Post Job Free
Sign in

Engineer Engineering

Location:
Quezon City, NCR, Philippines
Salary:
80000
Posted:
March 17, 2015

Contact this candidate

Resume:

*

CURRICULUM VITAE

Personal Data

Name : Paolo Antonio E. Lopez

Address : ** *. ******** **., **** 2, U.P. Campus, Diliman, Quezon City

1101

Tel. nos. : 632-***-**** (Home)

093*-******* (Cellular phone)

E-mail : *****.*****@********.***.**; ************.*****@*****.***;

********@*****.***;

Birth date: 25 May 1981

Age : 33 years old

Religion : Christian

Educational background

B.S. Industrial Engineering, University of the Philippines Los Baños, 2004

Relevant Courses

Basic Engineering Courses

• Engineering Mechanics-Rigid Body Statics & Dynamics

• Mechanics of Materials and Deformable Bodies

• Thermodynamics & Heat Transfer

• Engineering Materials

• Basic Electrical Engineering

• Fluid Mechanics

• Engineering Mathematics

• Engineering Graphics

Core Industrial Engineering Courses

• Manufacturing and Industrial Processes Engineering

• Production Systems

• Manufacturing Planning and Design

• Industrial Systems Design

2

• Ergonomics

• Methods Improvement and Time and Motion Analysis

• Systems Simulation

• Agro-Industrial Waste Management

• Occupational and System Safety

• Project Development and Management

• Information Systems

• Systems Evaluation

• Industrial Quality Control

• Operations Research

Studies Conducted

• The Effect of the Geometry, Position, and Depth of Indentations in

Determining the Strength of Aluminum, November 2000

• An Industrial Organization and Management Case Study on Allied

Concrete Products Incorporated, March 2001

• The Utilization of a Linear Induction Engine or Coil Gun in the Design

and Development of a Frictionless Linear Track, August 2001

• Methods Analysis of the Rovema 1 and 2 Lines of Bayer Crop

Science Canlubang Plant, February 2003

• A Case Analysis of the Production Systems of Coca-Cola Bottlers

Philippines Incorporated, Canlubang Plant, February 2003

• A Simulation Study of the Bottle Retrieval and Inventory of Coca- Cola

Bottlers Philippines Canlubang Plant, February 2003

• The Development of an Online Student Evaluation of Instructors of

the College of Engineering and Agro- Industrial Technology,

University of the Philippines Los Baños, February 2003

• Time and Motion Study of the Selling Process in Abenson Homeplus,

Calamba, April 2003

• A Feasibility Study on the Mass Production and Marketing of

Vegetable Nuggets, June 2003

• A Report on the Quality of Air in Metro Manila, October 2003

• Systems Analysis of the operations of University of the Philippines

Los Baños Dairy Training and Research Institute, March 2004

3

• The Utilization of Cement as a Binding Material in the Production of

Bagasse Particle Boards, March 2004

• A Preliminary Hazard Analysis of The Stock Loading and Dispatching

Operations at Abenson’s South Luzon Depot in Carmona, Cavite,

March 2004

• Undergraduate Practicum: Logistical Analysis of Abenson’s Carmona

Supply Depot for an Improved Warehouse Layout, Materials

Management, and System Safety, April 2004

Professional Experience

Restaurant Systems Senior Officer/Supervisor, Jollibee Foods

Corporation, August 2011 to Present

Functions:

• Responsible for production process engineering and system

engineering

• Responsible for Lean/Six Sigma implementation

• Oversees end to end project implementation (project management)

