OBJECTIVE

I am a Project Management Professional in Oil and Gas sector with 33 years of

experience. I am a professional focused towards goals and am results; maintain excellent

interpersonal relations and have great capacity to work amicably individually and in a team

with multicultural atmosphere. I have a high sense of commitment with the assigned

functions and a high degree of responsibility and easy interpretation of the organizational

policies, perfected by means of working at all levels in the industry. I have the ability to

perform under pressure and deliver to the deadlines committed to.

EDUCATIONAL QUALIFICATIONS

B.Sc. (Civil Engg.) Delhi College of Engineering 1982

Certificate in French Language Delhi University - 1984

Diploma in French Language Jawaharlal Nehru University, Delhi-1985

Advanced Diploma in French Language Jawaharlal Nehru University, Delhi -1986

SYNOPSIS OF PROFESSIONAL EXPERIENCE

Thirty three (33) years experience in the implementation of offshore/onshore projects for

Oil and Gas Industry. During this period have been involved with conceptual stage through

to FEED to detail design including and up to final installation stage and handover of

wellhead and process complex platforms. My strength lies in project management of

Conceptual, Feasibility, Feed studies and Detail engineering.

From 1996 to 1st June 2015 Qatar Petroleum (Formerly known as QGPC), Qatar had

employed me in the Offshore Project Department as a Lead Project Engineer. I was

responsible for all projects related to Field Development (new platforms, pipelines,

umbilicals and modifications of existing platforms) and infrastructure. Responsibilities

include conceptual and FEED studies including Quantitative Risk Assessment (QRA)

studies, preparation of EPIC tenders and specifications, execution of EPIC contracts,

mitigation of claims, implementation of in-house detailed engineered projects including

procurement, budget and schedule control etc and not to forget man management. Most of

Concept Optimization, Feasibility and FEED for all projects was done in-house in Qatar

Petroleum coordinated by me.

From 1995 to 1996, I was working with National Petroleum Construction Company

(NPCC), Abu Dhabi, UAE as an Offshore Structural Engineer. During this period, I was

involved in detailed and installation engineering of various offshore platform projects.

From 1982 to 1995, I was working for Engineers India Limited (EIL), New Delhi at various

levels as an Offshore Structural Engineer and Project Manager. During this period, I was

involved in conceptual design, FEED, detailed design of various offshore platform projects

and lead a team of 7 key discipline engineers.

EMPLOYMENT SUMMARY

September 1996 till 1st June 2015 Qatar Petroleum, Doha, Qatar.

July 1995 Sept. 1996 National Petroleum Construction Company,

Abu Dhabi, U. A. E.

July 1982 July 1995 Engineers India Limited, New Delhi, India

KEY FUNCTIONS AND RESPONSIBILITIES

In my capacity as Project Management person, my key functions and responsibilities in

terms of performing and supervising various activities were as follows:

Project Management:

Carryout conceptual/Feasibility study on receipt of new Statement of requirement

(SOR) for field development and provide technical inputs, costing details and schedule

for implementation.

On receipt of SOR carryout the following activities:

Lead the in-house design team for carrying out Conceptual study, Pre-FEED and

FEED. The team typically consists of Process, Piping, Instrumentation, Structures,

Pipelines, Loss Prevention, Telecom, HVAC, Mechanical and Electrical engineers.

The FEED includes carrying out pipeline QRA as per Corporate Safety regulations.

Apply and get Environmental Authorization from Ministry of Environment.

Raise CAPEX budgets

Prepare FEED/ EPIC SOW.

Prepare General scope for contract with schedule. Collate and coordinate FEED

deliverables.

Carryout Risk analysis for the project.

Get approval of FEED from Operations, Safety and Maintenance groups.

Carryout technical and commercial evaluation of bids, which includes communications

with bidders, site visit, report writing and approvals from Corporation committees.

Supervise the team for implementation of projects and advise management of the

progress, bottlenecks and actions taken.

Implementation of FEED/EPIC contracts including progress monitoring, deal with

claims, mitigate delays, keep an eye on compliance with design and safety aspects,

fabrication, installation and handover of facilities. This involves interaction with

client/contractor/vendors, preparing and maintaining project schedules and budgets,

interaction with Operation, Maintenance, and Health Safety & Environmental Groups

during execution. The design phase involves review/approval of contract deliverables.

