NICKNAME: JEFFREY
#**** ******* *********** ******** **** Dagupan City Pangasinan, Republic of the Philippines
Mobile No. Philippines: 00 63-928-***-****
Tel. No 00-63-75-522-****
E-mail address: ****************@*****.***
****************@*******.***
OBJECTIVE:
To impose quality and safety at all times in the field of oil and gas construction projects and insure an incidents free area in a fast and successful completion of the project.
EDUCATIONAL BACKGROUND:
June 13,2000-October 15, 2004 Mapua Institute of Technology Intramuros Manila,
Republic of the Philippines
Bachelor of science in Electronics and Communication Engineering ( B.S ECE )
June 5,1990-April 12,2000 Pangasinan Universal Institute 蜂省大同中学
Primary(6YRS) and Secondary(4YRS) Education with Chinese Language
WORK EXPERIENCE:
Client : TAKREER OIL COMPANY
Company : Daewoo Engineering and Construction Co Ltd
Place : Al Ruwais Abu Dhabi, UAE
Position : Piping Test package Engineer / Piping Engineer
Period : July 25, 2013 - December 7, 2014
Project : RRE PROJECT EPC4 STORAGE TANK FACILITIES
Key Responsibilities:
Prepare hydro test packages from Isometric drawings Mark up as built drawings
Provide technical assistance to field staff and Act as hydro test supervisor as and when required
Generation of progress /status reports relating to hydro testing
Checking the correct preparation of the piping pressure test dossiers by Execution Contractor according the documents listed in test packs management procedure.
Checking that last revision of engineering documents has been included in the test packages.
Checking the conformity between the P&ID, isometric drawings and line lists included in the piping pressure test packages.
Highlighting to the engineering department the problems related to the items.
Review and evaluation of any proposals/requests for technical modification related to piping test and provide technical support in decision making.
Interface with other project disciplines to ensure smooth, reliable and timely flow of data, and information related to piping pressure test activity.
Review and approval of all piping test packages -review includes following activities:
Confirming Test Pack numbering is correct
Confirm test medium is correct according to the line list and flushing method is correct
Confirm design pressure and test pressure is correct according to line list and within the allowable pressure for the pipe specification
Confirm filling points, venting points, and drains are acceptable
Confirm test boundaries are reasonable - evaluate exclusion zones
Confirm valves, instruments, etc. that need to be removed are identified
Confirm pressure gauge and relief valve location
Client : Esso Highland
Company : Daewoo Engineering and Construction Co Ltd
Place : Papua New Guinea
Position : Piping Engineer (HYDROTEST PACKAGE)
Period : March 1, 2013 – April 18, 2013
Project : PNG LNG Project Piping Works
Key Responsibilities:
Prepares System Check sheets serves as the Test pack using windows project control system(WinPCS) as per Client’s requirements based on Projects and Specifications.
Prepares Flange management Sheet for each flange to flange connection on the piping system and closely coordinate to the engineering department for the correct torque settings of each flange to flange connection as per Client’s Projects and Specifications.
Coordinate with Engineering department for any engineering queries (i.e. latest approved as-built drawings, mark-up and P&ID, any revisions to the technical specifications, etc.) that may arise relative to the Work pack being developed.
Any QA/QC matters that needs to be cleared must be closely coordinated with the QA/QC Department specifically the documentation requirements.
Monitor progress, completion and close-out of all Work packs issued to the various Contractors.
Keep records of all documentation.
Observe administrative and safety rules and procedures.
May perform other duties as required by the Work pack Development Supervisor.
Client : SONATRACH OIL COMPANY
Company : Daewoo Engineering and Construction Co Ltd
Place : Arzew, Republic of Algeria
Position : Assistant Piping Engineer / QA Engineer
Period : November 4, 2010 – January 31,2013
Project : GNL Zone 3 Plant– Piping Works
Key Responsibilities:
Preparing the list of P&ID with test block, piping arrangement, isometric drawing, plot plan and line list for every test package.