• Analyzes and validates food production processes in stores

• Regularly visits stores for pilot implementation of new systems/new

production parameters/new equipment, for effectiveness validation of

existing processes, and for identification of areas of improvement for

Kaizen/Lean Production/process simplification

• Analyzes production process complexity of existing products for lean

production

• Validates existing standards and food preparation parameters set by

Research & Development for operationalization and sustainability

• Spear-headed the development implementation of Lean Systems- In-

station Process Control, In-station Quality Control, and Product

Launch Quality Operating System

• Implements process improvement & process simplification projects

for food production processes in stores

4

• Evaluates facilities and equipment design/capacity and recommends

improvements/solutions for operationality concerns

• Analyzes systems and develops equipment to support product quality

consistency and process efficiency requirements

• Recommends and implements operational expense/cost reduction

projects

• Reviews and evaluates tools & utensils design and functionality and

recommends design improvements

• Redesigns existing tools & utensils/designs & implements new tools

and utensils as needed

• Coordinates with Service/Maintenance Engineering for equipment

maintainability/repairability

• Attends and participates in the Product Gold Standard Consistency

Cross-Functional Team's activities to help in stores' attainment of

product/output quality consistency

• Coordinates with Research & development for the development of

product standards/production parameters during the development of

new systems/equipment/tools & utensils

• Handles contractual employees (project engineer and document

specialist) for data gathering for projects/studies and regular updating

of product manuals

• Gives orientation to Operations Area Managers, Store Mangers, and

Operations Directors for equipment and facilities evaluation for their

regular Quality Audits

• Participates in focus group discussions with Senior Management and

Operations to help address critical issues and concerns

• Reviews facility/crew safety

• Coordinates with Human Resources- Training & Development for the

development of training materials for store crew

• Conducts laboratory/test kitchen-based experimentation & testing for

the simulation and development of new systems, new production

parameters/standards, and new equipment

5

• Spear-headed the implementation of 8 Discipline Methodology for

addressing product quality concerns

Current Lean/Six Sigma Projects:

• Systems design and development of In-station Process Control for

store operations

• Systems design and development of In-station Quality Control for

store operations

• Metrication systems design and development for store operations

performance inclusive of Equipment Performance and Quality Hit

Rate

• Quality enhancement program (Quality Management System) for

product quality consistency

• Raw materials thawing system improvement for product quality

consistency

• Equipment development and life cycle management and project

implementation process development

Other Major Projects:

• Development of Minimal Serving Parameters for Non-core Products,

April 2012

• Production Parameter Development for the Implementation of Electric

Fryers and Griddle for Jollibee NAIA Terminal 3, July 2012

• Six Sigma Project: Deep Frying Equipment Load Size Effect on Oil

Wastage Review & Validation, November 2012

• Lean Systems Project: Value Stream Map Development and

Improvement Projects Identification for Core Products, December

2012

• Design & Construction of Jollibee NAIA Terminal 2 International

Arrival, June 2013

Inclusive of:

- Store layout design development

6

- Design and fabrication of food production stainless steel facilities

- Testing and implementation of new holding equipment

- Equipment and stainless steel facilities supplier sourcing (with

Purchasing)

- Product standards setting (with Research & Development)

• Dry Convection Holding Equipment Design & Capacity Review, July

2013

• Design Review for Oil Submersion Baskets for Deep Frying

Equipment, September 2013

• Testing and Implementation of Alternative Filter Papers for

Operational Expense/Cost Reduction (On-going)

Trim, Chassis, Final Assembly, & Power Train (TCF & PT) Process

Engineer, Ford Motor Company Philippines, Inc. May 2005 to April 2007;

June 2008 to July 2011 *

Functions:

• Had overall responsibility for manufacturing plant assembly process

requirements

• Provided engineering support to the TCF & PT production line’s Trim

Line, Engine Dress-Up, High Line, Final Assembly, and Repair areas

through work station design and improvement and facilities and

tooling development

• Implemented lean manufacturing work station designs

• In charge of the entire TCF & PT production line as the lone process

engineer during the initial set-up of Ford’s night shift operations in

September 2005

• Maintained Vehicle Assembly Manuals, Knock-down Guidance

Sheets, and Assembly and Parts Drawings

• Developed Operation Instruction Sheets

• Developed Control Plans and Process Potential Failure Mode and

Effects Analyses

*Pursued basic Japanese and Mechanical Engineering Graduate Studies in U.P. Diliman, June 2007 to March 2008

7

• Allocated and divided processes in the assembly line based on Time

Studies, Assembly Manuals, and Assembly Drawings

• Conducted assembly process audits to ensure the correctness of the

assembly operations

• Led the evaluation, investigation, and resolution of assembly

/workmanship- related quality issues identified in in-plant inspection

stations and in the Repair Bay, as well as in dealerships attributable

to the vehicle power train, under-chassis, interior/exterior, and

electrical area operations and to parts quality issues

• Coordinated with Ford and Mazda vehicle program teams, overseas

engineering, and other Ford affiliates for the resolution of design

issues and assembly issues

• Participated in Variability Reduction Team Activities to address both

in-plant and external (warranty) quality issues

• Participated in Six Sigma Projects to address assembly-related quality

issues

• Developed and implemented local engineering changes and

deviations

• Conducted functional builds and testing for both local and imported

parts

• Participated in and assisted Product Development Engineering with

vehicle local content program developments

• Participated in departmental strategy, policy deployment, and

imperatives development and implementation

• Participated in the plant certification process of ISO 9001 & 14001

• Conducted feasibility & cost benefit studies for future business

opportunities related to manufacturing

• Participated in Total Cost Management- Value Analysis and Value

Engineering for the implementation of cost reduction initiatives

• Coordinated with the Material Planning and Logistics Department for

the preparation of engineering changes and parts modification

instructions to be implemented in the production line

*Pursued basic Japanese and Mechanical Engineering Graduate Studies in U.P. Diliman, June 2007 to March 2008

