BRIAN MERJOU
International Blvd, Houston TX, ****4
(C) 832-***-**** *.******.**@*****.***
Permanent resident, authorized to work in the U.S. for any employer
Willing to Travel and Relocation
Power Systems Design UPS NFPA Predictive Maintenance Arc Flash Electrical
Equipment Sizing Electrical System Commissioning Engineering, Procurement &
Construction (EPC) Hazardous Area Classification Oil & Gas, Refinery and Petrochemicals.
PROFILE
Power Electrical Engineer with over 8 years of experience in Engineering, Procurement and
Construction (EPC) including in Oil and Gas (O&G) Industry. Successful track record of design,
installation, operation of power system distribution and maintenance supervision of electrical
equipment in Oil &Gas (O&G) industry. Expertise in design, commissioning, testing, startup, operation,
maintenance and troubleshooting of all electrical distribution system and electrical equipment in oil
and gas plants. Provide technical guidance and leadership to other personnel or groups. Ability to
work on multiple projects in parallel and highly complicated projects. Adept at working under
pressure, leading multiple tasks and manage time effectively to ensure that deadlines are meet and
necessary tasks not become overlooking. Ability to effectively plan prioritizes, execute, and follow up
in a timely manner and anticipate problems and overcome obstacles.
QUALIFICATIONS & EXPERTIES
Expertise on Power system analysis such as load flow, short circuit, Arc flash, motor starting,
relay coordination, etc.
Proficient in cable sizing, transformers, conduits, UPSs, DCPs, VFDs, switchgear, relays, MCC,
CB, fuses, etc.
Design single line and schematic diagram, control wiring and cubicle schematic with AutoCAD
Electrical
Expertise in substation design and cable room arrangement
Proficient in SKM, ETAP, DIGSILENT power system analysis
Well versed in API, NFPA, NFPA 70E, NFPA 70B, ANSI, NETA and IEC standards and cods.
Knowledge about hazardous area classification
Evaluation and calculation the reliability of power system
Verification, analysis and troubleshooting on low voltage and high voltage electrical
equipment
Expert in Performance pre-commissioning, commissioning, start-ups test according to NETA
Preventive maintenance planning with definition influence job analysis
Predictive maintenance planning for electrical equipment failure reduction
Verify all vendor’s drawings, plans and manuals to be update and as-built
Knowledge about concepts & requirements of total productive maintenance
Page 1 of 2
Power dynamic study by DIGSILENT power factory
PROFFESSIONAL EXPERIENCE
ARVANDAN OIL & Gas Co. (AOGC), IRAN
2008-2015
Arvandan Oil & Gas Company engages in exploration and production of oil and gas. The company has
founded in 1985 and it is located in Khorramshahr, Iran. Arvandan Oil & Gas Company operates as a
subsidiary of National Iranian Oil Company.
Electrical Design Engineer, 11 / 2011 – 01 / 2015
Created electrical drawings such as single-line, block, schematics and termination diagrams
Modified control distribution system and created as-built of drawing after commissioning
performance tests
Designed electrical substation at high/medium and low voltage levels between 132kV to 400V.
Designed protection system and coordination between them
Performed Power system studies such as load flow, short circuit, arc flash analysis, etc. using
ETAP.
Designed lighting system, ground grid and equipment sizing such as transformers,
switchgears, conduits, cables, etc.
Reviewed vendor’s drawings, plans, manuals and documents.
Supervised on performance of projects and create punch list about deficiencies.
Developed Substation and cable room arrangement.
Evaluated and calculated electric substation reliability.
Electrical Maintenance Engineering, 07 / 2008 -11 / 2011
Planed, coordinated and job analysis defined for preventive and predictive
maintenance for using CMMS.
Lead electrical maintenance group to do maintenance and troubleshooting on all
electrical equipment.
Operation, installation and maintenance on transformers, motors, VFDs, SFCs, UPSs,
DCPs, Switchgear, etc.
Examined, Standardized and created spare part list for electrical equipment.
Performed Site acceptance tests and Factory acceptance tests.
Performed pre-commissioning, commissioning and start up tests.
Performed troubleshooting frequently in time-sensitive and mission critical situation.
Provided electrical load list and 2 years spare part.
POWER ELECTRICAL DISTRIBUTION CO. FARS, IRAN
2006-2008
Page 2 of 2
Electrical power Distribution Company has been deliver practical activity in the field of electricity distribution
customers and development, construction, Rebuilding, service, maintenance and operation of the
distribution system.
Electrical Design Engineer, 08 / 2006 – 07 / 2008
Planed, designed and created schematics for electrical distribution system.
Selected, calculated and designed protection system and relay coordination in power
distribution network.
Sizing underground and overhead lines, transformers, cables, cable trays and conduits
Improved reliability and stability by modification and proper coordination of protection system.
Designed electrical substation at high/medium and low voltage levels between 33kV to 400V.
Performed Power system studies such as load flow, short circuit, arc flash analysis, etc. using
DIGSILENT.
Provided bill of material for projects
T E C H N IC A L P R O F IC IA N C E
Microsoft Office Suite (Excel, Word, Outlook, PowerPoint)
AutoCAD Electrical: Design single-line, block, schematic diagram for distribution and control
system
PSCAD : Analysis of Power system Transients and Dynamics
ETAP, Digsilent, and SKM: Power system analysis such as load flow, short circuit, Arc flash,
relay coordination, etc.
E D U C AT I O N
Master Degree, Electrical Engineering – Power / International
2013
Bachelor Degree, Electrical Engineering – Power / International
2006
Page 3 of 2