Post Job Free

Resume

Sign in

VP of Operations

Location:
Agoura Hills, CA
Posted:
July 09, 2015

Contact this candidate

Original resume on Jobvertise

Resume:

CONFIDENTIAL RESUME OF:

Richard A. Camarda

***** *** ***** **

Agoura Hills, CA 91301

408-***-****

Linkedin: http://www.linkedin.com/pub/rich-camarda/1/522/40a

CAREER OBJECTIVE: Senior Management position in Manufacturing, Operations, or Engineering.

EXPERIENCE: More than 20 years direct experience in Manufacturing, Engineering, and

Operations, for technology companies, including Contract Manufacturing, which

included operations in the USA, Singapore, Malaysia, and Mexico.

Led several offshore Manufacturing, Engineering & Technology Transfers. Several years of NPI experience, with

extensive RF, Medical, Automotive, and Box Build product experience. Implemented Lean Manufacturing & Kaizen

programs for several companies, and trained executive staff in those techniques

April, 2014 to January 2015: Globaluxe Corp.

General Manager

Hired to turn around Operations in preparation for growth from $6M to $20M in sales, including all

Manufacturing, Materials, and Logistics operations. Hired and put key staff in place, as well as the

implementation of MRP, Lean Manufacturing, 5S techniques, Procedure outlines, and Regulatory documents.

This has resulted in significant functional improvements, and the implementation of processes necessary to

scale the operation. Currently sales have improved by 50% over last year, and inventory is back in control,

and monitored.

2012 2013: FLEXSTAR CORPORATION

Vice President of Operations

All Manufacturing Operations, including the Quality, Materials, Customer Support, and Logistics

organizations directly report to me. Implemented processes and controls for production scheduling, material

planning, and customer service. Acquired 33,000-sq. ft. facility, and coordinated move and layout of facility

to improve efficiency and growth potential. Staffed functional teams for the Manufacturing, Materials and

Customer Support departments.

2010 2012: SMTC CORPORATION

Vice President & General Manager West Coast Operations

Had full P&L responsibility for the San Jose manufacturing facility. Was hired to turn around and grow the

operation, and have established new Engineering, Quality, Manufacturing, and Materials organizations. I

implemented Lean Manufacturing, and 5S programs, including cell manufacturing, and visual instructions

throughout the factory. Factory is now a model for the company. In 2010 the site received a commendation

from the City of San Jose for our latest expansion efforts, and providing the opportunity to grow jobs in the

region.

Put plans in place, and acquired FDA, FDB, and ITAR registration for the San Jose site, having that site as

the only site in the Corporation with these certifications. I was instrumental in the acquisition and integration

of another local $30M CM into the San Jose site, more than doubling the revenue, and adding high-end RF

product capabilities.

2003 - 2010: JAE OREGON INC

Senior Director of Operations

Had full responsibility for all of JAEs Tualatin, Oregon and Tijuana, Mexico Operations, including

Manufacturing, Quality, Engineering, and Materials. Accomplished the expansion, and renovation of Mexico

operations and facilities into new buildings. Grew the Mexico operation from 100 employees to 500

employees, and increased revenue contribution from 20%, to over 50% of the companys total revenue.

Implemented several Lean Manufacturing, and Kaizen programs at both facilities. Saved over $2.5M in

manufacturing cost from 2005-2007. Implemented the direct ship of product to customers from Mexico. In

2004 I was promoted to the Senior Staff, and in 2007 relocated from San Diego to Oregon to manage both

Oregon, and Mexico Operations. These operations included injection molding, metal stamping and plating,

wire harness assembly, and several test capabilities.

2002 - 2003: TENSOLITE RF CONNECTION DEVICES

Senior Director of Operations

Reporting to the Senior VP of Operations, I had responsibility for the Long Beach manufacturing RF Device

facility, including all of the operating groups. Was hired on to establish a new management team, including

materials, manufacturing, and quality personnel. Put systems, and processes in place to grow the business

over 50%. Participated in multi plant (Florida, Washington, and California) continuous improvement, Lean

Manufacturing, and Kaizen events.