Initiate and have QP team during fabrication to monitor progress and keep check on

Quality of fabrication. The installation phase involves mobilizing of QP team to

contractors vessels and keeping tab of logistics & Quality of works and day to day

coordination with site. Revisit Risk analysis at various phases of the project and

mitigate risks where feasible.

Apart from EPIC contracts, have dealt with cases where QP has carried out FEED and

detailed design, procured and installed piping portion of the modifications required.

This role involved preparation and co-ordination of detailed engineered packages,

procurement including follow up with vendors, preparation of work packs, finalization

and award of miscellaneous Contracts( for instrumentation and telemetry), interaction

with client/contractor/vendors, preparing and maintaining project schedules and

budgets, interaction with Operation, Maintenance, Health Safety & Environmental

Groups during execution.

Prepare scope of works for engineering contractors to carry out FEED and/or Detailed

engineering and after the evaluation & award of contracts, review the progress and the

quality of works being performed.

Ensure effective document control for all projects from Initiation to handover/closeout

of the project.

Participate in development of policies and procedures.

DETAILED WORK EXPERIENCE

September 1996 to 1st June,2015 : Qatar Petroleum, Doha, Qatar.

Position Held : Lead Project Engineer

Principal Responsibilities:

Was responsible for new offshore and infrastructure projects and existing structures

covering FEED and implementation:

New wellhead jackets, pipelines and umbilical projects;

Modifications to topsides or pipelines;

Replacement of pipelines;

Budget and schedule;

Procurement of materials including evaluation, monitoring of the vendors progress;

Support to other departments on offshore structures.

Subsea Cable project

Projects Handled

NEW Wellhead Jacket for North Field Alpha: The project called for new wellhead

jacket urgently as well tubing of existing wells is corroded and needs work over. Work

over of existing wells will require shutdown of wellhead jacket meaning loss of crucial

gas for industries in Mesaieed of Qatar for 2 years. Due to criticality of the project, we

decided to implement it unusual way. This wellhead jacket is different from earlier

wellhead jackets as it handles gas and has number of utilities onboard. We are going

to make jacket and temporary deck available for drilling while we carryout Pre-FEED

and FEED for Topsides, pipelines and modification on receiving complex. PIN was

approved in Feb 2014 and budget is around USD 300million. FEED for Topsides,

pipelines and modifications awarded to Ranhill WorleyParsons, Kuala Lumpur and I

was assigned role of Project Manager posted in Consultant office with complete team

to oversee FEED. Was in that position till reorganization occurred in Qatar Petroleum.

SUBSEA Power Cable Project for Halul: The project calls for 2 numbers of 132kV

submarine cables to supply power to Halul Island from shore. The island is 100kms

away and includes substation at each end and have logistic constraints of weight of

cable on a single ship while installation as well as delivery duration. Managed the

FEED which was carried out by Worley Parsons Qatar in record eight months including

geophysical and geotechnical surveys on the route. The cost of project is USD 550

million and has schedule contract completion in 48 months i.e till June 2016. Both

cables are installed and burial of cable ongoing. Was asked to shift in Jan end 2015 for

North Field Alpha wellhead jacket project.

SUBSEA Power Cable Project for NFA: The project calls for one numbers of 66kV

submarine cables to supply power to NFA platform from shore. The island is 80kms

away and includes substation at shore and modifications on the offshore platform to

receive power. We also require hot oil heaters to be provided as WHRU will not be

able to provide hot oil when receiving power from shore. Managed the FEED which

was carried out by WorleyParsons Qatar. Project was shelved based on cost increase

from Feasibility to FEED by multiple times.

BH-I03, BH-M04 and BH-D05 WHJ and associated pipelines and Modifications :

We had carried out conceptual study/Feasibility and provided inputs to the new

statement of Requirement including optimized pipeline and umbilical routing, cost,

schedule and Environmental Authorization. The FEED was carried out in-house in QP

and took more than usual time as additional miscellaneous pipelines scope got added

at last minute. Total of 16 projects were included in EPIC scope as FEED undertaken

by QP. The tendering was also tricky as had 3 Iranian bidders who had not done any

international works. The award was done in April 2006 for subject works for cost of

approx. USD 260 million. The project was delayed at each phase of Engineering,

procurement, fabrication and installation. The hook-up and modifications works

involved work on 26 existing platforms and was a logistics nightmare. Finally work was

completed and commissioned in July2009.