8

• Implemented engineering changes and parts modification instructions

in the production line for all vehicle models through facilities and

tooling support and Control Plan and Process Failure Mode and

Effects Analyses updates (Ford Focus, Ford Escape, Mazda 3, and

Mazda Tribute)

• Led the implementation of Statistical Process Control in the

production line

• Addressed safety issues identified in-plant and membership in the

Health and Safety Committee

• Attended daily production meetings and daily quality meetings to help

address both production and quality issues identified in-plant

• Led the implementation of process improvement/enhancement

projects from ideation to completion

Trim, Chassis, Final Assembly, & Power Train (TCF & PT)

Manufacturing Facilities and Tooling Engineer, Ford Motor Company

Philippines, Inc. May 2005 to April 2007; June 2008 to July 2011 *

Functions:

• Had overall responsibility for the provision of machinery/equipment

and tooling to the assembly plant

• Overall responsibility for the provision of new facilities and the

modification of existing facilities to suit the assembly plants production

process requirements

• Implemented support projects in the production line and participated

in the design and development of machinery/equipment, tools, and

jigs during the implementation of support projects

• Planned and allocated departmental Facilities & Tooling and Project

Expense budgets

• Supported the Ford Production System (FPS) through project

implementation, productivity improvements, best practice replication

from other Ford affiliates, and element Leadership

• Conducted supplier/ vendor sourcing for engineering projects

*Pursued basic Japanese and Mechanical Engineering Graduate Studies in U.P. Diliman, June 2007 to March 2008