2000 - 2002: COMTEL ELECTRONICS

Vice President & General Manager

Reporting to the CEO, I had full P&L responsibility for the Tustin Contract Manufacturing facility. I was

hired on to turn around the operation from an under $20M yearly revenue at negative profit. While adjusting

the customer base from 27 high mix, low revenue, to less than 15 lower mix and higher revenue, the annual

revenue was increased to a profitable $50M. All Manufacturing operations, as well as the Engineering,

Quality, Materials, and Logistics organizations directly report to me. Product included RF, Medical,

Industrial, and Network products. Set up processes and controls for production scheduling, and customer

commits, as well as material planning and routing. Completed re-layout of 65,000-sq. ft. facility to improve

efficiency and growth potential. Built new functional teams and management staff for Engineering,

Manufacturing, and Program Management departments.

1996 - 2000: GSS/ARRAY TECHNOLOGY

Vice President of Operations & General Manager

Reporting to the President, I had full P&L responsibility for the San Jose contract manufacturing facility.

Direct reports to me included all of the Manufacturing Operations, as well as the Engineering, Quality,

Materials, and Logistics groups. Had the responsibility for the Manufacture (Prototype through Production),

and repair, of 25 customer product lines in the electronics, and communications industry. Products included

several RF, Micro Cell radios, and Wireless Network products. Set up processes for production scheduling,

and customer commits, as well as material planning, and routing. Set up NPI process for the coordination of

all product, process, and technology transfers to the Thailand facility.

Was assigned in Thailand for 1 years to set up a 250,000-sq. ft. Manufacturing Plant, from the ground up.

Designed production flows, manufacturing processes, and factory layout. After completion, and the setup of

this facility and systems, I remained as the Senior Operations Director for the Bangkok Plant. Coordinated

activities with Manufacturing, Engineering, and Quality departments daily to meet manufacturing schedules

for $250 million annual revenue plan.

1994 - 1996: SURPLUS SOLUTIONS/WS ELECTRONICS INC.

Vice President of Operations / C.O.O.

As one of the three principal owners, had the responsibility for all Operations, including Finance, Materials,

Logistics, Facilities, and Technical Service and Support. Products included a variety of Computer and

electronic equipment, both new, and used for Retail, and Wholesale markets. Yearly revenue was $8M per

year.

1992 - 1994: ALLIED TELESIS INC.

Senior Director of Operations

Had responsibility for Manufacturing, Logistics, Material Planning, Manufacturing Engineering, Test/Process

Engineering, Document Control, New Product transfers, Production Control, and the Worldwide Service

Center operations.

Directly responsible for all Manufacturing processes locally, and offshore at the sub-contract locations.

Revenue was $200M per year. Located 80% of time in Singapore setting up the offshore operations. This

operation grew to 100 people managing the sub-contract manufacturing operations in Thailand, Malaysia, and

Singapore. Put together Transfer plans, and procedures to move 10 different Ethernet hardware product lines

to the offshore sub-contractors. Set up box build manufacturing, and Test processes for Contract

Manufacturing in Singapore, and Thailand.

Defined, and was part of, a core team to install a new corporate ERP system. This included all aspects of the

system, from Sales Order Entry and Distribution, to MRP and Inventory Control. The software was

MFG/PRO, by QAD, and installed on HP hardware.

1986 - 1992: MAXTOR CORPORATION

Senior Director of International Operations/Corporate Logistics

Managed the International Operations group, which supported all Offshore Organizations.

Installed Manufacturing and Test lines in the Singapore, and Penang factories, including the capacity

planning for all test equipment, tooling, and resource requirements for the Singapore and Penang facilities to

meet Manufacturing targets.

Interface with Offshore and Domestic Production Control organizations to attain schedules.

Had the Worldwide responsibility for the Order Management, Product Scheduling,

Customer Support, and Corporate Logistics organizations. Prime interface for OEM and

Distributors worldwide for new orders & repair coordination. Key interface with the Business

Management and Marketing/Sales organizations in forecasting corporate production build plans.

Managed the consolidation project for IT, Order Management, and Field Service operations into a

Consolidated corporate system. This included a Worldwide Order Entry and Shipping system.

PROFESSIONAL REFERENCES:

Rick McMahon

VP & General Manager JAE Oregon

503-***-****

Robert Zinn

CEO ZF Array Technology

408-***-****

Don Simpson

Vice President of Operations, RuggedCom

416-***-****

Art Melgoza

Materials Manager, Flexstar Technology

408-***-****

Nevin West

NPI Manager, Allied Telesis

408-***-****



Contact this candidate