Imad Iqbal
Visa status: Greencard
Email: ****.****@*****.***
Contact: +1-832-***-****
Professional Summary:
. 8 years of international work experience in Telecom industry with an
excellent understanding of LTE/UMTS/CDMA/EVDO/EDGE/GPRS/GSM Networks.
. Implementation of new features and tuning LTE radio network parameters
. Proficient of RF Design,Optimization and performance lifecycle,RAN
Performance,Capacity and Features Testing.
. Multi-Vendor experience: Nokia Solutions & Networks, Huawei,Alcatel-
Lucent,Samsung,TEOCO(Aircom).
Tools:
1. Aircom Asset 2.Aircom CAPESSO 3.TEMS 4.Nokia NetAct 4.x/5.x
5. CM Oprtations Manager(NSN) 6.CM Editor(NSN) 7.Network
Editor(NSN) 8.BSS Splitting tool(NSN)
9. Rehosting Tool(NSN) 10.M2000(Huawei) 11.iManager(Huawei)
12.HIT 13.Mentum PLANET 4.5/5.5
14. BERT 15.MapInfo 16.Reveal PCMD tool 17.Falcon-RFISS 18.RF
Cockpit 19.eDAT 20.QCAT 20.QXDM 21.Google Earth 22.MicroSoft
Street and Maps 23.Windcatcher 24.LSMR 25.BSM
Professional Experience:
Samsung SDS America (January 2015 to Date)
Sprint LTE Tri-Band Project
LTE Multi Band RF Consultant
. LTE Tri Bnd traffic Management for 800FDD,1.9FDD and 2.5TDD
. Optimization of CDMA, EVDO and LTE networks to troubleshoot and improve
KPIs
. Analysis of KPIs, investigation and improvement of network quality
problems
. Analysis of neighbor relations and implementation of corrections
. Troubleshoot system problems such as Voice CFR/CDR, LTE
CFR/CDR,Throughput,RSRP/RSRQ etc.
. Perform root-cause analysis of RF issues to meet target KPIs
. Recommend parameter changes to improve performance and prepare status
reports
. Network elements monitoring, analysis, fine tuning, optimization and
troubleshooting
Alcatel Lucent USA (January 2014 to January 2015)
Sprint LTE Project
LTE Multi Band RF Consultant
North Carolina Market Lead for Non-FIT Technolgy Validation Project.The
test cases were formulated to validate the following functionality in TDD
and FDD :
. Idle Mode Cell Reselection
. Intra TDD/FDD Handover
. Billing Accuracy for Intra-TDD, Inter TDD-FDD data sessions
. Connected Mode Handover (CM-HO)
. Enhanced Circuit Switch Fallback (eCSFB) from 2.5 TDD LTE to 1900 MHz
CDMA
. User Experience on commercial services and applications (YouTube,
Speedtest and Skype)
LA Market lead for LTE NV2.5 Design-1 Dual Band Optimzation Project core
Objectives were:
. To optimize thresholds and triggers for Connected Mode handover
between 1.9 FDD and 2.5 TDD LTE
. Provide suitable RF conditions and optimal user experience to users in
mixed 1.9/2.5 environment
. Quantify and Report KPIs to represent user experience and network
behavior
Baltimore Market lead for LTE Tri Band Optimzation Project Objectives are:
. Optimize handovers in a Tri-band LTE environment (800FDD,1.9FDD and
2.5TDD)
. Traffic Management in Tri-Band LTE Environment (800 FDD,1.9 FDD and
2.5TDD)
. To calculate drive test based KPIs to capture user experience in tri-
band environment
Baltimore Market LTE Fit for Dual Carrier Traffic Management Objectives
are:
. Load Balancing Features activation on TDD LTE eNodes to avoid
Overloading conditions.
. Multiple Offloading Test Cases in TDD LTE Dual Carriers(2.5TDD)
environment
. All Coverage base HO Test Cases were succeefully exected and passed
Aircom International USA (March 2013 to December 2013)
Nextel Mexico Project
RF Design & Optimization Consultant
. Responsible for design, optimizing, analyzing and improving performance
of Nextel Mexico UMTS network.
. Worked on Aircom ASSET design and Capesso optimization tool for on
Nextel Mexico UMTS Design project .
. UMTS Design responsibilities involved to meet customer requirements in
terms of RSCP and Ec/Io per market level. Providing UMTS Design for short
term solution with only Electrical/Mechanical tilts variants,Azimuth
change,CPICH change etc. and long term solution with New sites, sector
adds.
. Responsible for capacity planning and Ec/Io ratio analysis. Site design.
Participate in the search ring process and assist in the selection of
cell sites that are RF-optimum.
. Develop Re-Design modification to existing sites for performance
enhancement.
. Re-design of sites (Height Reduction and Orientation) as required to
mitigate interference.
