water plant Consultant : Aqua engineering 0vivowater
Client : Sharjah Electricity Water and Authority (SEWA) Main Contractor : Aqua engineering 0vivowater
Employer : ARABIAN CONTRUCTION ENGINEERING COMPANY Designation : Site Engineer.
Duration : (Jan2007 to April 2007)
Project : Ras gas Lappan Train-5
Client : Ras gas
Main Contractor : Arabian construction engineering company Turbine Make : GE Gas Turbine 8E
Employer : INDWELL CONSRUCTIONS PRIVATE LIMITED.
Designation : Site Engineer.
Duration : (May 1999 to Dec 2006)
Page 5 of 7
Address : Vijayawada, A.P. India.
Project : Kaniha super thermal PowerStation Unit-IV 1 X 500MW Client : National Thermal power corporation (NTPC).Orissa Main Contractor : Bharat heavy Electricals Limited (BHEL) Project : Ramagundam thermal PowerStation Unit-VII 1 X 500MW Client : National Thermal power corporation (NTPC) Main Contractor : Bharat heavy Electricals Limited (BHEL) Project : Kudithini thermal power Station Unit – I 1 X 500MW Client : Karnataka Thermal power corporation (KPCL) Main Contractor : Bharat heavy Electricals Limited (BHEL) Project : Vishaka Refinery power stations 2X22 MW
Client : Hindustan Petroleum Corporation Limited.
Main Contractor : Bharat heavy Electricals Limited (BHEL) Project : Paricha power stations 2X210 MW
Client : Paricha Thermal power station.
Main Contractor : Bharat heavy Electricals Limited (BHEL) Job Details:
To maintain the preservation of machine.
GE Air cooled condenser system.
Stage Inspection of turbine and generator.
Coupling Alignment inspection.
Follow up the project schedule.
Inspection of lifting tools and tackles.
Align and level all the pedestal and LP base plates.
Finally align and level HP front, HP rear, LP front and LP rear pedestals along with LP base plates as per the transverse and longitudinal axis catenary readings.
Radial and axial clearances of the LP casing including rotor float.
Check free run out of HP rotor on journal and coupling face including the float readings.
Alignment of HP, IP and LP rotor.
Couple HP / IP rotor on temporary Bolts and align rotor / casing radially and axially.
Recording the IP rotor float by shifting HP casing axially. Page 6 of 7
Alignment of HP/IP/LP rotors and their coupling on temporary bolts including its couple run out.
MOP alignment and its doweling.
Decoupling of HP / IP, LP/IP, LP/Gen., Gen./Exciter coupling and rechecking of alignment/catenary after floating of TG deck spring.
Final tightening of HP/IP, IP/LP, LP/Generator and Generator / Exciter coupling after correcting the alignment including their couple run out and swing check of rotor on HP Front and exciter rotor.
Correction of LP shaft seal clearance after floating of TG deck with CW pump in operation and water in the hot well of condenser upto operating level.
Erection of stator and installation of rotor.
Purge tests of rotor ventilation canals.
Alignment or generator rotor. Inclination or shaft journal test results.
Coupling alignment results of generator and LP rotor. Magnetic Axis adjustment results.
Centering and offset-setting of brush gear. Fixing of brush holder and brushes.
Generator Gas Tightness Test. Hydraulic test and oil flushing of seal oil system.
Seal Oil System – Circulation. Hydraulic test and flushing of primary water system. Duties and Responsibilities:
Before starting the work comparing P & ID, ISO and layout drawings.
Review of inspection test plan (ITP) equipment preservation plan, inspection schedules, inspection procedures and stage wise inspections etc.
Maintain the preservation of Gas Turbine, Compressor, Lube oil cooler and ACC.
Supervising and adhere to the erection schedule & ensure quality to satisfy customer,
To prepare the project schedule, weekly and monthly schedule.
Co-ordinate for Final Inspection with Inspectors or Clients.
Commissioning and Trial running activities in cooling water, fuel oil, fuel gas and air system. OTHER SKILLS:
Measuring the Vernier caliper, outside micrometer, inside micrometer, slipgauge, bore gauge.
Efficient in use of time & resources.
Page 7 of 7
Company oriented dependable& very well organized.
Basic communication Knowledge with PC.
Familiar with P&ID, isometric drawing& technical document control.
To prepare the rigging plan and get approval from the customer.
Follow and train people the day to day procedures & safety talk of the company.
Communicate effectively with subordinates and management at all levels. Personal Information:
Father’s Name : C.ALAGARSAMY.
Nationality : Indian.
Date of birth : 02.06.1981.
Marital status : Married.
Languages Known : English, Tamil, Hindi and Telugu Passport Details:
Passport No : Z2251981
Passport Issue Date : 25.02.2013
Passport Expiry Date : 24.02.2023
Place of Issue : Madurai, Tamilnadu.
Permanent Address : No-5-2-46, Neerathan middle Street, T.Vadipatti (post), Madurai dist.
Tamilnadu – south India.
Pin - 625218
I hereby declare that all the information furnished above is true to the best of my knowledge.
(A.SIVARAMAKRISHNAN)