MFM Project: This project started in 1999 was handed over in 2005. The Multiphase

Flow Meter at that time was an advance technology and provided the oil/gas/water

quantities without actually separating the well fluid. The project stages involved calling

all MFM suppliers for trial testing during bidding stage and technical evaluation was

based on the trials. The implementation part of MFMs on existing wellhead jackets

were taken up in parallel and engineering carried out by Engineering Consultant and

QP procured the materials. The installation contract was awarded separately and 16

MFMs were installed on 12 whjs. The platform modifications required shutdowns to

commission the MFM's. The MFM was based on use of radioactive source and Qatar

had implemented in-between new law for radiographic sources and had to streamline

the licenses required for QP & Contractor to actually get sources in Qatar and to

offshore locations. The closeout involves settling of claims by contractor as some of

the delays were attributable to new law and QP supplied materials. Project cost US $

7 million.

Water mist and HSSD on Process Complex: The project was basically to remove

Halon Fire suppression and provide suitable alternate fire suppression system. This

involves provision of water mist system in 3 RGTs and AEG turbine in PS-2, 4 RGTs

and AEG turbine in PS-3, 2 RGTs and 2 generators in PS-4 and HSSD(High

Sensitivity Smoke Detection) in LQ of PS-4. The project was finished with delay in

schedule as platform modifications required extensive shutdowns. Project cost was US

$ 3.5 million.

Miscellaneous Projects: The projects involved well hook-ups, platform modifications,

provision of ESD valves, sub sea isolation valves etc. The works were detailed in-

house, materials procured and installed using in-house resources. The miscellaneous

works like instrumentation and telemetry are contracted out. In one instance, we

carried out conceptual study for Umbilical required, procured the umbilical directly and

installed using QPs DP vessel. FEED and detail engineering done by QP in-house.

BH-N09 WHJ and associated pipelines: Involved from conceptual study/Feasibility

till handover of the platform and associated pipelines and platform modifications.

FEED done by QP in-house. The platform is designed for a 20m-water depth with a

jacket configuration of 4+0 and 48 pile size. The pipeline sizes are 6", 8" and 12" with

total pipeline length of 10km and X-60/X-65 material grade. Scope included

modifications on 3 existing platforms. Project cost was US $20 million.

MM-IO5 WHJ, associated pipelines and 2 replacement pipelines in MM Field:

Involved from conceptual study/Feasibility till handover of the platform and associated

pipelines and platform modifications. FEED done by QP in-house. The platform is

designed for 35m water depth with a jacket configuration of 4+0 and 48 pile size. The

pipeline sizes are 6" and 8" with total pipeline length of 5km and X-60/X-65 material

grade. Scope included modifications on process complex. Platform and facilities

handed over Aug 2002. Project cost was US$ 19 million.

MM-G07, BH-G09 and BH-M05 Well Head Jackets (WHJ) and associated

pipelines in MM & BH Field: Involved from conceptual study/Feasibility till handover

of the platform and associated pipelines and platform modifications. FEED done by QP

in-house. The project involved extensive modifications on existing jackets/platforms,

which were detailed and executed with in-house resources. The platforms were

designed for 45 m to 15m-water depth. The jacket configuration was 4+0 for all

jackets. The deck lift weight is 450MT and the jacket weight varied between 300 MT to

500MT. The Pile size used was 48 and 60. The pipeline sizes varied from 6" to16"

with total pipeline length of 50km and X-60/X-65 material grade. The pipelines and

topsides for MM-G08 wellhead jacket were also included in this project. Platform and

facilities handed over Aug 2000 and closed accounts in 2001 including settlement of

claims by the contractor. Project cost US$75 million.

