Post Job Free
Sign in

Project Plant

Location:
United Arab Emirates
Posted:
May 27, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

AVINASH DABDE

Personal Information:-

Position Applied for: Sr. Piping Designer (PDS/PDMS/SP3D)

Permanent Address: 123 'A' Wing Shree Shalyam chs.,

Sivai Nagar,

Thane (West),

Mumbai - 400

606, India

Telephone Numbers: +971-**-***-**** (UAE), +91 99

30 00 19 31(India)

E-mail ID: *******.*****@*******.***

*******.*****@*****.***

Nationality DOB: Indian; 29 April, 1987

Passport Details: H5203720 - INDIA, Expires on

07 July, 2019

Status: Male, Unmarried,

Single

Total Experience: 10+ Year's

Education: Diploma in Mechanical.

Completed

Certificate Course in Piping Drafting & Design,

Completed

Certificate Course in Mechanical Draughtsman,

School

Secondary Certificate from Mumbai Board.

[pic]

Current Organization:- Sept' 2013 - Till Date working with Technip France,

Abu Dhabi, UAE as a Sr. Piping Designer.

Field of exposure:

Preparation of all kinds of piping drawings such as:

. Detailed Piping Designing

. Equipment Modelling Using Vendor Documents

. Nozzle orientation

. Piping layout

. Piping isometric

. Piping Support Drawing

. Clash checking in PDS/PDMS

. Review of engineering deliverables like General Arrangement

drawings, Piping

Arrangement drawings, Fabrication drawings, etc.

. Resolving Interface issues with other disciplines

. Implementing stress analysis comments in to the model

. Squad checking of other disciplines inputs

. Equipment Datasheets checking

. Site Visit for Pre-inspection in Iraq (From March 2014 to May

2014)

. Updating Plot Plan in Auto Cad

In-house Training:

. PDS (Plant Design System)

. PDMS (Plant Design Management System)

. SP3D (Smart Plant) Training Level

. MDS 12.1 (Multi-Discipline Supports)

. AutoCAD 14, 2000, 2002 To 2008

. Micro station.

[pic]

PROJECTS HANDLED:

Technip France (Abu Dhabi-UAE)

(January2014 - Till Date)

1) Project: - IRAQ South Gas Utilization Project (Rehabilitation Plant)

Client: - Basrah Gas Company (BGC)

Description:

. LPG (Liquefied Petroleum Gas)

. NGL (Natural Gas Liquid)

. Storage Unit

. Oil Treatment

. Utilities

Responsibilities:

Head Office Activity

. Based on P&ID's prepared Work Packages including Piping GA's,

unit plot plan.

. To identify particular valve at site, Tagging of valves done in

P&ID's.

. Prepared Unit Plot Plans as per PDF drawings.

. Defined scope of work (SOW) based on Pre-Inspection done at

site.

. Scope Definition Report (SDR) in generated based on scope of

work (SOW) & Hazop comments.

. Modelling in PDMS as built.

Site Activity

. As per prepared work packages at head office pre-inspection done

at site.

. Visually inspection of pipes, valve, fitting, & PSV's

. Based on pre-inspection decision sheet prepared at site.

(July 2013 - December 2013)

2) Project: - Al Dabbiya Phase III Field Development (FEED)

Client: - Abu Dhabi Company for Onshore Oil Operations (ADCO)

Area:

. Central Processing Plant (CPP) & cluster's

Responsibilities:

. Involved in Design and Routing of Piping systems,

. Logical Supporting of critical lines.

[pic]

Tebodin & Partner LLC. (Muscat-Oman)

Working As a Piping Designer

(April 2012 - June 2013)

3) Project: - Ghaba North

Client: - Petroleum Development of Oman

Area:

. L.P. Flare K.O.D.

. L.P. & A.P. Flare Package

. Gad Lift Manifold & Gas Injection Manifold.

Responsibilities:

. Involved in Design and Routing of Piping systems,

. Co-ordination with Stress / Process Group

. Support Designing for Piping as per Support Standards in MDS.

. Implementing stress comments in to the model.

. Logical Supporting of critical lines.

[pic]

Petrofac Engineering India Ltd. (Mumbai-India)

Working As a Piping Designer

(August 2006 - March 2012)

4) Project: - Shetland Gas Plant (Laggan-Tormore Project)

Client: - TOTAL

Area:

. Underground

Responsibilities:

. Responsible for Piping & Equipment's modelling.

. Isometric extraction. In PDMS.

5) Project: - South Yoloten Gas Field Development Project.

Client: - TURKMENGAS

Area:

. Boiler Area

Responsibilities:

. Equipment's & piping modelling in PDS.

. Issue isometric in IFC.

. Implementing stress comments in to the model.

. Logical Supporting of critical lines.

6) Project: - ASAB Full Development Project

Client: - Abu Dhabi Company for Onshore Oil Operations (ADCO)

Area:

. MSM (MULTI Selector Manifold)

. Closed Drain System

. Receiver & Launcher

Responsibilities:

. Preparing piping layout with the help of equipment layout &

P&ID.

. Equipment's & piping modelling in PDS.

. Issue isometric in IFC.

. Implementing stress comments in to the model.

. Logical Supporting of critical lines.

7) Project: - Ebla Gas Project

Client: - Petro-CANADA

Area:

. Pipe Rack

Responsibilities:

. Responsible for Piping & Equipment's modelling, Isometric

extraction,

Study designing & modification of main pipe rack In PDMS.

. Prepare inputs for civil engineering including identification of

rack locations, foundations in PDMS.

. Logical Supporting of critical lines.

. Implementing stress comments in to the model.

8) Project: - Hasdrubal Terminal project

Client: - British Gas- Tunisia

Responsibilities:

. Nozzle orientation Drawings, unit plot plan, using PDMS Draft.

9) Project: - Kauthar Gas Plant

Client: - Petroleum Development of Oman

Responsibilities:

. Nozzle orientation drawings, unit plot plan, using PDMS Draft.

[pic]

NEERA ENGINEERING PVT. LTD. (Mumbai, India)

Working As a CAD Designer

(July 2004 - July 2006)

10) Project: - IBI Chematur Engineering pvt. Ltd.

(Propylene Oxide Plant)

Responsibilities:

. Drafting study - piping & Equipment layouts, Piping G.A

drawings, Sectional drawings, Isometrics, Nozzle orientation,

Plot plan in Acad

[pic]



Contact this candidate