9

• Coordinated with local plant engineering for the

commissioning/decommissioning, testing, endorsement,

maintenance, and troubleshooting, facility modification, and disposal

of machinery/equipment and tooling

Major Process /Facilities and Tooling Engineering Projects and

Project Studies

• Fabrication of Power Train and Underbody Sub-assembly Jigs, May

2005 to April 2007; June 2008 to present

• Fabrication of Vehicle Interior and Vehicle Exterior Assembly Jigs,

May 2005 to April 2007; June 2008 to present

• Design and development of Underbody Assembly Line Platform, 2005

• Six Sigma Project: Reduction of In-System Damages Focusing on

Major Chips and Scratches in Vehicle Exterior and Interior, August

2005

• Project Study: Ford Focus Fuel Tank Sub-Assembly Localization (in-

house assembly), 2006

• Fabrication of Fuel Delivery Module to Fuel Tank Subassembly

Bench, 2006

• Fabrication of Fuel Tank Leak Test Machine, 2006

• Fabrication of Fuel Delivery Module Resistance and Current Test

Machine, 2006

• Vehicle Configuration and Testing System Set-up for all models, April

2006

• Lean Systems Project: Design and Fabrication of Commonized SUV

and Sedan Engine Lifter, May 2006

• Lean Systems Project: Design and Fabrication of Commonized SUV

and Sedan Rear Suspension Lifter, May 2006

• Fabrication of Drive Shaft Pressing Machine for the insertion of drive

shafts to the axle bearing assemblies with estimated savings of PHP

746,500.00, April 2007

• Fabrication of Vehicle Body Side Protection Installation Jigs, 2008

10

• Fabrication of Vehicle Transmission Lifting Jigs, 2008

• Fabrication of Vehicle Rear Seat Striker Installation Jigs, 2008

• Design and Fabrication of Vehicle Tire Lifter, August 2008

• Project Study: Automated/Semi-Robotic Glass Primer and Sealant

Applicator, August 2008

• Project Study: Vehicle Door-off Process, June 2008

• Modification of Engine Dress-Up Area Engine Trolleys and Sub-

Assembly Tables, 2009

• Fabrication of Ford Escape Back Window Sub-assembly Jig, June

2009

• Fabrication of Ford Focus Transmission Lever Setting Safety Jigs,

August 2009

• Fabrication of Engine Drive Belt Setting Jig, 2010

• Introduction of Automated Engine Number Engraving System, May

2010

• Design, Development, and Fabrication of a Hold & Drive Tightening

Tool for Vehicle Front Suspension Knuckle Tightening, June 2010

• Fabrication of Vehicle Seat Lifter, August 2010

• Design and Fabrication of Vehicle Front Suspension Sub-assembly

Bench, June 2011

• Facility Set-up of Complexity Broadcast System for Parts Installation

Error-Proofing with local IT, 2011

• Fabrication of fiber glass vehicle protectors, 2011

Minor Process/Facilities and Tooling Engineering Projects

• In-house fabrication of jigs and tools for the Power Train, Underbody,

Final Assembly, Vehicle Interior & Exterior, May 2005 to April 2007;

June 2008 to July 2011*

*Pursued basic Japanese and Mechanical Engineering Graduate Studies in U.P. Diliman, June 2007 to March 2008

11

• Purchase of pneumatic power tools and manual torque tools, special

repair tools for production line and repair bay use, May 2005 to April

2007; June 2008 to July 2011*

• Facility modification through equipment transfer, May 2005 to April

2007; June 2008 to July 2011*

• Fabrication of Body Alignment Tools, 2008

• Fabrication of Rear Suspension Compression Clamps, August 2008

• Fabrication of Vehicle Door Capping Installation Tool, 2008

• In-house fabrication of Mazad3 Front End Module Installation Jig

Overhead Mounting Structure (Presidential Health & Safety Awards

Entry), September 2009

• Fabrication of Body Side Protection Molding Press Rollers, June 2010

• Fabrication of Front Wiper Setting Jigs, July 2010

Vehicle Configuration and Testing System (VCATS) Engineer, Ford

Motor Company Philippines, Inc., May 2005 to April 2007; June 2008 to July

2011*

Functions:

• Handled the VCATS inclusive of vehicle module programming and

electronic vehicle diagnosis

• Handed and led VCATS facility set-up with Teradyne and local IT

• Handled and controlled the usage and procurement of VCATS

equipment

• Handled system and equipment upgrades

• Supported new model launches through coordination with Teradyne

for the development VCATS programs for new models and existing

model upgrades

• Resolved major VCATS issues identified in both local and ASEAN

export markets

*Pursued basic Japanese and Mechanical Engineering Graduate Studies in U.P. Diliman, June 2007 to March 2008

12

Trim, Chassis, Final Assembly and Power Train Ford Production

System Quality Operating System (QOS) Element Leader, Ford Motor

Company Philippines, Inc., July 2006 to April 2007

Functions:

• Led the implementation of the Ford Production System Quality

Operating System Element to drive in-station process control/ in-

station quality control and for the immediate capture of process-

related concerns

• Led the TCF & PT team in the achievement of the 2006 Quality

Operating System target level, certified by Ford Asia Pacific and

Australia auditors in March 2007

• Led the implementation of the Vehicle Operations Torque Integrity

Assurance Program

• Led the implementation of Torque Process Potential Studies for new

and existing models in the assembly line for processes involving both

critical and significant vehicle characteristics

• Led the establishment of Control Point Inspection process to capture

warranty concerns in the assembly line

• Led and established Blue-Q Audits for compliance by production team

leaders to capture assembly-related warranty concerns and common

customer concerns

• Monitored the implementation of Statistical Process Control in the

assembly line and led the resolution of concerns related to processes

with low capability indexes

• Conducted meetings with application areas to foster two-way

communication throughout the QOS implementation

• Ensured that ISO objectives were met

• Provided guidance and answers to inquiries, and helped resolve

issues/ concerns of work groups regarding QOS principles and

processes

13

Trim, Chassis, and Final Assembly (TCF) Ford Production System

Manufacturing Engineering (ME) Element Leader, Ford Motor Company

Philippines, Inc., June 2008 to July 2011

Functions:

• Led the TCF Process Engineering group in the compliance with the

Ford Global Project Implementation Procedure and monitored all on-

going projects

• Led the TCF Process Engineering group in the implementation of

support projects

• Led TCF in achieving Ford Production System Manufacturing

Engineering Element annual target levels

• Led and supporting the implementation of the Ford Total Preventive

Maintenance Program in the TCF Department

Trim, Chassis, & Final Assembly (TCF) Ford Production System Cost

Element Co-Leader, Ford Motor Company Philippines, Inc., January 2010

July 2011

Functions:

• Led the TCF Department in the development of cost savings or cost

avoidance initiatives and projects

• Conducted supplier/vendor resourcing for production bulk

materials/consumables and tooling

• Conducted supplier/ vendor resourcing for engineering projects

• Consolidated and assessed the feasibility of cost savings

projects/initiatives and provided engineering buy-in

14

Trim, Chassis, & Final Assembly Launch Engineer, Ford Motor Company

Philippines, Inc., May 2009 to July 2011

Functions:

• Provided decision and leadership in the TCF Department’s new model

launch preparation

• Developed departmental launch plans for existing model upgrades

and for new models

• Established work plans for new model launches and coordinating with

the local area management for the implementation

• Developed and installed tooling and facilities

• Established critical characteristics and design for assembly

• Validated Control Plans and Process Failure Mode and Effects

Analyses

• Ensured that launch objectives for timing, quality, and costs were met

• Coordinated the resolution of launch issues with manufacturing

• Represented the TCF Department during Launch Meetings

• Conducted validation checks of Vehicle Significant Characteristics

and Critical Characteristics

• Conducted vehicle audits based on the specifications in Product

Delivery Letters during initial builds and Job1 builds

New Vehicle Model/ Program Studies

• Ford Figo Launch, January 2010

• Ford Transit Launch, August 2010

• Ford Kuga Launch, November 2010

15

Vehicle Launch Projects

• Launch of Ford Escape Model Year 2009, April 2010

• Launch of Ford Focus Mid-cycle Action OPD, April 2010

• Launch of Ford Focus In-cycle Action 2, July 2010

• Launch of Ford Escape with DVD and Navigation System Special

Vehicle Package, October 2010

• Launch of Mazda 3 Special Vehicle Packages, August 2009 to 2011

Trim, Chassis, and Final Assembly Launch Product Specialist, Ford

Motor Company Philippines, Inc., May 2009 to July 2011

Functions:

• Attended and participated in the Vehicle Attribute Prototype Builds

• Identified early manufacturing and designing issues and quality

concerns

• Performed ergonomics assessments of manufacturing workplaces

• Conducted preliminary assembly process reviews

• Identified quality/design improvements

• Identified critical operations and assessing training requirements

• Developed Quality Process Sheets- Operation Instruction Sheets,

Work Element Sheets, Control Plans, and Process Failure Modes and

Effects Analyses

• Participated in Emphasis Builds to verify assembly sequence,

product/process compatibility, and identifying changes needed in the

process sheets

• Coordinated with the plant Safety Team and conducting ergonomics

assessments of manufacturing workstations

• Identified and tracked Quality/Design concerns during continuous

builds prior to Job1 Build and participating in their resolution

16

• Identified base, difficult, and critical operations and assessed training

requirements with local training coordinators

• Participated in Manufacturing Process Reviews and Sign-off

• Conducted parts retrofitting for pre-production vehicles

Plant-wide Ford Production System Manufacturing Engineering

Element Leader/Chief Manufacturing Engineer, Ford Motor Company

Philippines, Inc., June 2010 to July 2011

Functions:

