Result oriented Senior management Professional with 22 years of rich
experience in Plant Maintenance in Auto parts industries.
. Manages the staff, processes and activities for maintaining all plant
machinery to ensure safe, continual and efficient operation.
. Ensures that periodic and preventive maintenance are appropriately
scheduled and accomplished and that emergency troubleshooting and
maintenance support are readily available as needed.
. Oversees maintenance goal setting, activity scheduling, work
performance and performance management to ensure measurable goals,
proper workload distribution, goal satisfaction and effective staff
performance management.
. Monitors and continually improves maintenance processes and
maintenance personnel performance to achieve enhanced levels of
efficiency
Core Competencies
Plant Maintenance
> Managing the functions of troubleshooting and Proactive /Predictive /
Preventive / Shutdown maintenance for reducing machinery downtime to
minimum & increase machine up-time / equipment reliability.
> Undertaking various retrofitting works and overhauling of machines,
inspecting machines at vendors' end and at line setup, carrying out
regular Health Check up of Material Handling Equipment.
> Conducting process audits, reviewing existing processes and re-designing
the same for enhancing operational efficiency and achieving maximum cost
savings.
Installation & Commissioning
> Supervising the installation and commissioning of equipment; conducting
tests & inspections to ensure operational effectiveness of plant &
utilities.
> Reviewing drawings, layouts, diagrams, technical specifications,
reviewing & analyzing contractor's change order proposals & submittals.
Project Management
> Planning, scoping, tracking & implementing project plans within preset
budgets and deadlines.
> Executing projects involving scoping and execution within cost & time
parameters; coordinating the project activities and drawing
specifications with the clients to ensure product design as per client
specifications.
> Monitoring projects with respect to budgeted cost, demand forecasts, time
over-runs to ensure timely execution of projects; extending post-
implementation support; handling the delivery of financial reports.
Process Enhancement
> Undertaking regular inspections in order to prevent accidents and ensure
adherence to safety norms.
> Analysing existing processes / procedures and conducting critical
analysis for finding out shortcomings and suggesting improvements
measures.
> Taking stringent measures including preparation of necessary documents
and conducting audits to ensure compliance with standards; achieving
quality parameters as per monthly targets.
Organizational Experience
NSSL Pvt. Ltd. A G M Maintenance
Since Mar 2015
NAGPUR. It's Industrial valve manufacturer Known as Neco
Schubert & Salzer Pvt.Ltd.
Neco Group Leading Industrial valve manufacturer for Petrochemical
Industries, Fertilizer,Power plant, Steel Plant, Nuclear application,
Paper mills, Sugar Plants, Oil & Natural gas Industries & Allied process
Industries.
> Spearheaded Plant Maintenance of over 120 machines & 82 Cranes
including Mechanical, Electrical, Electronics, Projects, Utilities,
Safety.
> Planning and implementing proactive / predictive / preventive / shut
down maintenance schedules for machinery so as to increase machine up-
time / equipment reliability.
> Proactively identify areas of obstruction/ breakdowns and take steps
to rectify the equipments.
> Developing and implementing plans & schedules for Maintenance
Operations and Annual Turn Around with focus on optimum utilization of
manpower and material.
> Undertaking regular inspections to prevent accidents and adhere to
safety norms.
Durovalves India Pvt. Ltd. Manager Maintenance
Mar 2008 to Feb 2015
AURANGABAD. It's Engine Valve manufacturer JV between Scarpa &
Colambo Italy and Varroc group. Leading Automobile Components Manufacturer
and Supplier to International OEMs such as Fiat, General Motors, Evaco,
Volvo & Audi.
> Spearheaded Plant Maintenance of over 250 machines including Mechanical,
Electrical, Electronics, Projects, Utilities, Safety, etc. through a team
of over 45 people including 20 Engineers.
> Demonstrated excellence in complete Erection, Commissioning & Maintenance
of:
. CNC Turning Machines, C'less Grinding Machines and Cylindrical
Grinding Machines.
. Induction Hardening Machines, Friction Screw Press Machines and TIG
Welding Machines.
. Electrical Upsetting Machines, Extrusion Press Machines and Shearing
Machines.
. Heat Treatment Furnaces, Hard Chrome Plating Plants, Screw Air
Compressors and DG Sets.
. Cooling Towers, 33 KV / 440 V Substation and Switchgears.
> Steered the execution of various energy saving initiatives in the Plant
as Team Leader.