MM-G08 Well Head Jacket: Involved from conceptual study/Feasibility till handover of

the platform for drilling. FEED done by QP in-house. The platform is designed for a

35m-water depth with a jacket configuration of 4+0 and 48 pile size. The platform was

required to be relocated due to pile refusal in calceranite layer. Scope included

modifications on process complex. Project cost US$7 million.

BH-D07 WHJ, associated pipelines and Uwainet segregation in BH Field: Involved

from conceptual study/Feasibility till handover of the platform and associated pipelines

and platform modifications. FEED done by QP in-house.This project involved

installation of collection of Uwainet wells(XXHP) separately and flowing to XXHP

separator at PS-3 complex. The pipeline size varied from 6" to 12" with total pipeline

length of 57km and X-60/X-65 material grade. The platform is designed for a 45m-

water depth with a jacket configuration of 4+0 and 48 pile size. The platform was

required to be relocated due to pile refusal in calceranite layer. Project cost US$ 36

million.

BH-K05 WHJ, Flare and flare bridges installation: The installation contract for this

project was already awarded and was involved in execution of the project after joining.

This project was special as the contractor had only fabrication facilities and had lacked

project management skills and we assisted him with installation of the structures and

pipelay. The project was delayed by one and half years and finally completed in 1998.

The awarded project cost was US$ 24.6 million.

JULY 1995 - SEPT. 1996 : NATIONAL PETROLEUM CONSTRUCTION

COMPANY, ABUDHABI, U.A.E.

Position Held : OFFICE ENGINEER (STRUCTURAL)

Principal Duties : STRUCTURAL DESIGN

Principal Responsibilities:

Provide overall technical support for new offshore project and existing structures covering:

Detailed Engineering and Installation engineering;

Support to other departments on offshore structures.

Construction and installation related engineering.

Prebid engineering.

Design of various construction facilities installation aids etc.

Projects Handled

Construction engineering for PLEM of Kuwait Oil Companys Calm Buoy Project. A pile

design, cathodic protection design and on bottom stability was carried out.

Pile drivability for PLEM piles for Single Point Mooring at Jebel Dhanna Project.

Strengthening of Hitch Pad eyes for Stinger V to suit Project requirements.

Construction engineering for Star Jacket of Maersk Oil Qatar for Al Shaheen Field.

Performed pile drivability analysis for the jacket and was involved in development and

implementation of fabrication drawings

Carried out Detailed Engineering for ARAB-D project of ADMA-OPCO, which

consisted of 9 new jackets, 6 decks and modifications on existing 3 decks to fit on new

jackets. This included analyses for In place, Lift for jacket and deck, On Bottom

Stability, Pile design, Deck Joint Design and Equipment Supports design for three new

jackets and all existing decks. The platforms were designed for a varying water depth

of 15-30 meters and the jackets configured as 4+0 with a pile size of 36. All piles were

concrete cast in situ piles.

1988 - July1995 : ENGINEERS INDIA LIMITED

Position Held : PROJECT MANAGER (DESIGN)

Principal Duties : PROJECT MANAGEMENT

Principal Responsibilities :

Provide overall focal point for new offshore project and existing structures covering:

Conceptual design, FEED, Detailed Engineering

Responsible to Client and Company Management

Responsible for Budget and Schedule

Projects Handled

All the following jobs except for one were performed for ONGC.

Engineering of Wellhead Platforms BH-22 & 25, PB, PD & PE modifications and

associated submarine pipelines. The platforms were designed for an 80-metre water

depth with 4+2 configuration and 60 pile size. Project cost US$ 35 million.

Responsible for design, detail engineering and procurement assistance for Well Head

Platforms RV-10 & RV-17 and associated pipelines. This was for development of

Godavari Field in East India. The platforms were designed for a water depth of 11m

with a 4+0 jacket configuration. This was a cost reimbursable job.

Responsible for design detail engineering and procurement assistance for Well Head

Platforms NLM-2, 4 & 7. This was the first Lump sum detailed engineering job

performed by EIL. Project cost US$1 million.

Responsible for conceptual study, preparation of bid package and evaluation of bids

for a Subsea Water Injection Project in Bombay High South Field.

Responsible for conceptual study, detailed engineering for conversion of Jack-up Rig

Sagar Kiran to an Early Production System.