• Revised and updated Manufacturing Engineering Procedures for

plant-wide implementation and compliance

• Led and facilitated Manufacturing Engineering Council Meetings and

led plant-wide implementation of policies/procedures/resolutions

• Led Ford Motor Company Philippines in achieving the highest

possible target Ford Production System level for Manufacturing

Engineering

• Led and monitored plant-wide compliance with the Global Project

Implementation Procedure

• Led and introduced the Minor Project Approval Process for plant-wide

compliance and for best practice replication in the Ford Asia Pacific

and Africa Region affiliates

• Trained newly hired engineers in project implementation based on

Ford Production System Standards

• Led cross-functional project implementation procedure compliance

audits

17

Certifications, Trainings, and Awards Received

• Lean Manufacturing Design and Lean Manufacturing Principles, Ford

Motor Company Philippines, Inc., August 2005

• Worldwide Engineering Release System, Ford Motor Company

Philippines, Inc., November 2005

• Six Sigma Greenbelt Certification, Ford Motor Company Philippines,

Inc., December 2005

• Measurement Systems Analysis, Ford Motor Company Philippines,

Inc., January 2006

• Facilities & Tooling Review Process, Ford Motor Company

Philippines, Inc., January 2006

• Process Failure Modes and Effects Analysis, Ford Motor Company

Philippines, Inc., January 2006

• Standard Corporate Conduct, Ford Motor Company Philippines, Inc.,

January 2006

• Project Implementation and Management, Ford Motor Company

Philippines, Inc., August to September 2006

• Reliability and Maintainability, Ford Motor Company, Philippines, Inc.,

2006

• Failure Reporting and Corrective Action Implementation System, Ford

Motor Company Philippines, Inc., 2006

• Value Stream Mapping, Ford Motor Company Philippines, Inc., July

2006

• Threaded Fastener Joint Design, Ford Motor Company Philippines,

Inc., December 2006

• Visual Factory, Quick Change-Over, Error Proofing, and 5S, Ford

Motor Company Philippines, Inc. 2006

• Quality Operating Systems, Ford Motor Company Philippines, Inc.,

2006

• Total Preventive Maintenance, Ford Motor Company Philippines, Inc.,

2006

• Autodesk Certification for AutoCAD, Microcadd Technologies, July

2007

18

• Industrial Material Flow, Ford Motor Company Philippines, Inc.,

October 2008

• ISO14001 Environmental Management System internal Auditor’s

Training Course Completion and Internal Auditor Certification, Ford

Motor Company Philippines, Inc., December 2008

• Train The Trainer, Ford Motor Company Philippines, Inc., February

2009

• Synchronous Material Flow, Ford Motor Company Philippines, Inc.,

July 2009

• Material Approval and Toxicology System, Ford Motor Company

Philippines, Inc., 2009

• Open Book Management- Understanding the Challenge of Global

Businesses, Ford Motor Company Philippines, Inc., April 2010

• Open Book Management- Market Globalization, Ford Motor

Company Philippines, Inc., April 2010

• Open Book Management- Sustainable Business Models, Ford Motor

Company Philippines, Inc., April 2010

• Open Book Management- Regionalization, Ford Motor Company

Philippines, Inc., May 2010

• Open Book Management- A New Mindset for Cost & Revenue, Ford

Motor Company Philippines, Inc., May 2010

• ISO 9001:2008 Quality Management System internal Auditor’s

Training Course Completion and Internal Auditor Certification, Ford

Motor Company Philippines, Inc., January 2011

• Project Management Overview, Jollibee Foods Corporation, 2012

• Writing for Non-Writers, Jollibee Foods Corporation, January 2013

• Recipe Hazard Analysis and Critical Control Points, Jollibee Foods

Corporation, March 2013

• Communicating for Leadership Success, Jollibee Foods Corporation,

September 2013

• Innovative Thinking System, Jollibee Foods Corporation, October

2013

• Life Orientations, Jollibee Foods Corporation, October 2013

19

• Project Management, Technopoly Inc., May-June 2014

• Cadet of the Year Award (University of the Philippines Los Baños

Reserve Officers’ Training Corps) for outstanding performance and

Leadership as a commanding officer of the University of the

Philippines Rayadillo Honor Guard Battalion, March 2001

Memberships

• Member, Philippine Institute of industrial Engineers Student Chapter

• Founding member, University of the Philippines Los Baños Industrial

Engineering Students Organization

• Vice Chair, Bible Readers Society International, University of the

Philippines Los Baños Chapter, 2001 – 2003

Personal Qualifications

• Computer literate, with working knowledge of MS Office Applications,

ProModel, Minitab, MS Project, and AutoCAD

• Able to work independently with minimal or no supervision

• Able to work in a team set-up

• Observant, with an eye for details

• Willing to undergo training and learn about the business/profession

• Enthusiastic and committed worker

• Proficient in English in both oral and written communication

• Possesses leadership/supervisory and management skills

• Results and focus-oriented, analytical, keen in data analysis

• Possesses Project Management Skills

20

Others

• Conceptualized the study and headed the design of an impact test

apparatus to determine the effect of the geometry, position, and depth

of indentations in establishing the strength of aluminum as a physics

class project and as a physics class group project entry in the

university physics fair which won second place, University of the

Philippines Los Baños, November 2000

• Led the conceptualization of the utilization of a linear induction engine

or coil gun in the design and development of a frictionless linear track

for the measurement of kinematic values as a physics class group

project and as an entry in the university physics fair, University of the

Philippines Los Baños, August 2001

• Conceptualized and led the study of the utilization of cement as a

binding material in the production of bagasse particle boards as a

class group project in an engineering materials class, University of the

Philippines Los Baños College of Engineering & Agro-Industrial

Technology, March 2004