Stamping of the test block or test limit to piping arrangement, Isometric Drawing (design and cutting) and set the required data(Title, Pressure)
Highlighted the plot plan, piping arrangement and line list for every test package.
Ensure the coordination of the Quality Inspectors and assisting the Quality manager in his duties and /or absence.
Co-ordination with the EPC Contractor & site construction team for all the inspection & approval.
Co-ordinate and monitor all the inspection and required tests and also record inspection & test made as per the contract plan and specification.
Ensures there is an efficient system for exchange of turnover information between the quality control, quality assurance leads, discipline coordinators, field engineers, technical coordinators, QC inspectors, and technical assistants and field technicians.
Collaborate with other functions to enhance project success.
Develop and maintain progress tracking sheets for distribution to project management.
Ensures that required quality records, quality documentations and documents registers are properly prepared and maintained.
Coordinate with DDCC and QAQC for the status of test packages
Monitor and control the status of punch list and exception lists relevant to quality dossiers.
Compliance with the site’s health and safety regulations
Client : Doëhle Company
Company : Philippine Sundt Construction and Development
Place : Makati City, Republic of Philippines
Position : Quality Assurance / Quality Control Engineer
Period : April 6, 2010 – October 26, 2010
Project : Doëhle Haus Manila
Key Responsibilities:
Inspection and monitoring of the project site in accordance of project specification.
Recording the daily activities.
Responsible for Quality of material that used in site project.
Review of submitted Quality Documents and Test results.
Implements, administers and controls the Quality Assurance & Quality Control plan for the project activities.
Ensure the coordination of the Quality Inspectors and assisting the Quality manager in his duties and /or absence.
Ensures that required quality records, quality documentations and documents registers are properly prepared and maintained.
Scheduling of Construction works/manpower
Checking the elevation of formworks
Maintaining the formworks in the proper position like the elevation of slab
Estimates actual concrete volume requirement
Checked concrete requirement against program
Coordinate and transact ready mixed concrete supplier for the project concrete and design requirement.
Testing of concrete
Prepares concrete pouring request to be signed and approved by General Contractor’s Site Engineer
Directly supervising all masons regarding concrete work and finishing aspect of project.
Client : YEMGAS OIL COMPANY
Company : Le Duc SA, France
Place : Bal Haf, Republic of Yemen
Position : Quality Assurance / Quality Control Engineer
Period : July 1, 2006 – July 8, 2009
Project : YEMGAS LNG Plant- Civil and Marine works
Key Responsibilities:
To ensure field staff is strictly adhere to the defined QA/QC procedures.
Liaise with clients and consultants when required.
Maintain record of all site instructions either by the clients or by the consultants.
Co-ordination with the consultant & site construction team for all the inspection & approval in associated civil works.
Devise and formulate different teams for specific tasks in each trade.
Preparation of project quality plans.
Concrete pouring inspection, sampling and testing.
Ensure preparation and incorporation of all the work methods and corresponding Inspection & Test Plans and formats.
Assist site Management in effective implementation of quality plans & procedures.
Responsible for supervision, inspections & documentation of all the work related to QA/QC as per ITP, in line with project specification & approved drawings.
Co-ordinate and monitor all the inspection and required tests and also record inspection & test made as per the contract plan and specification.
Preparing monthly QA/QC reports.
Co-ordinate the document controls of technical submittals, drawing etc. with the Project Team and to ensure that the QA/QC validation has been done and also to ensure their issue, amendments and recall of controlled documents.
Controls an efficient library of up to date Codes, Standards, etc.
Monitors issue and closeout of corrective and preventive actions.
Client : YEMGAS OIL COMPANY
Company : Hawk International Finance & Construction Co. Ltd
Place : Bal Haf, Republic of Yemen
Position : QC Document Controller
Period : Jan 5, 2006 – June 8, 2006
Project : YEMGAS LNG Plant Site Preparation
Key Responsibilities:
Updating and maintaining the document management system registers and schedules.