Responsible for revamp jobs in Heera Field being undertaken on detailed engineering

basis including fact finding, preparation of material specification, review/evaluation of

offers, drawings/data review and involvement in actual execution of job.

Responsible for Conceptual study and basic engineering for Heera Phase - III Bid

Packages including process platforms, pipelines, wellhead platforms and associated

modifications.

Was involved in pre-bid engineering for a Gas Compression Platform in the White

Tiger Field of Vietnam. This was a joint bid put up with Samsung.

Was responsible for the basic and detail engineering for three new Well Head jackets

and associated pipelines in Bul Hanine and Maydan Mahzam Fields of QGPC. These

were the first 9-slot Well Head Platforms installed by QGPC. Project cost US$2.5

million.

1985 - 1988 : ENGINEER - STRUCTURAL

Principal Responsibilities:

Provide overall technical support for new offshore platform projects and existing structures

covering:

Conceptual design including jacket configuration and pile size optimization;

Carry out FEED, Basic engineering and Work scope for EPIC tender;

Detailed and Installation engineering;

Review of EPIC detailed engineering and installation engineering documents;

Support to other departments on offshore structures.

Projects Handled

All the following jobs were performed for ONGC.

Design and basic engineering for Well Head Platform PA. Jacket was configured for a

4 + 0 configuration with a pile size of 72.

Design & detail engineering for Well Head Platforms II, IJ & IK. I performed the

Inplace, Fatigue, Load-out and Launch analyses. The jackets were designed for a 50-

75-metre water depth and a varying configuration of 4+2 to 4+4 with 48 pile size.

Assisted in carrying out basic engineering and design review of IC-Process Platform

and IC-Water Injection Process Platform. Each platform was 8-legged with living

module to accommodate 120 personnel, flare structure and connecting bridges. The

deck weight of IC-Process Platform was 5000 MT and IC-Water Injection Process

Platform was 4700 MT. These platforms were designed for a multiple lift using 2500T-

derrick barge.

Carried out detailed study to see effect of Marine Growth on offshore platforms in

Bombay High on base shear, overturning moment. The analysis was followed by a

change in our marine growth design criteria.

Carried out basic engineering and design review of Water Injection Pipeline and

Platform Modification Project in Bombay High.

Carried out basic engineering for Panna Process Platform.

Design and detailed engineering of Well Platforms N4, N5, N6, N7. Each Well Head

platform was designed for a varying water depth of 60 to 70 meters and the jacket

configuration was either 4+2 or 4+4. Performed the Inplace, Load-out, Launch, On-

bottom stability and Fatigue analyses.

1983 - 1985 : ASSISTANT ENGINEER - STRUCTURAL

Design and detailed engineering of Water Injection Well Head Platforms WI - 6 to 10 of

ONGC. All of these were four-legged platforms with 2 to 4 skirt piles in water depths of

about 70 m. Was responsible for on-bottom stability, launch and load out analysis of all

jackets.

1982 - 1983 : MANAGEMENT TRAINEE

Assisted for carrying out detailed engineering for Well Head Platforms NA, NB & NC in the

Bombay High. Assignment included analysis for inplace condition, load out, launch and on-

bottom stability analysis for the above Jackets.

PROFESSIONAL MEMBERSHIP

Member-Institution of Engineers, India

TRAINING COURSES:

Participated in four week course on design of offshore structures conducted by Indian

Institute of Technology, Madras, India.

Completed course on Project Risk Management

Completed course on Advanced Contract Management

Completed course on Managing Claims

Completed course on TDMS Training

Completed course on Defect Assessment in Pipelines

Completed Value Engineering Training Workshop (Module-1)

COMPUTER/SOFTWARE EXPERIENCE

Fully conversant with the MS WORD, EXCEL, MS PROJECT, POWER POINT and other

general softwares.

REFERENCES

Mr. Younes Messaoud, Asst. Manager Surface Development Offshore

Qatar Petroleum

Phone +974-******** Email acq5de@r.postjobfree.com

Mr. Naeem Mahmud, Lead Project Engineer

Qatar Petroleum

Phone +974-******** Email acq5de@r.postjobfree.com



Contact this candidate