Sprint Network Vision Project
RF Design & Optimization Consultant
. Support CDMA and EVDO capacity for ALU, and optimization activities
including Sprint Network Vision playbook configurations.
. Optimizing towards meeting customer network SLA's and KPI's.
. Hand on Experience with sprint RF Tools like Cockpit, Falcon, iTunes NL,
REVEAL,Planet(4.5 & 5.5) and Mapinfo(9.5 & 11.5)
. Performance Analysis of daily KPI reports at Market,Site,Sector and
Carrier level.
. Site / cluster / antenna reviews, site acceptance and customer tickets.
Huawei Technologies Co.Ltd (July 2012 to March 2013)
RF Optimization Consultant
. Radio Planning and Optimization of an LTE network to trouble shoot
and improve KPIs .
. Preparing Root Cause Analysis (RCA) report in case of an
Emergency.(CARE).
. Analysis of KPIs, investigation and improvement of network quality
problems.
. Implementing SW upgrades,capacity increase license additions and
Change Deliveries.
. Analysis of neighbor relations and implementation of corrections.
. Creation of Drive routes for Drive testing.
. Responsible for planning and implementation of Trial projects as per
customer request.
. Technical coordination with other departments (Core CS, Core PS, OSS,
NWP & NPO)
. Responsible for pointing out poor coverage areas and recommend the
short/long term solutions.
. Trained on Huawei LTE and worked on test Node.In order to promote the
LTE technology.
Huawei Technologies Co.Ltd (June 2011 to June 2012)
TELENOR MS Project
BSS BackOffice Team Lead
. Successful Transition of Telenor BSS Managed Services Project from
NSN to HUAWEI.
. Responsible of the Configuration Management of NSN 2G,3G Sites
(Ultra,Flexi,BS240XL,BS82).
. Operation of Windows and Unix operating system environment and
applications.
. Responsible of Site Integration,Deletion,Re-parenting and Parametric
changes.
. Create XML files for Configuration changes.
. Conduct Technical interface with the customer.
. Responsible maintaining Configuration management Data Base.
. Coordination with the Optimization and Planning Team.
. Coordinate with the RollOut, FieldOperation Core,OSS and
Transmission Departments.
. Responsible for handling daily O&M issues and provide technical
support.
Nokia Siemens Networks (August 2009 to July 2011)
TELENOR Project
BSS BackOffice Engineer
. Worked On Swap Project (Swap of 1600 sites from Siemens BTS to Nokia
Flexi BTS )
. Technical contact point (TCP) working as interface between technical
analysts and customers.
. Creation of new Ultra-sites / Metro-sites/ Flexi BTS.
. Installation of different capacity increase licenses in BSCs.
. Cell broadcast (SMS Broadcast) via MML sessions. Providing support to
field Engineers during acceptance and Drive Test.
. Site Rehomming(BSS Splitt,Rehosting Tool)
. Site Expansions(BCF Add,BTS Add,TRX Add)
. Mass Modifications of Parameters through CM Editor.
. GPRS/EDGE Implementation,NSEI/PCU Dimensioning.
. Working on daily KPI issues.
. Execution on massive level of frequency retuning activities and radio
parameter configuration.
. External Alarms Creations and modifications.
. Channel Type Change Implementation i.e. Half rate, full rate, Dual
rate.
. MARs implementation through MML (Adjacent, NBL,CS34,MFR).
. MAR execution using Xterm and Xshell.
. CB Cell Info, FRL, FRU & MA List Change.
. ET/E1 testing and troubleshooting.
. Performing various tests as per RF Teams for optimization and planning
purposes.
. Creation and Management of Graphical Views,Sub Views of Network
Elements through Network Editor.
. Support PM(Performance Management) with operational issues and Fault
resolution of KPIs.
Nokia Siemens Networks (June,2008 till June 2009)
TELENOR MS Project
CS CORE Engineer
. Rehoming of BSC and BTS in R99 and REL-4.
. Reparenting of of BTS in R99 and REL-4
. M14,U4.1 RAM UPGRADATION in MSS,MGW.
. ROUTING and Numbering Plan Addition and modification.
. Deleation of JUNK data .
. ATER addition and modification.
. SIGNALLING LINKS Addition and modification.
. Excellent knowledge of Dependability performance parameters, KPI's and
their interpretation and use.
. Audit of MSS, MGW.
. Routine Health checks of MSS,MSC,GCS,MGW for REL- 4 and R99.
. Routine Fallbacks and Backups MSS,MSC,GCS,MGW for REL-4 and R99.
. No Audio Testing using BERT.
. Monitoring of ALARM arriving and their troubleshooting.
. Creation of new Database in Nokia REL-4 and Siemens R-99 Equipment.
. Solving Daily Service Desk Problems.
. IR24 Testing.
Academics
BE
Bachelor of Electrical(Telecomunication) Engineering.