Ensuring document management procedures and work methods are followed.
Producing reports and schedules as directed.
Registering and distributing all incoming mail in cooperation with clerical/admin staff.
Registering outgoing mail in cooperation with clerical/admin staff.
Interfacing with the project team and subcontractors in resolving problems and issues
Relating to documentation.
Generating reports from documentation data held on Build Online and onsite servers.
Carry out various functions related to project document receiving & transmittal, safekeeping & maintenance of project document archives, document imaging, and document reproduction and distribution.
Ensures proper safekeeping of document and good quality of work output.
Data input to database related to document receiving & tracking, document transmittals, document imaging and project document archive, document reproduction & distribution.
Electronic-transmission of document, in accordance to project distribution system under the guidance of a senior document controller.
Document classification, sorting, filing, archiving and retrieval of document in accordance to project document indexing and filing system.
Prepare occasional reports as may be required.
Ensure that works on site are carried out using the latest revisions of drawings.
Ensures that required quality records, quality documentations and documents registers are properly prepared and maintained.
Company : Paris-Manila Technology Corporation
Place : Makati City, Republic of Philippines
Position : Service Engineer
Period : November 10, 2004 – October 26,2005 (Working period)
August 9, 2004 – October 8, 2004 (On the Job Training)
Project : Power System
Key Responsibilities:
Commissioning and Maintenance ( Power system)
Repair and Calibrate ASCOM and BENNING Rectifiers
Installation of Power System
SKILLS
Computer Skills Office Application
MICROSOFT POWER POINT, MICROSOFT WORD, MICROSOFT EXCEL,
COREL, Autodesk AutoCAD 2010,3D studio Max and Naviswork,
Programming Languages
MICROSOFT VISUAL BASIC, MICROSOFT VISUAL C++, JAVA
Technical Skills
TEST PACKAGE PREPARATION AND TESTING
PC ASSEMBLY, TROUBLESHOOTING, ELECTRONIC REPAIR.
SEMINAR AND TRAINING ATTENDED:
3G and EDGE August 20,2004
GPS and Satellites System August 9, 2004
Bluetooth July 30, 2004
Marine Navigation Technology July 10, 2004
Aeronautical Navigation Technology June 25, 2004
Analog IC May 15, 2004
Biomedical Technology April 26, 2004
QUALIFICATIONS:
License Engineer ECE0035980 (Republic of Philippines)
Cooperative, dependable and can easily adopt methods and enhance them to be more effective.
Has the capacity to work systematically and independently under maximum stress and pressure.
Honest, responsible and hardworking.
Knowledgeable in Civil, Piping and Electronics Engineering.
PROFESSIONAL STRENGTHS
Dedicated to offer service beyond expectations, able to nurture relationships and cultivate positive rapport
Notable interpersonal skills, with ability to relate to people
Responsible and patient in dealing with given tasks or projects
Able to manage and handle pressures
PERSONAL BACKGROUND:
NICKNAME: JEFFREY
Date of Birth: April 22, 1983
Place of Birth: Dagupan City,Pangasinan
Age: 32 years old
Nationality: Filipino
Blood Type: A+
REFERENCES:
Eng’r. Benoît Saint Marty Eng’r. Rémi De Jesus Lopes
Project Manager, Le Duc SA France QHSE, Technip France
*************@*******.** *********@*******.***
+33 6 37 38 75 33 +33 6 09 59 88 06
Eng’r James Dy Eng’r. Benoît Lepetitcolin
Project Engineer, Sun Cellular DMPI Project Engineer, Saipem France
*********@*****.*** ******.************@****.*****.**
+63-922-***-**** +33 6 88 04 80 84
Eng’r. Karim Khaddour Eng’r. Chang Soo Park
Marine Works Superintendent, Hydro / Piping Manager
ENI et SAIPEM, Algerie Daewoo E&C, Algeria
*****.*******@*******.*** ************@*********.***