Post Job Free
Sign in

Customer Service

Location:
League City, TX
Posted:
February 24, 2015

Contact this candidate

Resume:

Larry E. Wildey

P

h

o

n

e

*

*

*

-

*

3

4

-

3

1

1

3

**** ******** *****

C

e

l

l

p

h

o

n

e

:

2

8

1

-

2

3

5

-

7

7

6

7

Dickinson, Texas 77539 E-Mail

*********@***.***

experience:

Aug 15, 2014 - present Express Trucking

Express delivery driver Flat bed Peterbuilt truck 10 speed duel axle

with air breaks.

Daily truck inspection Prior to leaving each day with a post inspection

at end of each day. Dispatches text picks to driver. Driver then routs to

customer location . Fills out load ticket proceeds to Location, Driver

directs loading of truck .. Driver then straps down load as required.

Pick-up shipping papers and and required MSDS or Placards installs as

required Checks in with dispatch prior to leaving for delivery location .

Check in with receiving dept. upon arrival Removes straps and waits to

be unloaded. Finishes paper work gets signed bill of lading Checks with

dispatch proceeds to next stop

May 2, 2014 - Aug 15, 2014 Dickinson Independent School District

School Bus Driver Transport Elementary and Junior High School Students

to and from School

Inspect School bus prior to and after each and every trip. Fill out

Inspection log. Fill bus with fuel. Clean bus inside.

Keep records of discipline problems on bus .Make calls to parents to talk

about problems with their student. Follow up with file of phone call going

in to student file in office.

September 2005 - August 2013 Circuit Breaker Sales & Repair

Electrical Tech. Repair & Service Power Circuit Breakers 480Volt --- 138K

v Breaker

Inspect breaker for any problems, electrical and mechanical.

Repair or rebuild breakers as required after customer approval to

proceed.

When rebuilding breakers, I totally disassemble, clean and replate all

parts. Replace needed Electrical parts. Upgrade. breaker controls to

electronic as required

Reassemble Breaker, Inspect and adjust breaker for proper operation.

Hypot, Megger, Current Injection testing is done. Complete all test

reports

Ship breaker or Deliver breaker to customer

I also do field service on these same Breakers, repair and trouble shoot

at customer site

September 9, 2004 - Feb 5- 2005 Stevens transport

Over the road truck Driver

Pick-up and deliver frozen food to warehouses. Pre-trip and post- trip

truck inspections. Daily time log kept. Kept truck clean both inside and

out. Filled out expense reports, Send signed shipping paper to office via

Fedex upon completion of delivery,

Received new pick-up order via fax,

Wife got cancer had to be home to take care of her, got local job

tobe home with her

June 1980 - August 2004 Powell Electrical

Manufacturing

Company, Inc.

Worked in the Apparatus Service Division as a warranty project coordinator

for 7 years. This is a fast paced, customer oriented Position. I worked

with 60-80 projects at a time and responsibilities included but not limited

to;

-Order Entry into computer system;

-Working with the engineering department

-Serving as primary contact for customers regarding post shipment

concerns or

problem;

-Having materials made and shipped by shop or Vendors as needed;

-Solving wiring and relay problems with and for the customer;

-Arranging for Service Engineer to travel go to job sites as needed for

inspections,

repair or service.

-Working with customers, sales representatives and installing

contractors, as

required.

Project Coordinator in the Sales Department for 6 years, was Responsible

for $6M $10M worth of projects at a time. Responsibilities included:

-Entering orders into computer system;

-Working with the engineering department to get drawings completed and

sent to

customer for approval;

-Serving as single point of contact for customers to return drawings,

make

changes, and check on progress of project;

-Forwarding the approved drawings to engineering for corrections,

or changes as required;

-Processing any change orders;

-Confirming shipping date with customer and setting up all required

inspections

-Expediting the project through the shop to meet ship dates and changes

in the

project

Helped to set up and then was in charge of the breaker manufacturing

department for 5 years

Was asked to join the Research & Development Department to help start up a

new project-an electrical circuit breaker, 5K -15K volts, 1200 - 3000 amps.

Helped to set up . Breaker manufacturing department . Was Leadman for 5

years

Began working in the shop as an electrical bus designer and worked in

several departments, moving up to department leadman.

I did steel fabrication and assembly on low and medium voltage switchgear

enclosures.

.

education:

Graduated, Centerville High School

Centerville, Indiana, USA

Indiana University East

Richmond, Indiana

Completed 2 semesters criminal justice course.

San Jacinto Junior College, South

Houston, Texas

-Completed 3 semesters of business management course.

College of Mainland

Texas City, Texas

Completed 3 computer courses.

Powell Electric Mfg. Co.

Houston, Texas

Completed additional computer courses and 3 seminars on

technical

Writing.

Truck driving School 2004

houston coummity college

now Hold class a cdl License Haz mat and tanker endorsments

reference:

Can provide references as required. ..

.



Contact this candidate