> Ensured strict regulatory compliance related with Electrical
Installations, Pressure Vessels, Lifting Tools & Tackles as Member of
Cross Functional Team (CFT).
> 50% reduction in breakdowns / downtime through effective maintenance.
> 3% escalation in OEE through effective maintenance.
> Increase in machine uptime from 94 to 98.7% .
> Active involvement in Plant Engineering / Up gradation / Enhancement /
Expansion Projects undertaken.
> Responsible for TPM activity as PM pillar head.
Varroc Exhaust Systems Pvt. Ltd. Asst. Manager (Maint.)
Jun. 2005 to Mar 2008
PUNE. It's a JV between Delphi Catalyst USA and Varroc group.
> Responsible for Plant maintenance & reporting to the Plant head.
> Utility-DG, Compressor, Water chiller, RO Plant, ETP.
> Worked towards achieving the set targets as per TS 16469/ TPM/ Safety.
> Working knowledge Allen Bradley/ Siemens/ Honeywell PLC based different
machines.
> Presentation of monthly objectives & achievements of dept. in MRM.
> Budget planning, Spares planning and procurement.
> TPM Chairman, Member of CFT, Leadership, Safety and Improvement team.
Major Achievement: Erection and commissioning of Catalyst
manufacturing facility in record time, Machine uptime above 99% of planned
production, Zero customer complaint, TPM activities in line with
Corporate Master Plan and Win BAL TPM award, Certified Internal Auditor for
ISO/TS 16949:2002.
M.S.Associates, MUMBAI. Consultant
Mar. 2001 to Jun. 2005
> Provided consultancy service for Reliance Petroleum Ltd. in various Gas
Pipeline project.
> Detail OFC Route survey for RTL in the state of Gujarat, Detail
Engineering route survey of proposed GTIL (Reliance) & GAIL Gas pipeline
in Maharashtra, Karnataka, Haryana & U.P.
Anurang Engineering Co. Pvt. Ltd. (Endurance Group) Maint. Engineer
Mar. 1998 to Mar. 2001
AURANGABAD. It's Leader of Aluminum Pressure Die casting parts
manufacturer for Two & Four wheeler.
> Attending daily break down, PM & reconditioning of Die casting machine
(HMT, BUHLER, YOTA),
> Utility - Furnace, Crane, Conveyor, Compressor, Fork lift, Tool room
machines and working knowledge of PLC.
> Responsible for Erection, installation & commissioning of die casting
machine and Plant facilities.
> Design and Drawing of Maintenance spare parts in Auto CAD R-14.
> Machines spare parts planning, manufacturing and procurement.
> TPM PM Pillar head.
Major Achievement: Manufacture in house Tie bar elongation checking
instrument, Reduction in Oil leakage about 60%, Reduce B/D due to 30%,
Introduce Oil filtration unit to reduce B/D due to contamination, Project
for Increase Tie bars & toggle pins life.
Automobile Product of India Ltd. (API) Maint. Engineer.
Apr. 1996 to Mar. 1998
AURANGABAD. It's leading Clutch, Break & Tie rod manufacturer For
Four & Six wheeler.
> Maintenance of Clutch shop (includes all types of SPM), Press shop (50-
550T) & Tool room machines.
> Utility - Compressor, Generator.
Kabsons Industries Ltd. Prod. & Maint.
Engineer Jun. 1994 to Apr. 1996
AURANGABAD. It's Gas cylinder manufacturer (2.2 & 5.5 Kgs.) With
brazing technology.
> Erection, installation & commissioning of LPG 5.5 Kg. Cylinder Plant.
> Maintenance of Press shop (50-350T), Heating furnace, bottling plant &
Tool room machines.
> Utility - Compressor, Generator.
Premier Engg. Works, PUNE. Trainee Engineer.
Apr. 1993 to Apr. 1994
It's small-scale industry manufacturing Gears,
Nozzles, and Mech.timer.
Academia
DIPLOMA IN MECHANICAL ENGINEERING From Govt. Polytechnic, Jintur in 1993
with first class i.e. 70%.
Software Skill
M.S.Office, AutoCAD2008.
Personal details
Date of birth: 04 Feb. 1968
Passport No.: F7029086
Marital status: Married
Nationality: Indian
Present CTC: 12 Lac P.A.
Expected CTC: 14 Lac P.A. (Negotiable)
Notice Period : Three Months
Chandrakant Gaddamwar